← Back
Elevator cooperative
Coop City
2049 BARTOW AVENUE · BIN 2095393
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
13,540,113 sfGross Floor Area
10,948Units
LL97 CoveredRent Stabilized5,282 Open Violations 5,275 unresolved · 7 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: RIVERBAY CORPORATION · 5,048,550 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
Architecture
Bulkhead1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RIVERBAY5203/22/2026
CO-OP CITY RIVERBAY CORP.103/22/2026
RIVERBAY MANAGEMENT.403/22/2026
BRENNER (RIVERBAY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MERRITT ENGINEERING CONSULTANTS, DPC204/26/2023
ENTHINK ENGINEERS LLC201/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXO INDUSTRIES CORPGeneral Contractor607/08/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MERRITT ENGINEERING CONSU460204/26/2023
DEAN MENDEZ ARCHITECT, P.8621111/08/2022
Building Lifecycle
All (89)Filed (4)Permit Issued (4)Signed Off (3)Facade (FISP) (13)Violation (60)Special Inspection (5)
07/23/2025
Violation issued (HPD, closed)
C
07/23/2025
Violation issued (HPD, open)
C
07/23/2025
Violation issued (HPD, open)
B
07/23/2025
Violation issued (HPD, closed)
A
07/09/2025
Violation issued (HPD, open)
A
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, open)
A
07/09/2025
Violation issued (HPD, open)
C
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, open)
A
07/09/2025
Violation issued (HPD, open)
A
07/09/2025
Violation issued (HPD, open)
B
05/31/2025
Violation issued (HPD, open)
B
05/31/2025
Violation issued (HPD, open)
B
05/06/2025
Violation issued (HPD, open)
B
05/06/2025
Violation issued (HPD, open)
B
02/28/2025
Violation issued (HPD, open)
B
02/28/2025
Violation issued (HPD, open)
B
02/28/2025
Violation issued (HPD, open)
B
11/06/2024
Violation issued (HPD, open)
A
10/25/2024
Violation issued (HPD, open)
B
10/25/2024
Violation issued (HPD, open)
B
10/15/2024
Violation issued (HPD, open)
B
10/15/2024
Violation issued (HPD, open)
B
10/15/2024
Violation issued (HPD, closed)
B
10/15/2024
Violation issued (HPD, closed)
C
10/15/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, closed)
B
09/09/2024
Violation issued (HPD, closed)
A
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, open)
C
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, closed)
B
09/09/2024
Violation issued (HPD, open)
A
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, closed)
B
08/30/2024
Violation issued (HPD, open)
C
04/16/2024
Violation issued (HPD, closed)
A
03/20/2024
Signed off — Alteration
X00813200-I1
03/20/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00813862-I1
03/14/2024
Signed off — Alteration
FACADE AND BALCONY RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00619214-I1
02/20/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade inspection completed
02/15/2024
Cycle 9 facade report signed — SAFE
01/10/2024
Permit issued — Sidewalk Shed
X00813200-I1-SH
01/10/2024
Violation issued (HPD, open)
B
01/10/2024
Violation issued (HPD, open)
B
01/10/2024
Violation issued (HPD, closed)
A
01/10/2024
Violation issued (HPD, open)
B
01/10/2024
Violation issued (HPD, closed)
B
04/26/2023
Filed — Alteration
FACADE AND BALCONY RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00619214-P1
04/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
04/26/2023
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
04/26/2023
Special inspection requirement — Post-installed Anchors
Christopher Krepcio
04/26/2023
Special inspection requirement — Masonry
Christopher Krepcio
04/26/2023
Special inspection requirement — Final
Christopher Krepcio
04/24/2023
Permit issued — General Construction
X00619214-I1-GC
01/25/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00813862-I1
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offEXO INDUSTRIES CORP01/10/2024
DOB NOWGeneral ConstructionSigned-offEXO INDUSTRIES CORP04/24/2023
DOB NOWConstruction FenceSigned-offEXO INDUSTRIES CORP01/25/2023
DOB NOWSidewalk ShedSigned-offEXO INDUSTRIES CORP01/18/2023
BISEQISSUEDPROTO CONSTRUCTION & DVLP10/22/2010
BISEQISSUEDRIVERBAY CORP01/19/2010
BISEQISSUEDRIVERBAY CORP01/19/2010
BISOTISSUEDPROTO CONSTRUCTION & DVLP09/18/2009
BISEQISSUEDPROTO CONSTRUCTION & DVLP05/22/2009
BISEQISSUEDPROTO CONSTRUCTION & DEVELOPMENT05/10/2008
BISEQISSUEDRIVERBAY CORP03/21/2008
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT01/28/2008
BISEQISSUEDRIVERBAY CORP01/18/2008
BISEQISSUEDPROTO CONSTRUCTION & DEVELOPMENT04/25/2007
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT04/05/2007
BISEQISSUEDPERIMETER BRIDGE & SCAFF02/23/2007
BISEQISSUEDRIVERBAY CORP01/29/2007
BISEQISSUEDRIVERBAY CORP01/29/2007
BISEQISSUEDRIVERBAY CORP01/20/2006
BISEQISSUEDRIVERBAY CORP01/20/2006
BISEQISSUEDRIVERBAY CORP01/05/2005
BISEQISSUEDRIVERBAY CORP01/05/2005
BISEQISSUEDRIVERBAY CORP02/24/2003
BISEQISSUEDRIVERBAY CORP02/24/2003
BISEQISSUEDRIVERBAY CORP08/16/2002
BISMHISSUEDNAB CONSTRUCTION CORP.05/22/1998
BISOTISSUEDNAB CONSTRUCTION CORP.09/25/1996
5 projects · most recent 01/18/2023
General Wiring
FiledStatusContractorScope
01/18/2023CompleteRICHARD NEU—
09/23/2022CompleteE-J ELEC. INSTALLATION COGeneral Wiring
03/23/2021Permit IssuedSTAR ELEC'L CONTRACTORS C—
02/25/2021Permit IssuedSTAR ELEC'L CONTRACTORS C—
09/02/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/26/2023Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
04/26/2023Tenant Protection Plan ComplianceDean Mendezspecial
04/26/2023Post-installed AnchorsChristopher Krepciospecial
04/26/2023MasonryChristopher Krepciospecial
04/26/2023FinalChristopher Krepcioprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026X00619214-P1Request digital key ↗
08/23/2026X00619214-I1Request digital key ↗
08/23/2026X00813200-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026X00619214-I1Open ↗
08/23/2026X00619214-P1Open ↗
08/23/2026X00813200-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026X00619214-I1Open ↗
08/24/2026X00619214-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026X00619214-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X00619214-I1Open ↗
08/23/2026X00619214-P1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00813200-I1Open ↗
08/13/2026X00813862-I1Open ↗