Public elementary, junior or senior high
P.S. 159
205-01 33 AVENUE · BIN 4134525
💬 Discuss this project
1957Year Built
3Stories
W1Building Class
R2AZoning
85,920 sfGross Floor Area
0Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 90,000 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction49p · 2 filings · 20 docs
Floor 3Under Construction35p · 1 filing · 20 docs
Floor 2Under Construction34p · 1 filing · 20 docs
Floor 1Under Construction35p · 1 filing · 20 docs
Sub-BasementUnder Construction41p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY4107/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION303/22/2026
DEPT.OF EDUCATION P.S.159103/22/2026
PMY CONSTRUCTION203/22/2026
PS 159 DOE1303/22/2026
DOE PS 159 040803/22/2026
AMCON CONTRACTING103/22/2026
DEPT. OF EDUCATION 0103/22/2026
DOE P.S. 159403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV INCORPORATED803/20/2026
AK CONSULTING SERVICES, INC404/08/2025
AME SERVICES INC307/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV1403/21/2026
AME SERVICES603/21/2026
AK CONSULTING SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMCON CONTRACTING CORPGeneral Contractor1404/12/2026
FIDELIS CONTRACTING INCGeneral Contractor807/08/2026
ROMA SCAFFOLDING INCGeneral Contractor707/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
PACIFIC ELEC'L CONTR'G INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001012/17/2025
Building Lifecycle
All (156)Filed (15)Permit Issued (26)Signed Off (4)Violation (60)Inspection (3)Objection (18)Special Inspection (30)
06/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2026
Violation issued (ECB, closed)
Construction
05/06/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/10/2026
Permit issued — General Construction
Q00840239-I1-ST
04/10/2026
Permit issued — General Construction
Q00840239-I1-GC
03/20/2026
Filed — Alteration
Q159_Remove and replace exterior masonry, parapets, roofing, windows, and exterior lighting.
Q00840239-P6
03/11/2026
Violation issued (FDNY_ORDER, closed)
03/11/2026
Violation issued (FDNY_ORDER, closed)
03/11/2026
Violation issued (FDNY_ORDER, closed)
02/24/2026
Special inspection requirement — Lighting controls
NELSON LOPEZ
02/24/2026
Special inspection requirement — Insulation placement and R values
NELSON LOPEZ
02/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
NELSON LOPEZ
02/24/2026
Special inspection requirement — Fenestration air leakage
NELSON LOPEZ
02/24/2026
Special inspection requirement — Exterior lighting power
NELSON LOPEZ
02/24/2026
Special inspection requirement — Final
NELSON LOPEZ
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
02/24/2026
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
02/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
02/24/2026
Special inspection requirement — Subgrade Inspections
NELSON LOPEZ
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
02/24/2026
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
02/24/2026
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
02/24/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
02/24/2026
Special inspection requirement — Masonry
NELSON LOPEZ
02/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
NELSON LOPEZ
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
02/12/2026
Signed off — Alteration
Filing for fence installation on behalf of contractor
Q00907017-I1
12/17/2025
Filed — Alteration
Q159_Remove and replace exterior masonry, parapets, roofing, windows, and exterior lighting.
Q00840239-P5
12/15/2025
Special inspection requirement — Final
NELSON LOPEZ
12/15/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
12/15/2025
Special inspection requirement — Masonry
NELSON LOPEZ
12/15/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
12/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
12/15/2025
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
12/15/2025
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
12/15/2025
Special inspection requirement — Subgrade Inspections
NELSON LOPEZ
12/15/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
NELSON LOPEZ
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
12/15/2025
Special inspection requirement — Exterior lighting power
NELSON LOPEZ
12/15/2025
Special inspection requirement — Fenestration air leakage
NELSON LOPEZ
12/15/2025
Special inspection requirement — Lighting controls
NELSON LOPEZ
11/07/2025
Signed off — Alteration
Filing for installation of sidewalk shed on behalf of contractor
Q00907014-I1
11/07/2025
Signed off — Alteration
Filing for installation of pipe scaffolding on behalf of contractor
Q00907012-I1
10/14/2025
Permit issued — Plumbing
Q00840239-S1-PL
09/26/2025
Violation issued (FDNY_ORDER, closed)
09/26/2025
Violation issued (FDNY_ORDER, closed)
09/26/2025
Violation issued (FDNY_ORDER, closed)
09/26/2025
Violation issued (FDNY_ORDER, closed)
07/22/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AT PS 159Q AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00723198-I1
07/18/2025
Permit issued — Support of Excavation
Q00723198-I1-SE
07/08/2025
Violation issued (ECB, closed)
Construction
07/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/29/2025
Violation issued (ECB, closed)
Construction
04/10/2025
Permit issued — Construction Fence
Q00907017-I1-FN
04/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AT PS 159Q AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00723198-P3
04/04/2025
Permit issued — General Construction
Q00840239-I1-ST
04/04/2025
Permit issued — Structural
Q00840239-I1-GC
03/14/2025
Objection resolved — Addressed
03/06/2025
Objection raised — Other
03/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AT PS 159Q AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00723198-P2
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAMCON CONTRACTING CORP04/10/2026
DOB NOWGeneral ConstructionPermit IssuedAMCON CONTRACTING CORP04/10/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC10/14/2025
DOB NOWSupport of ExcavationSigned-offFIDELIS CONTRACTING INC07/18/2025
DOB NOWConstruction FenceSigned-offAMCON CONTRACTING CORP04/10/2025
DOB NOWGeneral ConstructionSigned-offAMCON CONTRACTING CORP04/04/2025
DOB NOWStructuralPermit IssuedAMCON CONTRACTING CORP04/04/2025
DOB NOWSupport of ExcavationSigned-offFIDELIS CONTRACTING INC02/19/2025
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC02/04/2025
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/13/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC10/15/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC09/13/2024
DOB NOWConstruction FenceSigned-offAMCON CONTRACTING CORP04/09/2024
DOB NOWGeneral ConstructionPermit IssuedAMCON CONTRACTING CORP04/04/2024
DOB NOWGeneral ConstructionSigned-offAMCON CONTRACTING CORP03/28/2024
DOB NOWStructuralPermit IssuedAMCON CONTRACTING CORP03/28/2024
DOB NOWConstruction FenceSigned-offAMCON CONTRACTING CORP03/28/2024
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/22/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC10/10/2023
DOB NOWStructuralSigned-offAMCON CONTRACTING CORP10/06/2023
DOB NOWStructuralPermit IssuedAMCON CONTRACTING CORP10/06/2023
DOB NOWConstruction FenceSigned-offAMCON CONTRACTING CORP09/12/2023
DOB NOWSidewalk ShedSigned-offJSK 2 CORP09/12/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC09/11/2023
DOB NOWSupport of ExcavationSigned-offFIDELIS CONTRACTING INC07/27/2022
DOB NOWConstruction FenceSigned-offFIDELIS CONTRACTING INC07/05/2022
BISPLISSUEDVARSITY PLBG AND HTG INC08/04/2025
BISPLISSUEDVARSITY PLBG AND HTG INC08/04/2025
BISPLISSUEDVARSITY PLBG AND HTG INC08/08/2024
BISPLISSUEDVARSITY PLBG AND HTG INC08/08/2024
BISPLISSUEDVARSITY PLBG AND HTG INC07/31/2024
BISPLISSUEDVARSITY PLBG AND HTG INC07/24/2023
BISPLISSUEDVARSITY PLBG AND HTG INC07/24/2023
BISOTISSUEDPMY CONSTRUCTION CORP08/29/2022
BISOTISSUEDFIDELIS CONTRACTING INC07/27/2022
BISPLISSUEDVARSITY PLBG AND HTG INC07/27/2022
BISPLISSUEDVARSITY PLBG AND HTG INC07/27/2022
BISOTISSUEDFIDELIS CONTRACTING INC07/27/2022
BISOTISSUEDPMY CONSTRUCTION CORP11/30/2020
BISOTISSUEDPMY CONSTRUCTION CORP11/12/2019
+ 22 more permits on file
1 project · most recent 03/20/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/20/2026Permit IssuedVARSITY PLBG AND HTG INCStorm, Water/Sanitary
10 projects · most recent 04/20/2026
General Wiring Lighting
FiledStatusContractorScope
04/20/2026Permit IssuedPRECISION ELECL CONT CORPGeneral Wiring
11/04/2024CompleteCHARAN ELEC'L ENTERP'S IN—
11/07/2023Permit IssuedPACIFIC ELEC'L CONTR'G IN—
10/27/2023CompleteMILAD CONTRACTING CORP.General Wiring, Lighting
09/07/2023CompleteHYLAN DATACOM & ELECL LLC—
09/22/2020CompleteCHARAN ELEC'L ENTERP'S IN—
06/03/2020CompleteDYNAMO ELECTRICAL CORPGeneral Wiring
03/13/2020CompleteCHARAN ELEC'L ENTERP'S IN—
09/19/2019CompleteCHARAN ELEC'L ENTERP'S IN—
01/24/2019CompleteJ & Y ELECTRIC AND INTER*General Wiring
1 project · most recent 03/20/2026
Steel Concrete
FiledStatusContractorScope
03/20/2026Signed-offAMCON CONTRACTING CORPSteel, Concrete
1 project · most recent 05/09/2022
Fence
FiledStatusContractorScope
05/09/2022Signed-offFIDELIS CONTRACTING INCFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2026Pass-Final General Construction Non-Directive 14PassView ↗
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
02/24/2026Lighting controlsNELSON LOPEZenergy_progress
02/24/2026Insulation placement and R valuesNELSON LOPEZenergy_progress
02/24/2026Fenestration and door U-factor and product ratingsNELSON LOPEZenergy_progress
02/24/2026Fenestration air leakageNELSON LOPEZenergy_progress
02/24/2026Exterior lighting powerNELSON LOPEZenergy_progress
02/24/2026FinalNELSON LOPEZprogress
02/24/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
02/24/2026Structural Steel - DetailsNELSON LOPEZspecial
02/24/2026Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
02/24/2026Subgrade InspectionsNELSON LOPEZspecial
02/24/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
02/24/2026Structural Steel - WeldingNELSON LOPEZspecial
02/24/2026Concrete - Cast-In-PlaceNELSON LOPEZspecial
02/24/2026Post-installed AnchorsNELSON LOPEZspecial
02/24/2026MasonryNELSON LOPEZspecial
02/24/2026Subsurface Conditions – Fill Placement & In-Place DensityNELSON LOPEZspecial
02/18/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
12/15/2025FinalNELSON LOPEZprogress
12/15/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
12/15/2025MasonryNELSON LOPEZspecial
12/15/2025Post-installed AnchorsNELSON LOPEZspecial
12/15/2025Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
12/15/2025Structural Steel - DetailsNELSON LOPEZspecial
12/15/2025Structural Steel - WeldingNELSON LOPEZspecial
12/15/2025Subgrade InspectionsNELSON LOPEZspecial
Latest 25 of 55.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 159Education—
Project Q00722959 Alteration · Permit Entire · 05/09/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/24/2026Q00840239-I1Request digital key ↗
08/24/2026Q00840239-S1Request digital key ↗
08/24/2026Q00840239-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/24/2026Q00840239-P6Open ↗
08/24/2026Q00840239-I1Open ↗
08/24/2026Q00840239-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q00840239-I1Open ↗
09/23/2026Q00840239-I1Open ↗
09/23/2026Q00840239-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026Q00840239-I1Open ↗
09/23/2026Q00840239-I1Open ↗
09/23/2026Q00907012-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026Q00907014-I1Open ↗
08/13/2026Q00907012-I1Open ↗
08/13/2026Q00907017-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026Q00840239-I1Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/15/2026Q00723198-P2Open ↗
08/15/2026Q00723198-I1Open ↗
08/13/2026Q00907012-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
08/15/2026Q00723198-P2Open ↗
08/15/2026Q00723198-I1Open ↗
08/13/2026Q00907017-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026Q00723198-I1Open ↗
08/13/2026Q00907014-I1Open ↗
08/13/2026Q00907012-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026Q00840239-S1Open ↗
08/13/2026Q00840239-I1Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form3
08/13/2026Q00840239-P6Open ↗
08/13/2026Q00840239-I1Open ↗
08/13/2026Q00840239-S1Open ↗
▸Other Documents18
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
08/15/2026Q00723198-P2Open ↗
08/15/2026Q00723198-I1Open ↗
08/13/2026Q00907017-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026Q00723198-I1Open ↗
08/13/2026Q00907017-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00723198-I1Open ↗