← Back
BuildNYC
Two family converted from one family
205-07 104TH AVENUE
QUEENS · Hollis · BIN 4232510
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R3AZoning
2,500 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: Pacific Winterwear · 5,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHorizontal Enlargement. Conversion to Two Family Dwelling5p · 1 filing · 20 docs
Floor 2Horizontal Enlargement. Conversion to Two Family Dwelling4p · 1 filing · 20 docs
Floor 1Horizontal Enlargement. Conversion to Two Family Dwelling4p · 1 filing · 20 docs
CellarHorizontal Enlargement. Conversion to Two Family Dwelling11p · 1 filing · 20 docs
Site & exteriorHorizontal Enlargement. Conversion to Two Family Dwelling27p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkside Realty Group1703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/10/2022$1.2M—RED DOOR REALTY GROUP LLC → PACIFIC WINTERWEAR LTD$484/sf building
09/27/2021$540K—— → —$216/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering507/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metro Design1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hayden Brown ConstructionGeneral Contractor203/21/2026
Hayden Brown ConstructionScaffold203/21/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781407/08/2022
Triangle Inspection & Tes7495207/08/2022
Building Lifecycle
All (35)Filed (5)Permit Issued (3)Signed Off (2)Violation (3)Inspection (1)Objection (4)Special Inspection (17)
11/25/2025
Violation issued (HPD, closed)
I
04/03/2023
Violation issued (ECB, closed)
Zoning
11/15/2022
Signed off — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00609668-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00609668-S1
11/05/2022
Signed off — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00609668-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00609668-S2
07/26/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
07/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/20/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
07/20/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/20/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
07/20/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
07/15/2022
Objection raised — Other
07/15/2022
Objection resolved — Addressed
07/14/2022
Objection raised — Zoning
07/14/2022
Objection resolved — Addressed
07/08/2022
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00609668-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00609668-P3
07/06/2022
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00609668-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00609668-P1
06/07/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
06/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/07/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
06/07/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
06/07/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
06/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
06/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/01/2022
Violation issued (ECB, closed)
Construction
02/15/2022
Permit issued — Plumbing
Q00609668-S1-PL
01/05/2022
Permit issued — Earth Work
Q00609668-I1-GC-CX
01/05/2022
Permit issued — Construction Fence
Q00609668-S2-FN
12/09/2021
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00609668-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00609668-S1
11/12/2021
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00609668-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00609668-S2
11/04/2021
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00609668-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00609668-I1
11/04/2021
Special inspection requirement — Final
CHRISTIAN LOZADA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing02/15/2022
DOB NOWEarth WorkPermit IssuedHayden Brown Cons01/05/2022
DOB NOWConstruction FenceSigned-offHayden Brown Cons01/05/2022
1 project · most recent 07/08/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2022Signed-offHayden Brown ConsVentilation Systems
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 project · most recent 07/08/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/08/2022Signed-offInfiniti Esc PlumbingGas, Storm, Water/Sanitary
1 project · most recent 01/25/2022
General Wiring
FiledStatusContractorScope
01/25/2022CompletePower Surge ElectricGeneral Wiring
1 project · most recent 07/08/2022
Steel Wood
FiledStatusContractorScope
07/08/2022Signed-offInfiniti Esc PlumbingSteel, Wood
1 project · most recent 07/08/2022
Fence
FiledStatusContractorScope
07/08/2022Signed-offInfiniti Esc PlumbingFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/26/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/20/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/20/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/20/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
07/20/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/20/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/20/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/20/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
07/20/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/07/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
06/07/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
06/07/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
06/07/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/07/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/07/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/07/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
11/04/2021FinalCHRISTIAN LOZADAprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00609668-I1Request digital key ↗
08/26/2026Q00609668-S1Request digital key ↗
08/26/2026Q00609668-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00609668-P1Open ↗
08/13/2026Q00609668-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00609668-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026Q00609668-S1Open ↗
08/26/2026Q00609668-S1Open ↗
08/25/2026Q00609668-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00609668-P1Open ↗
08/26/2026Q00609668-P3Open ↗
08/26/2026Q00609668-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026Q00609668-S1Open ↗
08/26/2026Q00609668-S1Open ↗
08/25/2026Q00609668-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00609668-P1Open ↗
08/13/2026Q00609668-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00609668-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00609668-I1Open ↗
08/26/2026Q00609668-S1Open ↗
08/14/2026Q00609668-P3Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00609668-S1Open ↗
08/13/2026Q00609668-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00609668-I1Open ↗
08/13/2026Q00609668-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00609668-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00609668-I1Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification3
08/26/2026Q00609668-I1Open ↗
08/14/2026Q00609668-P3Open ↗
08/14/2026Q00609668-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00609668-I1Open ↗
08/13/2026Q00609668-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00609668-I1Open ↗
08/13/2026Q00609668-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00609668-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00609668-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00609668-I1Open ↗