← Back
Two stories - detached, small or mid-size
205-16 50 AVENUE
QUEENS · Bayside · BIN 4158631
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3-1Zoning
1,790 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,900 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC204/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272204/21/2025
Building Lifecycle
All (13)Filed (2)Permit Issued (1)Special Inspection (10)
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/22/2025
Special inspection requirement — Final
Walid Abdulla
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/22/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/21/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01192753-P1
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/18/2025
Special inspection requirement — Final
Walid Abdulla
04/18/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/20/2025
Permit issued — Solar
Q01192753-I1-SL
03/13/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01192753-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/20/2025
1 project · most recent 03/13/2025
FiledStatusContractorScope
03/13/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/21/2025
FiledStatusContractorScope
04/21/2025Signed-offSUNRUN INSTALLATION SVC12 panels, 4.92 kw, 253.63 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/22/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/22/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/22/2025FinalWalid Abdullaprogress
04/22/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/22/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
04/18/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/18/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/18/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/18/2025FinalWalid Abdullaprogress
04/18/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01192753-I1Request digital key ↗
08/20/2026Q01192753-P1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/26/2026Q01192753-I1Open ↗
09/26/2026Q01192753-I1Open ↗
09/26/2026Q01192753-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/26/2026Q01192753-I1Open ↗
09/26/2026Q01192753-I1Open ↗
08/28/2026Q01192753-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01192753-I1Open ↗
08/20/2026Q01192753-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01192753-P1Open ↗
08/20/2026Q01192753-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01192753-I1Open ↗