← Back
Office with commercial, 1-6 stories
205-16 LINDEN BOULEVARD
QUEENS · BIN 4272243
💬 Discuss this project
1966Year Built
2Stories
O5Building Class
R5BZoning
9,358 sfGross Floor Area
16Units
Rent Stabilized35 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: MALUL & CO COMPLEX LLC · 13,720 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof2p · 1 filing · 6 docs
Floor 29p · 4 filings · 20 docs
Floor 111p · 6 filings · 20 docs
Cellar9p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5 BORO REAL ESTATE807/08/2026
1624 E 12TH ST2707/08/2026
20516 LLC503/22/2026
MALUL & CO LLC203/22/2026
J J DESIGNS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2023$2.8M—— → —$297/sf building
10/03/2018$2.1M—— → —$224/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI602/14/2025
BANGASH ASSOCIATES INC.310/29/2024
SERDAR CEYLAN ARCHITECT, PC1008/28/2024
LMW ENGINEERING GROUP LLC102/02/2022
ALL CITY ENGINEERING PC211/04/2021
M.S. SAVANI ARCHITECT, PC206/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
92 DESIGN603/21/2026
ARCASTLE603/21/2026
M S SAVANI ARCHITECT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor507/08/2026
KALE CONSTRUCTION INCGeneral Contractor407/08/2026
A I N CONTRACTING CORPGeneral Contractor303/21/2026
PETER MICELI PLUMBINGPlumbing107/08/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
JP & SON ELECTRIC CORPElectrical103/22/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
KJK ELECTRIC INCElectrical103/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394202/14/2025
BANGASH ASSOCIATES INC8488110/29/2024
TRIANGLE INSPECTION & TES7495908/28/2024
Building Lifecycle
All (166)Filed (24)Permit Issued (10)Signed Off (4)Violation (60)Inspection (14)Objection (24)Special Inspection (30)
03/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2025
Violation issued (HPD, closed)
C
12/09/2025
Violation issued (HPD, open)
C
05/07/2025
Signed off — Alteration
INSTALL AN NEW ILLUMINATED SIGN READ "CENTURY NAIL SPA" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
Q01162668-I1
05/05/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
04/30/2025
Permit issued — Sign
Q01162668-I1-SG
04/10/2025
Signed off — Alteration
RENOVATION OF EXISTING FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01133909-I1
03/22/2025
Violation issued (HPD, open)
A
03/22/2025
Violation issued (HPD, open)
C
03/22/2025
Violation issued (HPD, open)
A
03/22/2025
Violation issued (HPD, open)
A
03/22/2025
Violation issued (HPD, open)
A
03/10/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01133912-I1
02/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
02/25/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
02/25/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
02/14/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01133912-P1
02/14/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
02/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
02/14/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
02/14/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
02/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/27/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/06/2025
Filed — Alteration
INSTALL AN NEW ILLUMINATED SIGN READ "CENTURY NAIL SPA" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
Q01162668-I1
01/02/2025
Permit issued — General Construction
Q01133912-I1-MS
01/01/2025
Permit issued — General Construction
Q01133912-I1-GC
12/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/03/2024
Permit issued — Mechanical Systems
Q01133778-I1-MS
12/03/2024
Violation issued (HPD, closed)
I
12/01/2024
Violation issued (ECB, open)
Unknown
11/29/2024
Violation issued (HPD, open)
C
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
B
11/21/2024
Violation issued (HPD, closed)
C
11/21/2024
Violation issued (HPD, open)
A
11/19/2024
Permit issued — Plumbing
Q01133909-I1-PL
11/19/2024
Violation issued (HPD, open)
A
11/19/2024
Violation issued (HPD, closed)
C
11/19/2024
Violation issued (HPD, closed)
C
11/19/2024
Violation issued (HPD, closed)
C
11/19/2024
Violation issued (HPD, open)
A
11/19/2024
Violation issued (HPD, open)
A
11/19/2024
Violation issued (HPD, open)
C
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC04/30/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC01/02/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC01/01/2025
DOB NOWMechanical SystemsPermit IssuedA I N CONTRACTING CORP12/03/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG11/19/2024
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING09/27/2023
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP09/21/2023
DOB NOWGeneral ConstructionSigned-offJ&J DESIGNS INC09/19/2023
DOB NOWMechanical SystemsPermit IssuedJ&J DESIGNS INC09/13/2023
DOB NOWConstruction FencePermit IssuedJ&J DESIGNS INC08/11/2023
5 projects · most recent 10/29/2024
Ventilation Systems Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/29/2024Permit IssuedA I N CONTRACTING CORPVentilation Systems
Ventilation
Captiveaire MADE BY: DAYTON MODEL NO: 56JN93 4,216 CFM · Exhaust Fan ×1
10/17/2024——Ventilation Systems
Ventilation
__Junk__ SONOMA 200 CFM ×8
10/08/2024——Ventilation Systems
Ventilation
Captiveaire MADE BY: DAYTON MODEL NO: 56JN93 4,216 CFM · Exhaust Fan ×1
08/28/2024Permit IssuedJ&J DESIGNS INCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu 11 ASUH09LPAS, 3 AOU36RLXFZ, 6-ARU24RGLX, 6 AOU24RGLX, 1 ARU36RGLX, 1 AOU36RGLX, 10 GSXN3N2410, 10 GM9S800403AN 17 tons · Condensing Unit ×51
11/04/2021——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PUMY-HP48NKMU1 48,000 BTU · Vrf Outdoor ×3
PUMY-P48NKMU1 48,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric PUMY-HP48NKMU1 54,000 BTU · Vrf Outdoor ×4
2 projects · most recent 10/17/2024
Water/Sanitary Gas
FiledStatusContractorScope
10/17/2024——Water/Sanitary
10/08/2024——Gas, Water/Sanitary
6 projects · most recent 01/22/2025
General Wiring
FiledStatusContractorScope
01/22/2025CompleteKJK ELECTRIC INC—
12/12/2024CompleteJP & SON ELECTRIC CORPGeneral Wiring
11/26/2024CompleteKJK ELECTRIC INCGeneral Wiring
04/18/2024CompleteJP & SON ELECTRIC CORP—
07/27/2023CancelledJP & SON ELECTRIC CORPGeneral Wiring
03/03/2019CompleteTHROOP ELECTRIC CO., INC.—
1 project · most recent 06/21/2021
Fence
FiledStatusContractorScope
06/21/2021Permit IssuedJ&J DESIGNS INCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2025Pass-Final Sign Permit InspectionPassView ↗
02/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/27/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/18/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
02/25/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
02/25/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
02/25/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
02/25/2025FinalFARHAD BASSIRI-TEHRANIprogress
02/25/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
02/14/2025FinalFARHAD BASSIRI-TEHRANIprogress
02/14/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
02/14/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
02/14/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
02/14/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/28/2024FinalFAZAL BANGASHprogress
10/28/2024Mechanical SystemsFAZAL BANGASHspecial
10/17/2024Energy Code Compliance Inspections—progress
10/17/2024Fire-Resistance Rated Construction—progress
10/17/2024Fire-Resistant Penetrations and Joints—special
09/19/2024Mechanical Systems—special
09/19/2024Final—progress
08/26/2024Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
08/26/2024HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
08/26/2024HVAC-R and service water heating system controlsSERDAR CEYLANenergy_progress
08/26/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
08/26/2024Mechanical SystemsRajasekhar Sakhamurispecial
08/26/2024Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
08/26/2024Energy Code Compliance InspectionsSERDAR CEYLANprogress
08/26/2024FinalSERDAR CEYLANprogress
Latest 25 of 57.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/27/2026Q00523729-I1Request digital key ↗
08/27/2026Q00541461-I1Request digital key ↗
08/27/2026Q00614972-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications75
▸DOB NOWProgress Inspector Seal & Signature26
09/02/2026Q00883447-P5Open ↗
09/02/2026Q00883447-P5Open ↗
09/02/2026Q00883447-P5Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/27/2026Q00541461-I1Open ↗
08/27/2026Q00614972-I1Open ↗
08/26/2026Q00661910-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026Q00883447-P5Open ↗
09/02/2026Q00883447-P5Open ↗
09/02/2026Q00883447-P5Open ↗
Showing 3 of 24 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00883447-P1Open ↗
08/13/2026Q00883447-P4Open ↗
08/13/2026Q00883447-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026Q00541461-I1Open ↗
08/27/2026Q00614972-I1Open ↗
08/26/2026Q00661910-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice to Proceed11
08/13/2026Q00661910-I1Open ↗
08/13/2026Q00883447-I1Open ↗
08/13/2026Q01133909-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026Q00886588-I1Open ↗
08/13/2026Q01133909-I1Open ↗
08/13/2026Q01133912-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00541461-I1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification5
08/21/2026Q00883447-P4Open ↗
08/21/2026Q00883447-P1Open ↗
08/21/2026Q00883447-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)3
08/13/2026Q01114211-I1Open ↗
08/13/2026Q01114210-I1Open ↗
08/13/2026Q01099416-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00883447-I1Open ↗