← Back
Two family converted from one family
205-28 116 ROAD
QUEENS · BIN 4238679
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R3AZoning
1,568 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: ROLI GROUP LLC · 2,600 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 21 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2025$510K—THE RMAC TRUST, SERIES 2016-CTT → ROLI GROUP LLC$325/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN408/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
718 DESIGN PRO INCGeneral Contractor204/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404408/13/2026
Building Lifecycle
All (57)Filed (4)Permit Issued (3)Signed Off (1)Violation (3)Inspection (8)Objection (8)Special Inspection (30)
08/13/2026
Filed — Alteration CO
Existing two 2.5 stories one family dwelling unit frame building to be completely renovated and converted into a two family dwelling units. New drywell partitions and plumbing fixtures as per plans.
Q01307010-P2
08/10/2026
Special inspection requirement — Interior lighting power
AKM RAHMAN
08/10/2026
Special inspection requirement — Permanent certificate
AKM RAHMAN
08/10/2026
Special inspection requirement — Fenestration areas
AKM RAHMAN
08/10/2026
Special inspection requirement — Metering
AKM RAHMAN
08/10/2026
Special inspection requirement — Insulation placement and R values
AKM RAHMAN
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
AKM RAHMAN
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
08/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AKM RAHMAN
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
08/10/2026
Special inspection requirement — Final
AKM RAHMAN
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
AKM RAHMAN
08/10/2026
Special inspection requirement — Air barrier - visual inspection
AKM RAHMAN
08/10/2026
Special inspection requirement — Maintenance information
AKM RAHMAN
08/10/2026
Special inspection requirement — Fenestration air leakage
AKM RAHMAN
07/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2026
Special inspection requirement — Fenestration areas
AKM RAHMAN
06/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AKM RAHMAN
06/27/2026
Special inspection requirement — Final
AKM RAHMAN
06/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
AKM RAHMAN
06/27/2026
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
06/27/2026
Special inspection requirement — Air barrier - visual inspection
AKM RAHMAN
06/27/2026
Special inspection requirement — Maintenance information
AKM RAHMAN
06/27/2026
Special inspection requirement — Metering
AKM RAHMAN
06/27/2026
Special inspection requirement — Insulation placement and R values
AKM RAHMAN
06/27/2026
Special inspection requirement — Interior lighting power
AKM RAHMAN
06/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
AKM RAHMAN
06/27/2026
Special inspection requirement — Fenestration air leakage
AKM RAHMAN
06/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
06/27/2026
Special inspection requirement — Permanent certificate
AKM RAHMAN
06/11/2026
Signed off — Alteration CO
Existing two 2.5 stories one family dwelling unit frame building to be completely renovated and converted into a two family dwelling units. New drywell partitions and plumbing fixtures as per plans.
Q01307010-S1
06/11/2026
Filed — Alteration CO
Existing two 2.5 stories one family dwelling unit frame building to be completely renovated and converted into a two family dwelling units. New drywell partitions and plumbing fixtures as per plans.
Q01307010-P1
06/10/2026
Special inspection requirement — Insulation placement and R values
AKM RAHMAN
06/10/2026
Special inspection requirement — Fenestration air leakage
AKM RAHMAN
03/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/20/2026
Permit issued — Plumbing
Q01307010-S1-PL
02/16/2026
Filed — Alteration CO
Existing two 2.5 stories one family dwelling unit frame building to be completely renovated and converted into a two family dwelling units. New drywell partitions and plumbing fixtures as per plans.
Q01307010-S1
12/26/2025
Permit issued — Structural
Q01307010-I1-ST
12/26/2025
Permit issued — Structural
Q01307010-I1-GC
12/15/2025
Objection resolved — Addressed
12/03/2025
Objection raised — Energy
12/03/2025
Objection resolved — Addressed
11/27/2025
Objection resolved — Addressed
11/27/2025
Objection resolved — Addressed
11/18/2025
Objection raised — Scope
11/18/2025
Objection raised — Zoning
11/18/2025
Objection raised — Zoning
11/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Filed — Alteration CO
Existing two 2.5 stories one family dwelling unit frame building to be completely renovated and converted into a two family dwelling units. New drywell partitions and plumbing fixtures as per plans.
Q01307010-I1
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/09/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/08/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS02/20/2026
DOB NOWStructuralSigned-off718 DESIGN PRO INC12/26/2025
DOB NOWStructuralPermit Issued718 DESIGN PRO INC12/26/2025
1 project · most recent 02/09/2026
General Wiring
FiledStatusContractorScope
02/09/2026CompleteK.A.B. ELECTRIC CORPGeneral Wiring
1 project · most recent 08/13/2026
Wood
FiledStatusContractorScope
08/13/2026Signed-offDYNAMIC PLBG & SPRKLR CORWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
08/10/2026Interior lighting powerAKM RAHMANenergy_progress
08/10/2026Permanent certificateAKM RAHMANenergy_progress
08/10/2026Fenestration areasAKM RAHMANenergy_progress
08/10/2026MeteringAKM RAHMANenergy_progress
08/10/2026Insulation placement and R valuesAKM RAHMANenergy_progress
08/10/2026Fenestration and door U-factor and product ratingsAKM RAHMANenergy_progress
08/10/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
08/10/2026Structural Stability – Alterations of existing buildingsAKM RAHMANspecial
08/10/2026Energy Code Compliance InspectionsAKM RAHMANprogress
08/10/2026FinalAKM RAHMANprogress
08/10/2026Fire-Resistance Rated ConstructionAKM RAHMANprogress
08/10/2026Air barrier - visual inspectionAKM RAHMANenergy_progress
08/10/2026Maintenance informationAKM RAHMANenergy_progress
08/10/2026Fenestration air leakageAKM RAHMANenergy_progress
06/27/2026Fenestration areasAKM RAHMANenergy_progress
06/27/2026Structural Stability – Alterations of existing buildingsAKM RAHMANspecial
06/27/2026FinalAKM RAHMANprogress
06/27/2026Fire-Resistance Rated ConstructionAKM RAHMANprogress
06/27/2026Energy Code Compliance InspectionsAKM RAHMANprogress
06/27/2026Air barrier - visual inspectionAKM RAHMANenergy_progress
06/27/2026Maintenance informationAKM RAHMANenergy_progress
06/27/2026MeteringAKM RAHMANenergy_progress
06/27/2026Insulation placement and R valuesAKM RAHMANenergy_progress
06/27/2026Interior lighting powerAKM RAHMANenergy_progress
06/27/2026Fenestration and door U-factor and product ratingsAKM RAHMANenergy_progress
Latest 25 of 48.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01307010-P1Request digital key ↗
08/17/2026Q01307010-P2Request digital key ↗
08/17/2026Q01307010-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01307010-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature41
09/02/2026Q01307010-P2Open ↗
09/02/2026Q01307010-P2Open ↗
09/02/2026Q01307010-P2Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q01307010-P2Open ↗
09/02/2026Q01307010-P2Open ↗
08/29/2026Q01307010-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01307010-P1Open ↗
08/17/2026Q01307010-P2Open ↗
08/13/2026Q01307010-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026Q01307010-P1Open ↗
08/17/2026Q01307010-P2Open ↗
08/13/2026Q01307010-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01307010-P2Open ↗
08/17/2026Q01307010-P1Open ↗
08/13/2026Q01307010-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/17/2026Q01307010-P1Open ↗
08/17/2026Q01307010-P2Open ↗
08/13/2026Q01307010-I1Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q01307010-I1Open ↗