Large suburban residence
205 CITY BOULEVARD
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5007312
💬 Discuss this project
1955Year Built
2Stories
A3Building Class
R2Zoning
3,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 5,510 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof1p · 1 filing · 8 docs
Basement1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/22/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
12/19/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01305715-I1
10/30/2025
Permit issued — Solar
S01305715-I1-SL
10/22/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01305715-I1
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/20/2025
Special inspection requirement — Final
Walid Abdulla
10/20/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/12/1991
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/30/2025
1 project · most recent 10/22/2025
FiledStatusContractorScope
10/22/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/20/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/20/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/20/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/20/2025FinalWalid Abdullaprogress
10/20/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026S01305715-I1Open ↗
09/02/2026S01305715-I1Open ↗
09/02/2026S01305715-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S01305715-I1Open ↗
09/02/2026S01305715-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01305715-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01305715-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01305715-I1Open ↗