205 EAST 67 STREET
💬 Discuss this project
1950Year Built
7Stories
O3Building Class
R8BZoning
149,484 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Office only, 7-19 stories · 22,650 sf lot · 6.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Penthouse2p · 1 filing · 4 docs
Floor 717p · 6 filings · 20 docs
Floor 6
Floor 511p · 4 filings · 19 docs
Floor 4
Floor 311p · 4 filings · 19 docs
Floor 2
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WNYW FOX 5103/22/2026
MH RESIDENTIAL 1203/21/2026
FOX 5 TV103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGNTECH, INC.408/22/2025
ENV ARCHITECTS, DPC108/19/2025
WAVIC ENGINEERING PLLC105/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS603/21/2026
RIZZO GROUP203/21/2026
CLARKE CONSTRUCTION CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN GALLIN & SON, INCGeneral Contractor407/08/2026
BLUEWATER PLBG& HTG INCPlumbing407/08/2026
ADAM SCHEFFLERElectrical103/21/2026
ASHLAR MECHANICAL CORPFire Protection107/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN D MARCUS, PE1761208/22/2025
WAVIC ENGINEERING PLLC1733105/07/2021
ALAN MARGOLIN & ASSOC423105/11/2020
Building Lifecycle
All (29)Filed (6)Permit Issued (7)Signed Off (2)Violation (3)Inspection (4)Objection (2)Special Inspection (5)
04/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2025
Permit issued — Plumbing
M01254002-I1-PL
09/08/2025
Permit issued — Mechanical Systems
M01253999-I1-MS
09/08/2025
Permit issued — General Construction
M01253995-I1-GC
09/05/2025
Objection raised — Admin
09/05/2025
Objection resolved — Addressed
08/22/2025
Filed — Alteration
M01253999-I1
08/22/2025
Filed — Alteration
Plumbing changes on the 3rd, 5th & 7th floors as indicated on drawings.
M01254002-I1
08/19/2025
Filed — Alteration
Demolition and architectural changes on the 3rd, 5th and 7th floors as indicated on drawings.
M01253995-I1
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Marcus
07/10/2025
Special inspection requirement — Mechanical Systems
Alan Marcus
07/10/2025
Special inspection requirement — Final
Alan Marcus
07/10/2025
Special inspection requirement — Final
Alan Marcus
02/12/2025
Signed off — Alteration
Modifications to the existing HVAC system; Installation of new ac units and ductwork on the 1st, 3rd, 5th & 7th Floors as per plans (Fox TV Renovations.) No change to use, egress or occupancy.
M00341144-I1
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2024
Violation issued (ECB, closed)
Construction
11/30/2021
Signed off — Alteration
M00341164-I1
11/24/2021
Permit issued — Mechanical Systems
M00341144-I1-MS
05/10/2021
Permit issued — Sprinklers
M00448283-I1-EW-SP
05/07/2021
Filed — Alteration
RELOCATION OF SP HEADS ON 1ST,3RD,5TH AND 7TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00448283-I1
01/06/2021
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
06/17/2020
Permit issued — Plumbing
M00341164-I1-PL
06/10/2020
Permit issued — Mechanical Systems
M00341144-I1-MS
05/11/2020
Filed — Alteration
Modifications to the existing HVAC system; Installation of new ac units and ductwork on the 1st, 3rd, 5th & 7th Floors as per plans (Fox TV Renovations.) No change to use, egress or occupancy.
M00341144-I1
05/11/2020
Filed — Alteration
M00341164-I1
05/07/2003
Violation issued (ECB, closed)
Elevators
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBLUEWATER PLBG& HTG INC09/23/2025
DOB NOWMechanical SystemsPermit IssuedJOHN GALLIN SON09/08/2025
DOB NOWGeneral ConstructionPermit IssuedJOHN GALLIN SON09/08/2025
DOB NOWMechanical SystemsSigned-offJOHN GALLIN SON11/24/2021
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP05/10/2021
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC06/17/2020
DOB NOWMechanical SystemsSigned-offJOHN GALLIN SON06/10/2020
BISOTISSUEDJOHN GALLIN & SON, INC11/04/2020
BISOTISSUEDJOHN GALLIN & SON, INC06/10/2020
BISOTISSUEDFINALY GENL CONTR CORP03/03/2016
BISSPISSUEDENOBRAC PLUMBING, INC03/02/2016
BISPLISSUEDENOBRAC PLUMBING, INC03/02/2016
BISMHISSUEDFINALY GENL CONTR CORP02/23/2016
BISOTISSUEDFINALY GENL CONTR CORP02/23/2016
BISSPISSUEDASHLAR MECHANICAL CORP01/17/2013
BISOTISSUEDW5 GROUP LLC09/14/2012
BISSPISSUEDUNITED FIRE PROT CORP06/16/2008
BISMHISSUEDP& L MECH. CO.10/13/1995
BISOTISSUEDP& L MECH. CO.10/13/1995
1 project · most recent 05/07/2021
FiledStatusContractorScope
05/07/2021Signed-offASHLAR MECHANICAL CORP122 heads
1 project · most recent 08/22/2025
Water/Sanitary
FiledStatusContractorScope
08/22/2025Permit IssuedBLUEWATER PLBG& HTG INCWater/Sanitary
2 projects · most recent 09/25/2025
General Wiring
FiledStatusContractorScope
09/25/2025Permit IssuedPREMIER ELECTRIC, INCGeneral Wiring
02/25/2021CompleteP.E. STONE INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/14/2025Fire-Resistant Penetrations and JointsAlan Marcusspecial
07/10/2025Mechanical SystemsAlan Marcusspecial
07/10/2025FinalAlan Marcusprogress
07/10/2025FinalAlan Marcusprogress
01/06/2021Sprinkler SystemsDARIUSZ LUCZAKspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fox TV StudiosOfficeFloors 1, 3, 5, 7, Penthouse
Project M00341144 Alteration · LOC Issued · 05/11/2020
Project M00341164 Alteration · LOC Issued · 05/11/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
08/21/2026M01253995-I1Request digital key ↗
08/21/2026M01253999-I1Request digital key ↗
08/21/2026M01254002-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/03/2026M00448283-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00341164-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00341144-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION11
05/13/2020123922176Open ↗
05/25/2016122692568Open ↗
05/25/2016122692568Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION9
06/10/2020123922176Open ↗
03/14/2016122692568Open ↗
03/14/2016122692559Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications48
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
05/13/2020123922176Open ↗
05/13/2020123922176Open ↗
07/29/2016122692568Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
05/13/2020123922176Open ↗
02/26/2016122692568Open ↗
02/25/2016122692559Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
01/22/2013121498236Open ↗
09/17/2012121369438Open ↗
10/20/2008110357756Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/04/2026M00341164-I1Open ↗
08/21/2026M01253995-I1Open ↗
08/21/2026M01253999-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/13/2020123922176Open ↗
02/26/2016122692568Open ↗
02/26/2016122692568Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M00448283-I1Open ↗
08/25/2026M01253999-I1Open ↗
08/24/2026M01253995-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M01253999-I1Open ↗
08/24/2026M01253995-I1Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE4
04/11/2013121498236Open ↗
04/11/2013121498236Open ↗
05/28/2009110184951Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
12/09/2008110357756Open ↗
12/09/2008110357756Open ↗
12/09/2008110357756Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/26/2016122692568Open ↗
02/25/2016122692559Open ↗
▸BISSCHEDULE B - PLUMBING2
01/22/2013121498236Open ↗
06/13/2008110184951Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
05/28/2009110184951Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/09/2008110357756Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/04/2026M00341164-I1Open ↗
08/21/2026M01253995-I1Open ↗
08/21/2026M01253999-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/13/2020123922176Open ↗
02/26/2016122689901Open ↗
02/26/2016122692568Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/20/2008110357756Open ↗
06/13/2008110184951Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/22/2013121498236Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
05/13/2020123922176Open ↗
05/13/2020123922176Open ↗
07/29/2016122692568Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/29/2016122692568Open ↗
07/22/2016122692568Open ↗
▸BISINTERIOR LIGHTING POWER1
02/25/2022123922176Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/25/2022123922176Open ↗
▸BISLIGHTING CONTROLS1
02/25/2022123922176Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/25/2022123922176Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00341144-I1Open ↗
▸Inspections & Test Reports1
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/25/2022123922176Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/28/2022123922176Open ↗
10/06/2016122692559Open ↗
07/29/2016122692568Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
01/22/2013121498236Open ↗
09/17/2012121369438Open ↗
10/20/2008110357756Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
02/25/2022123922176Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
05/13/2020123922176Open ↗
10/06/2016122692559Open ↗
07/29/2016122692568Open ↗
Showing 3 of 15 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/25/2022123922176Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET8
05/13/2020123922176Open ↗
02/26/2016122689901Open ↗
02/26/2016122692568Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION2
05/25/2016122692568Open ↗
05/25/2016122692568Open ↗
▸BISeFiling Job Application Cover Sheet1
10/20/2008110357756Open ↗