← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Lenox Court Condominium
205 EAST 76TH STREET · BIN 1044094
💬 Discuss this project
1986Year Built
6Stories
RMBuilding Class
C1-9Zoning
14,968 sfGross Floor Area
9Units
Rent Stabilized0 Active ViolationsFISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 2,851 sf lot · 5.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNorthwell HealthUnder Construction13p · 4 filings · 20 docs
Site & exteriorNorthwell Health10p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lenox Court Condominium1310/20/2026
Lend Lease US Construction LMB407/08/2026
76 Street Place403/21/2026
Eastside Realty Holdings307/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service203/21/2026
Upright Expediters203/21/2026
Patuxent Engineering203/21/2026
Jack Jaffa & Associates103/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold603/21/2026
Rock Group NYScaffold407/08/2026
Arsenal ScaffoldScaffold203/21/2026
Lendlease (US) ConstructionGeneral Contractor203/21/2026
Urban IntelligenceScaffold107/08/2026
Jansons AssoicatesGeneral Contractor110/20/2026
Rush Hour Construction CoGeneral Contractor107/08/2026
A'S Electric ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312109/03/2024
Future Tech Consultants O589102/12/2024
Robert F. Germain Jr. PE5100109/14/2023
Building Lifecycle
All (86)Filed (6)Permit Issued (9)Signed Off (5)Facade (FISP) (15)Violation (29)Objection (4)Special Inspection (18)
10/19/2026
Permit issued — General Construction
M00925239-I1-GC
05/13/2025
Signed off — Alteration
INSTALLATION OF OVERHEAD PROTECTION ON ROOFTOP AND BACK TERRACE IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01003432-I1
10/11/2024
Signed off — Alteration
Lot Line Window Infill work, including insulation and interior finishing trim at Westerly lot line adjacent to 3rd Ave corner Lot # 46. No Change in Use Egress or Occupancy under this application, see comment for more.
M00994724-I1
09/12/2024
Signed off — Alteration
REPLACE EXISTING HVAC CONDENSER AT ROOF TO RESOLVE VIOLATION, AS PER PLANS FILED HEREWITH
M01091853-I1
09/09/2024
Permit issued — Mechanical Systems
M01091853-I1-MS
09/03/2024
Filed — Alteration
REPLACE EXISTING HVAC CONDENSER AT ROOF TO RESOLVE VIOLATION, AS PER PLANS FILED HEREWITH
M01091853-I1
09/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
09/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jeff Akerman
09/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jeff Akerman
09/03/2024
Special inspection requirement — Maintenance information
Jeff Akerman
09/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeff Akerman
09/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
08/06/2024
Special inspection requirement — Mechanical Systems
Jeff Akerman
08/06/2024
Special inspection requirement — Final
SHIMON GREENEBAUM
05/30/2024
Permit issued — General Construction
M00994724-I1-GC
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
03/22/2024
Special inspection requirement — Air barrier - visual inspection
Stephen Marchese
03/22/2024
Special inspection requirement — Insulation placement and R values
Stephen Marchese
02/23/2024
Objection raised — Energy
02/23/2024
Objection resolved — Addressed
02/23/2024
Objection raised — Other
02/23/2024
Objection resolved — Addressed
02/12/2024
Filed — Alteration
INSTALLATION OF OVERHEAD PROTECTION ON ROOFTOP AND BACK TERRACE IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01003432-I1
02/12/2024
Filed — Alteration
Lot Line Window Infill work, including insulation and interior finishing trim at Westerly lot line adjacent to 3rd Ave corner Lot # 46. No Change in Use Egress or Occupancy under this application, see comment for more.
M00994724-I1
02/12/2024
Permit issued — Protection and Mechanical Methods
M01003432-I1-PMM
01/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Marchese
01/23/2024
Special inspection requirement — Final
VINCENT ORTIZ
01/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Marchese
09/14/2023
Filed — Alteration
RELOCATE/EXTEND BOILER DOUBLEWALL FLUE. RELOCATE/EXTEND 3 FIREPLACE FLUES. BOTH IN CONJUNCTION WITH NB M08013299. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00925239-I1
08/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
08/25/2023
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
08/25/2023
Special inspection requirement — Final
Robert Germain Jr.
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/21/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00133888-I1
03/02/2023
Signed off — Alteration
M00795122-I1
10/05/2022
Cycle 9 facade report signed — SAFE
09/15/2022
Permit issued — Protection and Mechanical Methods
M00795122-I1-PM
09/14/2022
Filed — Alteration
M00795122-I1
07/13/2022
Cycle 9 facade report submitted
06/14/2022
Cycle 8 facade report submitted
06/02/2022
Cycle 8 facade report signed — SAFE
05/19/2022
Cycle 9 facade inspection completed
05/19/2022
Cycle 8 facade inspection completed
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
10/08/2021
Permit issued — Sidewalk Shed
M00133888-I1-SH
09/29/2020
Permit issued — Sidewalk Shed
M00133888-I1-SH
08/20/2020
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/10/2019
Permit issued — Sidewalk Shed
M00133888-I1-SH
03/19/2019
Permit issued — Sidewalk Shed
M00133888-I1-SH
03/18/2019
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00133888-I1
02/15/2019
Cycle 8 facade report submitted
02/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2019
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/05/2019
Cycle 8 facade report signed — UNSAFE
02/04/2019
Cycle 8 facade inspection completed
10/09/2018
Violation issued (HPD, closed)
I
09/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2016
Violation issued (HPD, closed)
I
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJansons Assoicates10/19/2026
DOB NOWMechanical SystemsSigned-offRush Hour Construction Co09/09/2024
DOB NOWGeneral ConstructionSigned-offLendlease (US) Construction05/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offUrban Intelligence02/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold09/15/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/08/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/29/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/10/2019
DOB NOWSidewalk ShedSigned-offRock Group NY03/19/2019
BISOTISSUEDAdelphi Restoration06/30/2022
BISOTISSUEDAdelphi Restoration06/23/2021
BISOTISSUEDAdelphi Restoration04/02/2021
BISBLISSUEDWard Plumbing05/05/2011
BISOTISSUEDSteelstone Construction I04/21/2010
BISPLISSUEDAAA Total Plumbing04/19/2010
BISEQISSUEDRock Scaffolding10/29/2009
BISOTISSUEDSteelstone Construction I09/02/2009
BISPLISSUEDAccurate Mechanical08/24/2007
BISMHISSUEDSun Construction & Company08/10/2007
BISPLISSUEDAccurate Mechanical04/11/2007
BISEQISSUEDPerimeter Bridgescaffold04/02/2007
BISOTISSUEDSun Construction & Company03/14/2007
BISEQISSUEDPerimeter Bridgescaffold11/08/2006
BISPLISSUEDMJM Plumbing03/20/2003
BISOTISSUEDSynergy Construction03/10/2003
BISMHISSUEDSynergy Construction03/10/2003
BISPLISSUEDJulian Plumbing & Heating01/14/1998
BISOTISSUEDXolle Demo12/12/1997
BISSPISSUEDJulian Plumbing & Heating10/17/1995
4 projects · most recent 11/05/2024
FiledStatusContractorScope
11/05/2024Permit IssuedA'S Electric Contracting—
02/11/2021Permit IssuedE-J Electric Installation Co—
02/21/2019CompleteTop Shelf Electric—
12/26/2018CompleteVoltage Electric—
1 project · most recent 03/18/2019
Sidewalk Shed
FiledStatusContractorScope
03/18/2019Signed-offPlatinum Services NYSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/03/2024Tenant Protection Plan ComplianceJeff Akermanspecial
09/03/2024HVAC-R and service water heating equipmentJeff Akermanenergy_progress
09/03/2024HVAC-R and service water heating system controlsJeff Akermanenergy_progress
09/03/2024Maintenance informationJeff Akermanenergy_progress
09/03/2024HVAC-R and service water piping design and insulationJeff Akermanenergy_progress
09/03/2024Energy Code Compliance InspectionsJeff Akermanprogress
08/06/2024Mechanical SystemsJeff Akermanspecial
08/06/2024FinalSHIMON GREENEBAUMprogress
04/05/2024Fire-Resistant Penetrations and JointsStephen Marchesespecial
03/22/2024Air barrier - visual inspectionStephen Marcheseenergy_progress
03/22/2024Insulation placement and R valuesStephen Marcheseenergy_progress
01/23/2024Tenant Protection Plan ComplianceStephen Marchesespecial
01/23/2024FinalVINCENT ORTIZprogress
01/23/2024Fire-Resistance Rated ConstructionStephen Marcheseprogress
08/30/2023Tenant Protection Plan ComplianceRobert Germain Jr.special
08/25/2023Chimneys and ventsRobert Germain Jr.special
08/25/2023FinalRobert Germain Jr.progress
08/25/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Northwell HealthMedical / Healthcare—
Project M00994724 Alteration · LOC Issued · 02/12/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/01/2026M00795122-I1Request digital key ↗
08/29/2026M00925239-I1Request digital key ↗
08/28/2026M01003432-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00133888-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION15
07/01/2022140932882Open ↗
02/24/2022104671945Open ↗
02/23/2022104671945Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
04/02/2021140932882Open ↗
05/09/2011120666859Open ↗
05/09/2011120666859Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications39
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
05/02/2011120666859Open ↗
06/11/2010120377653Open ↗
10/29/2009120187261Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/16/2011120146074Open ↗
05/09/2011120377653Open ↗
05/02/2011120666859Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00925239-I1Open ↗
08/31/2026M01091853-I1Open ↗
08/31/2026M01091853-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026M00925239-I1Open ↗
08/28/2026M00994724-I1Open ↗
08/13/2026M00795122-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00925239-I1Open ↗
09/01/2026M00925239-I1Open ↗
09/01/2026M00925239-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/02/2011120666859Open ↗
06/11/2010120377653Open ↗
10/29/2009120187261Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/28/2020140932882Open ↗
▸Trade Schedules & Equipment10
▸BISSELF-CERT PLUMBING NOTICE4
06/14/2011120666859Open ↗
05/20/2011120377653Open ↗
05/17/2011120377653Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
05/02/2011120666859Open ↗
08/03/2010120146074Open ↗
06/11/2010120377653Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
05/23/2011120377653Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/02/2011120666859Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/28/2020140932882Open ↗
▸Environmental & Asbestos9
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
05/02/2011120666859Open ↗
05/02/2011120666859Open ↗
06/11/2010120377653Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/11/2022104671945Open ↗
09/28/2020140932882Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/29/2009120187261Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026M00994724-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY3
05/09/2011120666859Open ↗
05/02/2011120666859Open ↗
05/02/2011120666859Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/09/2022140932882Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/28/2020140932882Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/09/2011120666859Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/09/2022140932882Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/12/2022140932882Open ↗
03/16/2022104671945Open ↗
03/16/2022104671945Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/13/2022140932882Open ↗
03/21/2022104671945Open ↗
03/11/2022104671945Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/02/2011120666859Open ↗
06/11/2010120377653Open ↗
10/29/2009120187261Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
03/09/2022104671945Open ↗
02/11/2022104671945Open ↗
09/28/2020140932882Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/09/2022140932882Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
09/03/2009120146074Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION4
09/08/2022140932882Open ↗
03/09/2021140932882Open ↗
09/26/2013120189759Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
05/02/2011120666859Open ↗
10/29/2009120187261Open ↗
10/26/2009120189759Open ↗
▸BISeFiling Job Application Cover Sheet3
06/11/2010120377653Open ↗
09/02/2009120146074Open ↗
09/28/2020140932882Open ↗
▸Other Documents1
▸BISDHCR DOCUMENT1
09/28/2020140932882Open ↗