← Back
Five to six families
205 IRVING AVENUE
BROOKLYN · BIN 3074852
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
4,875 sfGross Floor Area
6Units
Rent Stabilized7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: 205 IRVING AVENUE LLC · 2,375 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof10p · 1 filing · 20 docs
Floor 310p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1266 PARK PLACE3307/08/2026
205 IRVING AVENUE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/23/2021$1.8M—Private party → 205 IRVING AVENUE LLC$369/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MGM CREATIONS ARCHITECTURE708/03/2023
ROMAN ONATSKO, P.E.206/27/2023
KALLASSY ENGINEERING PLLC103/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAM BERGMAN CONSTRUCTION AND DEVEL1003/21/2026
A2ZCM403/21/2026
BMB BUILDING CONSULTING203/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BYBLOS INC. NYGeneral Contractor807/08/2026
H BRONNER & SON PLBG & HTGPlumbing207/08/2026
MEGA PLBG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616408/03/2023
MGM CREATIONS ARCHITECTUR7979203/23/2023
KALLASSY ENGINEERING PLLC5711103/16/2022
Building Lifecycle
All (110)Filed (10)Permit Issued (8)Signed Off (5)Violation (21)Inspection (8)Objection (28)Special Inspection (30)
11/20/2025
Violation issued (HPD, closed)
I
06/10/2025
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, closed)
A
11/28/2023
Signed off — Alteration
Installation of new sprinkler system in conjunction with general construction job #B00601277 as per plans. No change of use, egress or Occupancy.
B00704954-I1
09/19/2023
Signed off — Alteration
Subsequently file Structural modification to an existing structure in conjunction with GC # B00601277-S3.
B00601277-S2
09/06/2023
Signed off — Alteration
Subsequently file Structural modification to an existing structure in conjunction with GC # B00601277-S3.
B00601277-S1
09/01/2023
Signed off — Alteration
Subsequently file Structural modification to an existing structure in conjunction with GC # B00601277-S3.
B00601277-I1
08/31/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/11/2023
Signed off — Alteration
Subsequently file Structural modification to an existing structure in conjunction with GC # B00601277-S3.
B00601277-Z1
08/10/2023
Permit issued — Mechanical Systems
B00601277-S1-MS
08/08/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
08/08/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/08/2023
Special inspection requirement — Final
FAHAD FATEH
08/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/08/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
08/08/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
08/03/2023
Filed — Alteration
Subsequently file Structural modification to an existing structure in conjunction with GC # B00601277-S3.
B00601277-P3
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/27/2023
Filed — Alteration
Installation of new sprinkler system in conjunction with general construction job #B00601277 as per plans. No change of use, egress or Occupancy.
B00704954-P1
06/22/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
06/22/2023
Special inspection requirement — Final
FAHAD FATEH
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/22/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/22/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
06/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/22/2023
Permit issued — Sprinklers
B00704954-I1-EW-SP
05/03/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/01/2023
Special inspection requirement — Insulation placement and R values
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Energy Code Compliance Inspections
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Fenestration air leakage
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Interior lighting power
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Lighting controls
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Exterior lighting power
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Air barrier - visual inspection
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Fenestration areas
GABRIEL GINGISHVILI
05/01/2023
Special inspection requirement — Lighting in dwelling units
GABRIEL GINGISHVILI
04/27/2023
Objection resolved — Addressed
04/25/2023
Permit issued — Plumbing
B00601277-S2-PL
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/21/2023
Objection resolved — Addressed
04/20/2023
Objection raised — Fire_Protection
04/11/2023
Objection resolved — Addressed
04/11/2023
Objection resolved — Addressed
04/11/2023
Objection resolved — Addressed
04/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/11/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
03/29/2023
Objection raised — Zoning
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBYBLOS INC NY08/10/2023
DOB NOWSprinklersSigned-offREAL PLUMBING CORP05/22/2023
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT04/25/2023
DOB NOWConstruction FenceSigned-offBYBLOS INC NY11/29/2022
DOB NOWGeneral ConstructionSigned-offBYBLOS INC NY10/05/2022
DOB NOWStructuralPermit IssuedBYBLOS INC NY06/02/2022
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT04/13/2022
DOB NOWGeneral ConstructionSigned-offBYBLOS INC NY02/17/2022
1 project · most recent 08/03/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2023Signed-offBYBLOS INC. NYHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36RMVJUA 36,000 BTU · Heat Pump Outdoor ×6
3MXS24RMVJUA 24,000 BTU · Heat Pump Outdoor ×1
RXB24AXVJU 24,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 08/03/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/03/2023Signed-offH BRONNER & SON PLBG & HTGas, Water/Sanitary
2 projects · most recent 07/30/2022
General Wiring
FiledStatusContractorScope
07/30/2022CompleteLENS ELECTRIC, INC7 meters, 7 new_meters
03/09/2022CompleteLENS ELECTRIC, INCGeneral Wiring
1 project · most recent 08/03/2023
Steel Concrete Wood
FiledStatusContractorScope
08/03/2023Signed-offBYBLOS INC. NYSteel, Concrete, Wood
1 project · most recent 08/03/2023
Fence
FiledStatusContractorScope
08/03/2023Signed-offBYBLOS INC. NYFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/31/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/30/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/03/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/08/2023Mechanical SystemsFAHAD FATEHspecial
08/08/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
08/08/2023FinalFAHAD FATEHprogress
08/08/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/08/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/08/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/08/2023Shutoff dampersFAHAD FATEHenergy_progress
08/08/2023Maintenance informationFAHAD FATEHenergy_progress
06/22/2023Shutoff dampersFAHAD FATEHenergy_progress
06/22/2023FinalFAHAD FATEHprogress
06/22/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/22/2023Mechanical SystemsFAHAD FATEHspecial
06/22/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/22/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/22/2023Maintenance informationFAHAD FATEHenergy_progress
06/22/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/01/2023Insulation placement and R valuesGABRIEL GINGISHVILIenergy_progress
05/01/2023Exterior Insulation and Finish Systems (EIFS)GABRIEL GINGISHVILIspecial
05/01/2023Fire-Resistant Penetrations and JointsGABRIEL GINGISHVILIspecial
05/01/2023Energy Code Compliance InspectionsGABRIEL GINGISHVILIprogress
05/01/2023Fenestration air leakageGABRIEL GINGISHVILIenergy_progress
05/01/2023Fenestration and door U-factor and product ratingsGABRIEL GINGISHVILIenergy_progress
05/01/2023Interior lighting powerGABRIEL GINGISHVILIenergy_progress
05/01/2023Lighting controlsGABRIEL GINGISHVILIenergy_progress
05/01/2023Exterior lighting powerGABRIEL GINGISHVILIenergy_progress
Latest 25 of 42.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/30/2026B00601277-P3Request digital key ↗
08/30/2026B00601277-P1Request digital key ↗
08/30/2026B00601277-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026B00601277-P2Open ↗
09/01/2026B00601277-P2Open ↗
09/01/2026B00601277-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00601277-P2Open ↗
09/01/2026B00601277-P2Open ↗
08/31/2026B00601277-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/30/2026B00601277-S2Open ↗
08/30/2026B00601277-P3Open ↗
08/30/2026B00601277-P2Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00704954-P1Open ↗
08/15/2026B00601277-P2Open ↗
08/15/2026B00704954-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00601277-S1Open ↗
08/13/2026B00601277-I1Open ↗