← Back
Walk-up cooperative
205 PARK PLACE
BROOKLYN · BIN 3028747
💬 Discuss this project
1901Year Built
4Stories
C6Building Class
R6BZoning
12,572 sfGross Floor Area
16Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 205 PARK TENANTS CORP · 4,978 sf lot · 2.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 32p · 1 filing · 7 docs
Floor 22p · 1 filing · 7 docs
Floor 16p · 2 filings · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FOUNDATION MGMT NYC303/22/2026
205 PARK TENANTS CORP103/22/2026
205 PARK PLACE COOP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE603/21/2026
ARCHVISION DESIGN STUDIO103/21/2026
KUSHNER STUDIOS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BZJ CONSTRUCTION LLCGeneral Contractor404/09/2026
A.M.N. CORPORATIONPlumbing307/08/2026
STM INTERIOR CONSTRUCTIONGeneral Contractor204/09/2026
BRANDL ELECTRIC INC 000219General Contractor203/22/2026
GNS HOME IMPROVMENT LLCGeneral Contractor107/08/2026
GENESIS PLBG AND HTG CORPPlumbing107/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENVIRONMENTAL CODE CONSUL5516307/18/2025
ALMA ENGINEERING, P.C.7833106/01/2025
RICHMOND TESTING LAB263102/03/2023
Building Lifecycle
All (118)Filed (13)Permit Issued (9)Signed Off (6)Violation (12)Inspection (7)Objection (52)Special Inspection (19)
06/10/2026
Signed off — Alteration
RENOVATION OF EXISTING APARTMENT; NO CHANGE IN EGRESS OR USE
B01211927-I1
06/09/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/19/2026
Signed off — Alteration
INSTALLATION OF NEW SUPPORT COLUMNS AND FOOTINGS FOR EXISTING WOOD JOISTS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #B01090517-I1
B01090517-I1
05/05/2026
Signed off — Alteration
INSTALLATION OF NEW SUPPORT COLUMNS AND FOOTINGS FOR EXISTING WOOD JOISTS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #B01090517-I1
B01090517-S1
02/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Permit issued — Plumbing
B01090517-S1-PL
01/15/2026
Signed off — Alteration
INSTALLATION OF NEW SUPPORT COLUMNS AND FOOTINGS FOR EXISTING WOOD JOISTS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #B01090517-I1
B01090517-S2
12/17/2025
Signed off — Alteration
Replacement or reinforcement of roughly 300 SF of the deteriorated wood floor joist on the second and third floors, as per plans or EIC recommendations.The interior demolition and renovation of the impacted area will be filed under a separate application.
B01206940-I1
12/15/2025
Permit issued — General Construction
B01211927-I1-GC
11/03/2025
Permit issued — General Construction
B01206940-I1-GC-CX
07/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
Daniel Karpen
07/25/2025
Special inspection requirement — Final
Daniel Karpen
07/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Daniel Karpen
07/25/2025
Special inspection requirement — Structural Steel - Details
Daniel Karpen
07/22/2025
Special inspection requirement — Final
Daniel Karpen
07/18/2025
Filed — Alteration
INSTALLATION OF NEW SUPPORT COLUMNS AND FOOTINGS FOR EXISTING WOOD JOISTS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #B01090517-I1
B01090517-P2
07/16/2025
Filed — Alteration
INSTALLATION OF NEW SUPPORT COLUMNS AND FOOTINGS FOR EXISTING WOOD JOISTS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #B01090517-I1
B01090517-P1
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/15/2025
Special inspection requirement — Structural Steel - Details
Daniel Karpen
07/15/2025
Special inspection requirement — Final
Daniel Karpen
07/15/2025
Special inspection requirement — Final
Daniel Karpen
07/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Daniel Karpen
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/11/2025
Objection raised — Structural
06/11/2025
Objection raised — Admin
06/11/2025
Objection raised — Structural
06/11/2025
Objection raised — Structural
06/04/2025
Objection raised — Ventilation
06/04/2025
Objection resolved — Addressed
06/01/2025
Filed — Alteration
Replacement or reinforcement of roughly 300 SF of the deteriorated wood floor joist on the second and third floors, as per plans or EIC recommendations.The interior demolition and renovation of the impacted area will be filed under a separate application.
B01206940-I1
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Admin
05/27/2025
Objection raised — Fire_Protection
05/27/2025
Objection raised — Scope
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Scope
05/27/2025
Objection raised — Scope
05/14/2025
Filed — Alteration
RENOVATION OF EXISTING APARTMENT; NO CHANGE IN EGRESS OR USE
B01211927-I1
04/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2025
Special inspection requirement — Final
SAHAND AINECHI
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAHAND AINECHI
12/04/2024
Permit issued — Plumbing
B01090517-S1-PL
11/18/2024
Permit issued — Structural
B01090517-S2-ST
11/12/2024
Permit issued — General Construction
B01090517-I1-GC
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
08/28/2024
Objection resolved — Addressed
08/28/2024
Objection resolved — Addressed
08/28/2024
Objection resolved — Addressed
08/23/2024
Objection resolved — Addressed
08/23/2024
Objection resolved — Addressed
08/22/2024
Objection raised — Accessibility
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.M.N. CORPORATION01/16/2026
DOB NOWGeneral ConstructionSigned-offBZJ CONSTRUCTION LLC12/15/2025
DOB NOWGeneral ConstructionSigned-offBZJ CONSTRUCTION LLC11/03/2025
DOB NOWPlumbingSigned-offA.M.N. CORPORATION12/04/2024
DOB NOWStructuralSigned-offSTM INTERIOR CONSTRUCTION11/18/2024
DOB NOWGeneral ConstructionSigned-offSTM INTERIOR CONSTRUCTION11/12/2024
DOB NOWGeneral ConstructionPermit IssuedGNS HOME IMPROVMENT LLC04/18/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP03/29/2023
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP10/27/2020
BISOTISSUEDBZJ CONSTRUCTION LLC09/15/2020
BISPLISSUEDJUST PLBG & HTG INC03/20/2018
BISPLISSUEDS.J. VISION&SON P&H INC09/13/2016
BISOTISSUEDTBRO'S RENOVATION INC08/29/2016
BISPLISSUEDQMB PLUMBING & HEATING INC06/13/2016
BISOTISSUEDGLOBAL DESIGN GROUP NEW C06/10/2016
BISPLISSUEDLEFKES WATER WORKS INC01/06/2004
BISBLISSUEDLEFKES WATER WORKS INC01/06/2004
2 projects · most recent 07/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/18/2025Signed-offK.O.S. PLUMBING&HEATING,IGas, Water/Sanitary
07/28/2023Signed-offRRP PLUMBING CORPGas, Water/Sanitary
6 projects · most recent 04/14/2026
General Wiring
FiledStatusContractorScope
04/14/2026CompleteSUPER CHARGED ELEC. INC.General Wiring
11/29/2024CompleteBRANDL ELECTRIC INC.General Wiring
03/15/2023CompleteOGC ELECTRICAL CONTRACTORGeneral Wiring
11/22/2022CompleteSMITSON ELECTRIC CORPGeneral Wiring
08/24/2021CompleteRIVIERA ELECTRIC CORP—
10/26/2020CompleteWATTS ELECTRICAL CORPGeneral Wiring
1 project · most recent 07/18/2025
Steel Concrete
FiledStatusContractorScope
07/18/2025Signed-offK.O.S. PLUMBING&HEATING,ISteel, Concrete
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/09/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/25/2025Tenant Protection Plan ComplianceDaniel Karpenspecial
07/25/2025FinalDaniel Karpenprogress
07/25/2025Structural Stability – Alterations of existing buildingsDaniel Karpenspecial
07/25/2025Structural Steel - DetailsDaniel Karpenspecial
07/22/2025FinalDaniel Karpenprogress
07/16/2025Tenant Protection Plan Compliance—special
07/15/2025Structural Steel - DetailsDaniel Karpenspecial
07/15/2025FinalDaniel Karpenprogress
07/15/2025FinalDaniel Karpenprogress
07/15/2025Structural Stability – Alterations of existing buildingsDaniel Karpenspecial
04/07/2025FinalSAHAND AINECHIprogress
04/07/2025Structural Stability – Alterations of existing buildingsSAHAND AINECHIspecial
08/12/2024Tenant Protection Plan ComplianceDaniel Karpenspecial
08/02/2024Fire-Resistant Penetrations and JointsDaniel Karpenspecial
01/10/2023Lighting in dwelling unitsDAVID OBUCHOWSKIenergy_progress
01/10/2023FinalDAVID OBUCHOWSKIprogress
01/10/2023Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
08/17/2021HVAC insulation and sealing SHANE NEUFELDenergy_progress
01/28/2021HVAC insulation and sealing SHANE NEUFELDenergy_progress
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
08/27/2026B00810363-P1Request digital key ↗
08/27/2026B00810363-S1Request digital key ↗
08/21/2026B01211927-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00375591-I1Request digital key ↗
08/15/2026B00375591-P1Request digital key ↗
08/15/2026B00375591-P2Request digital key ↗
▸Applications & Permits24
▸DOB NOWLPC Approval/Permit12
08/27/2026B00810363-S1Open ↗
08/13/2026B00810363-I1Open ↗
08/13/2026B00810363-P1Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION6
09/15/2020340758246Open ↗
03/20/2018321439680Open ↗
09/14/2016321439680Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
02/12/2021340758246Open ↗
02/09/2021340758246Open ↗
09/02/2020340758246Open ↗
Showing 3 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/22/2016321400373Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026B00810363-S1Open ↗
08/21/2026B01090517-S1Open ↗
08/21/2026B01090517-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01090517-S2Open ↗
08/31/2026B01090517-P2Open ↗
08/29/2026B01090517-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01090517-S1Open ↗
09/01/2026B01090517-S2Open ↗
09/01/2026B01090517-S2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/03/2018321439680Open ↗
07/03/2018321439680Open ↗
05/05/2017321439680Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/02/2020340758246Open ↗
06/08/2016321400373Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/02/2020340758246Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/08/2016321400373Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/02/2020340758246Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/23/2016321439680Open ↗
06/08/2016321400373Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan3
08/13/2026B00375591-P1Open ↗
08/13/2026B00375591-P2Open ↗
08/13/2026B00375591-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
09/02/2020340758246Open ↗
08/23/2016321439680Open ↗
▸BISSTREET TREE CHECKLIST1
06/08/2016321400373Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026B00810363-S1Open ↗
08/21/2026B01090517-I1Open ↗
08/21/2026B01090517-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/02/2020340758246Open ↗
08/23/2016321439680Open ↗
06/08/2016321400373Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B01211927-I1Open ↗
08/13/2026B01206940-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/05/2017321439680Open ↗
05/05/2017321439680Open ↗
06/08/2016321400373Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/24/2021340758246Open ↗
09/15/2020340758246Open ↗
09/02/2020340758246Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/05/2017321439680Open ↗
09/22/2016321400373Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/02/2020340758246Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/24/2021340758246Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/24/2021340758246Open ↗
09/24/2021340758246Open ↗
09/15/2020340758246Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/24/2021340758246Open ↗
07/03/2018321439680Open ↗
06/18/2018321439680Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL4
09/02/2020340758246Open ↗
09/22/2016321400373Open ↗
08/23/2016321439680Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/02/2020340758246Open ↗
03/20/2018321439680Open ↗
▸BISLANDMARKS SIGNOFF1
09/24/2021340758246Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
09/02/2020340758246Open ↗
07/03/2018321439680Open ↗
05/05/2017321439680Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/24/2021340758246Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
07/03/2018321439680Open ↗
06/18/2018321439680Open ↗
▸BISEFILING COVER SHEET2
08/23/2016321439680Open ↗
06/08/2016321400373Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/02/2020340758246Open ↗
▸BISADDITIONAL INFORMATION1
02/12/2021340758246Open ↗
▸Other Documents5
▸DOB NOWProof of Historic Building4
08/13/2026B01211927-I1Open ↗
08/13/2026B01206940-I1Open ↗
08/13/2026B01090517-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/02/2020340758246Open ↗