Old law tenement
205 WEST 115TH STREET
MANHATTAN · BIN 1055235
💬 Discuss this project
1900Year Built
5Stories
C4Building Class
R7AZoning
—Gross Floor Area
11Units
66 Active Violations 64 unresolved · 2 paperwork only 5 likely answered ▸
Old law tenement · Owner of record: NYC Housing Preservation and Development · 4.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPlumbing workUnder Construction62p · 5 filings · 20 docs
Floor 61 filing · 17 docs
Floor 5Plumbing workUnder Construction56p · 4 filings · 20 docs
Floor 4Plumbing workUnder Construction56p · 4 filings · 20 docs
Floor 3Plumbing workUnder Construction57p · 4 filings · 20 docs
Floor 2Plumbing workUnder Construction59p · 4 filings · 20 docs
Floor 1Plumbing workUnder Construction60p · 4 filings · 20 docs
CellarPlumbing workUnder Construction61p · 5 filings · 20 docs
BasementPlumbing workUnder Construction2p · 1 filing · 9 docs
Site & exteriorPlumbing workUnder Construction16p · 3 filings · 15 docs
Filed — no permit issued2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1107/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design207/07/2026
Gace106/09/2026
Emtg Consultants605/28/2026
Romines Architecture312/08/2025
Kce Consulting Engineering107/18/2024
McLaren Engineering Group111/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1203/21/2026
Design 2147403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nova Construction ServiceScaffold310/09/2026
Summit JVGeneral Contractor204/09/2026
Touchstone RenovationsGeneral Contractor107/09/2026
L.L.G. Plumbing & HeatingPlumbing110/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616506/09/2026
Kce Consulting Engineering3712706/09/2026
Building Lifecycle
All (159)Filed (14)Permit Issued (7)Violation (60)Objection (48)Special Inspection (30)
10/15/2026
Permit issued — Plumbing
M00517263-I1-PL
10/08/2026
Permit issued — Sidewalk Shed
M01415052-I1-SH
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
08/27/2026
Objection raised — Scope
08/27/2026
Objection raised — Scope
08/27/2026
Objection raised — Scope
08/27/2026
Objection raised — Admin
08/27/2026
Objection raised — Zoning
07/27/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/08/2026
Permit issued — Sidewalk Shed
M01415052-I1-SH
07/07/2026
Filed — Alteration
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01415052-I1
07/07/2026
Permit issued — General Construction
M00517200-I1-GC
06/30/2026
Filed — Alteration
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01415033-I1
06/30/2026
Permit issued — Supported Scaffold
M01415033-I1-SF
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Accessibility
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Energy
06/26/2026
Objection raised — Cost
06/26/2026
Objection raised — Fire_Protection
06/09/2026
Filed — Alteration
REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, STUCCO REPLACEMENT AND LINTEL REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01353242-I1
05/28/2026
Filed — Alteration
BOILER INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01043009-S1
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kemba Walcott
05/07/2026
Special inspection requirement — Shutoff dampers
Kemba Walcott
05/07/2026
Special inspection requirement — Final
Kemba Walcott
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kemba Walcott
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Kemba Walcott
05/07/2026
Special inspection requirement — Mechanical Systems
Kemba Walcott
05/07/2026
Special inspection requirement — Heating Systems
Kemba Walcott
05/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kemba Walcott
04/14/2026
Filed — Alteration
HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00517263-P1
04/14/2026
Filed — Alteration
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00517253-P1
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kemba Walcott
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kemba Walcott
04/09/2026
Special inspection requirement — Final
Kemba Walcott
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Kemba Walcott
04/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kemba Walcott
04/09/2026
Special inspection requirement — Heating Systems
Kemba Walcott
04/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/09/2026
Special inspection requirement — Shutoff dampers
Kemba Walcott
04/09/2026
Special inspection requirement — Mechanical Systems
Kemba Walcott
03/25/2026
Permit issued — General Construction
M00517200-I1-GC
02/24/2026
Violation issued (HPD, open)
B
02/24/2026
Violation issued (HPD, open)
B
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedL.L.G. Plumbing & Heating10/15/2026
DOB NOWSidewalk ShedPermit IssuedNova Construction Service10/08/2026
DOB NOWSidewalk ShedPermit IssuedNova Construction Service07/08/2026
DOB NOWGeneral ConstructionPermit IssuedTouchstone Renovations07/07/2026
DOB NOWSupported ScaffoldPermit IssuedNova Construction Service06/30/2026
DOB NOWGeneral ConstructionPermit IssuedSummit JV03/25/2026
DOB NOWGeneral ConstructionPermit IssuedSummit JV12/31/2025
BIS—ISSUEDGM Robinson Construction02/07/1995
BIS—ISSUEDGM Robinson Construction10/19/1993
BISPLISSUEDBrown PLG & Heating Co06/08/1993
BISEQISSUEDGM Robinson Construction01/22/1993
BIS—ISSUEDRobinson Contracting01/11/1993
1 project · most recent 04/14/2026
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026——Air Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUZ-A@$-NHA7 2,600 BTU · Split System ×2
Heating
Slant-Fin TK-90 3,584 BTU ×18
Bell & Gossett E-60 2 kW · Pump ×4
Lochinvar FTX500N 500,000 BTU · Boiler ×4
Ventilation
Greenheck G-080-VG Exhaust Fan ×2
Rupp Air CASRTU1-E402-13-6T-DOAS 84,000 BTU · Doas ×2
Ducts & Piping
1 project · most recent 04/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/14/2026Permit IssuedL.L.G. Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 08/30/2026
General Wiring
FiledStatusContractorScope
08/30/2026Permit IssuedElectricworxnyGeneral Wiring
06/25/2026Permit IssuedTop Shelf Electric—
1 project · most recent 07/18/2024
Concrete Wood
FiledStatusContractorScope
07/18/2024——Concrete, Wood
2 projects · most recent 07/07/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/07/2026Permit IssuedNova Construction ServiceSidewalk Shed
06/30/2026Permit IssuedNova Construction ServiceScaffold
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
05/07/2026Mechanical SystemsKemba Walcottspecial
05/07/2026Heating SystemsKemba Walcottspecial
05/07/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
05/07/2026Energy Code Compliance InspectionsKemba Walcottprogress
05/07/2026FinalKemba Walcottprogress
05/07/2026HVAC-R and service water heating system controlsKemba Walcottenergy_progress
05/07/2026HVAC-R and service water heating equipmentKemba Walcottenergy_progress
05/07/2026Shutoff dampersKemba Walcottenergy_progress
05/07/2026HVAC-R and service water piping design and insulationKemba Walcottenergy_progress
04/09/2026Tenant Protection Plan Compliance—special
04/09/2026Tenant Protection Plan Compliance—special
04/09/2026Shutoff dampersKemba Walcottenergy_progress
04/09/2026HVAC-R and service water piping design and insulationKemba Walcottenergy_progress
04/09/2026HVAC-R and service water heating equipmentKemba Walcottenergy_progress
04/09/2026HVAC-R and service water heating system controlsKemba Walcottenergy_progress
04/09/2026FinalKemba Walcottprogress
04/09/2026Energy Code Compliance InspectionsKemba Walcottprogress
04/09/2026Mechanical SystemsKemba Walcottspecial
04/09/2026Heating SystemsKemba Walcottspecial
01/29/2026MasonryKemba Walcottspecial
01/29/2026FinalKemba Walcottprogress
01/29/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
01/29/2026Structural Stability – Alterations of existing buildingsKemba Walcottspecial
12/31/2025Fire-Resistance Rated ConstructionKemba Walcottprogress
12/31/2025Energy Code Compliance InspectionsKemba Walcottprogress
Latest 25 of 67.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026M00928912-I1Request digital key ↗
08/20/2026M00517200-P2Request digital key ↗
08/20/2026M00517200-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications53
▸DOB NOWSpecial Inspector Seal & Signature20
09/25/2026M00743484-I1Open ↗
09/25/2026M00743484-I1Open ↗
09/25/2026M00743484-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/25/2026M00743484-I1Open ↗
09/25/2026M00743484-I1Open ↗
09/01/2026M00517200-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026M00928912-I1Open ↗
08/20/2026M00517200-P2Open ↗
08/20/2026M00517200-P1Open ↗
Showing 3 of 14 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026M00517200-P2Open ↗
08/20/2026M00517200-I1Open ↗
08/17/2026M00517253-P1Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/28/2026M00928912-I1Open ↗
08/20/2026M00517200-P2Open ↗
08/20/2026M00517200-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/15/2026M01043009-I1Open ↗
08/14/2026M01043009-S1Open ↗
08/13/2026M00928912-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026M00743484-I1Open ↗
08/13/2026M00928912-I1Open ↗
08/13/2026M00517253-I1Open ↗
▸Other Documents12
▸DOB NOWDHCR Document8
08/13/2026M00743484-I1Open ↗
08/13/2026M00517200-P2Open ↗
08/13/2026M00517200-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00517200-P1Open ↗
08/13/2026M00517200-P2Open ↗
08/13/2026M00517200-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026M01043009-S1Open ↗