← Back
Factory, industrial, miscellaneous
205 WEST 38 STREET
MANHATTAN · BIN 1014482
💬 Discuss this project
1925Year Built
5Stories
F9Building Class
M1-9A/R12Zoning
10,510 sfGross Floor Area
5Units
0 Open Violations
Factory, industrial, miscellaneous · Owner of record: 205 PROPERTY CO., LLC · 2,010 sf lot · 5.23 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 12 docs
Floor 51p · 1 filing · 12 docs
Floor 4
Floor 31p · 1 filing · 12 docs
Floor 2
Floor 1Under Construction6p · 1 filing · 14 docs
CellarUnder Construction8p · 2 filings · 20 docs
1 job · most recent 09/09/2025
Ventilation Systems
FiledStatusContractorScope
09/09/2025——Ventilation Systems
1 job · most recent 02/23/2022
FiledStatusContractorScope
02/23/2022Signed-offRRP PLUMBING CORP—
1 job · most recent 09/09/2025
Gas
FiledStatusContractorScope
09/09/2025Permit IssuedKA&C MECH LLCGas
3 jobs · most recent 10/26/2023
General Wiring
FiledStatusContractorScope
10/26/2023Permit IssuedY.S ELECTRICGeneral Wiring
09/09/2019Permit IssuedUNITED ELEC'L CONT'G CORP6 meters, 6 new_meters
08/29/2018CompleteMEO ELECTRIC CORP—
1 job · most recent 12/15/2020
FiledStatusContractorScope
12/15/2020Signed-offJCNY DEVELOPMENT GR INC2 scope_items
Building Lifecycle
All (67)Filed (8)Permit Issued (12)Signed Off (3)Violation (24)Special Inspection (20)
05/20/2026
Permit issued — Plumbing
M01264877-I1-PL
09/09/2025
Filed — Alteration
THE PROPOSED RENOVATION/ALTERATION WORK COMPRISES OF INSTALLATION OF TYPE-1 HOOOD ON THE GROUNDFLOOR & EXHAUST FAN ON THE ROOF.MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01264877-S2
09/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
Vladimir Kaushansky
09/08/2025
Special inspection requirement — Ventilation and air distribution system
Vladimir Kaushansky
09/08/2025
Special inspection requirement — Permanent certificate
Vladimir Kaushansky
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
09/08/2025
Special inspection requirement — Heating Systems
Vladimir Kaushansky
09/08/2025
Special inspection requirement — Post-installed Anchors
Vladimir Kaushansky
09/08/2025
Special inspection requirement — Smoke Control Systems Testing
09/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Vladimir Kaushansky
09/08/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
08/29/2025
Filed — Alteration
THE PROPOSED RENOVATION/ALTERATION WORK COMPRISES OF INSTALLATION OF TYPE-1 HOOOD ON THE GROUNDFLOOR & EXHAUST FAN ON THE ROOF.MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01264877-I1
08/29/2025
Special inspection requirement — Shutoff dampers
Vladimir Kaushansky
08/29/2025
Special inspection requirement — Maintenance information
Vladimir Kaushansky
08/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vladimir Kaushansky
08/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Vladimir Kaushansky
08/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vladimir Kaushansky
07/31/2025
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
07/31/2025
Special inspection requirement — Final
Vladimir Kaushansky
11/02/2022
Signed off — Alteration
M00429987-I1
04/28/2022
Permit issued — Sprinklers
M00227454-I1-EW-SP
02/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
02/24/2022
Special inspection requirement — Sprinkler Systems
LOUIS LEE
02/23/2022
Filed — Alteration
INSTALL A NEW SPRINKLER SYSTEM IN CONJUNCTION WITH A2# 123506580 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00227454-P1
02/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
02/18/2022
Special inspection requirement — Sprinkler Systems
LOUIS LEE
09/07/2021
Permit issued — Construction Fence
M00429987-I1-FN
08/17/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00074980-I1
08/12/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY 48' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED)FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00283778-I1
01/04/2021
Permit issued — Construction Fence
M00429987-I1-FN
01/04/2021
Permit issued — Structural
M00436592-I1-ST
12/15/2020
Filed — Alteration
PROPOSE FACADE FRAMING WORK OF EXISTING 5-STORY BUILDING IN CONJUNCTION WITH ALT-2 #123506580 AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00436592-I1
12/14/2020
Permit issued — Supported Scaffold
M00283778-I1-SF
11/24/2020
Filed — Alteration
M00429987-I1
11/04/2020
Permit issued — Sidewalk Shed
M00074980-I1-SH
03/04/2020
Permit issued — Sprinklers
M00227454-I1-EW-SP
02/03/2020
Filed — Alteration
INSTALL A NEW SPRINKLER SYSTEM IN CONJUNCTION WITH A2# 123506580 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00227454-I1
12/23/2019
Permit issued — Supported Scaffold
M00283778-I1-SF
12/21/2019
Filed — Alteration
INSTALLATION OF TEMPORARY 48' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED)FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00283778-I1
11/04/2019
Permit issued — Sidewalk Shed
M00074980-I1-SH
03/19/2019
Violation issued (ECB, closed)
Construction
03/19/2019
Violation issued (ECB, closed)
Construction
01/14/2019
Violation issued (ECB, closed)
Construction
01/14/2019
Violation issued (ECB, closed)
Construction
11/29/2018
Violation issued (ECB, closed)
Construction
11/29/2018
Violation issued (ECB, closed)
Construction
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2018
Permit issued — Sidewalk Shed
M00074980-I1-SH
10/16/2018
Violation issued (ECB, closed)
Construction
10/11/2018
Violation issued (ECB, closed)
Construction
08/30/2018
Permit issued — Sidewalk Shed
M00074980-I1-SH
08/29/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00074980-I1
08/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/27/2018
Violation issued (ECB, closed)
Construction
08/27/2018
Violation issued (ECB, closed)
Construction
08/27/2018
Violation issued (ECB, closed)
Construction
08/27/2018
Violation issued (ECB, closed)
Construction
02/08/2001
Violation issued (ECB, closed)
Construction
Latest 60 of 67 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
203 205 PROPERTY1807/08/2026
5015HOLDINGS306/28/2026
FENWA CONSTRUCTION XUE FE203/22/2026
FENWA CONSTRUCTION AVE FE203/22/2026
205 PROPERTY COMPANY2303/22/2026
OWNER OF 205 W 38 ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JP ENGINEERING109/09/2025
BRUNSWICK ENGINEERING LLC108/29/2025
LL ENGINEERING PC202/23/2022
KADAN CORP112/15/2020
AUGUSTINE LEE ARCHITECT PC111/24/2020
ROYAL ENGINEERING, P.C212/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CLARKE CONSTRUCTION CONSULTANTS203/21/2026
MODERN BUILDING CONSULTANT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JCNY DEVELOPMENT GR INCGeneral Contractor903/21/2026
PHOENIX SUTTON STR INCGeneral Contractor907/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
YOUNG CHOEElectrical103/21/2026
KA&C MECH LLCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WINTON GROUP ARCHITECTURE4343109/09/2025
LL ENGINEERING PC1618202/23/2022
KADAN CORP.5956112/15/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKA&C MECH LLC05/20/2026
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.04/28/2022
DOB NOWConstruction FenceSigned-offJCNY DEVELOPMENT GR INC09/07/2021
DOB NOWConstruction FenceSigned-offJCNY DEVELOPMENT GR INC01/04/2021
DOB NOWStructuralSigned-offJCNY DEVELOPMENT GR INC01/04/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC12/14/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/04/2020
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.03/04/2020
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC12/23/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/04/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/29/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC08/30/2018
BISPLISSUEDRRP PLUMBING CORP07/07/2022
BISOTISSUEDPEERLESS BUILDERS INC04/06/2022
BISOTISSUEDPEERLESS BUILDERS INC10/19/2021
BISOTISSUEDPEERLESS BUILDERS INC10/19/2021
BISOTISSUEDJCNY DEVELOPMENT GR INC06/16/2021
BISOTISSUEDJCNY DEVELOPMENT GR INC01/14/2021
BISOTISSUEDJCNY DEVELOPMENT GR INC01/07/2021
BISOTISSUEDJCNY DEVELOPMENT GR INC09/12/2020
BISOTISSUEDJCNY DEVELOPMENT GR INC09/12/2020
BISOTISSUEDJCNY DEVELOPMENT GR INC06/26/2020
BISOTISSUEDJCNY DEVELOPMENT GR INC06/26/2020
BISPLISSUEDRRP PLUMBING CORP09/23/2019
BISOTISSUEDJCNY DEVELOPMENT GR INC04/09/2019
BISMHISSUEDJCNY DEVELOPMENT GR INC01/14/2019
BISOTISSUEDJCNY DEVELOPMENT GR INC01/10/2019
BISOTISSUEDFENWA CONSTRUCTION01/31/2018
BISOTISSUEDURBAN D.C. INC04/04/2012
BISOTISSUEDURBAN D.C. INC09/21/2011
BISEQISSUEDM.B.R. CONTRACTING INC.10/31/2006
BISOTISSUEDSHOMI 1 CONSTRUCTION INC.10/26/2006
BISMHISSUEDSTACO SYSTEM, INC.11/22/2002
BISFPISSUEDIDEAL FIRE CONTROL INC01/10/2001
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/15/1995
BISPLISSUEDACE CONTRACTING CORP11/25/1991
BISFPISSUEDFIRE FOE CORPORATION04/04/1991
BISOTISSUEDNOVASCTIA GENERAL CONTRACTING CO02/21/1991
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/08/2025Duct leakage testing, insulation and designVladimir Kaushanskyenergy_progress
09/08/2025Ventilation and air distribution systemVladimir Kaushanskyenergy_progress
09/08/2025Permanent certificateVladimir Kaushanskyenergy_progress
09/08/2025Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
09/08/2025Heating SystemsVladimir Kaushanskyspecial
09/08/2025Post-installed AnchorsVladimir Kaushanskyspecial
09/08/2025Smoke Control Systems Testing—special
09/08/2025Tenant Protection Plan ComplianceVladimir Kaushanskyspecial
09/08/2025Exhaust and Vent Systems in Plenums and Ducts—special
08/29/2025Shutoff dampersVladimir Kaushanskyenergy_progress
08/29/2025Maintenance informationVladimir Kaushanskyenergy_progress
08/29/2025HVAC-R and service water heating system controlsVladimir Kaushanskyenergy_progress
08/29/2025HVAC-R and service water piping design and insulationVladimir Kaushanskyenergy_progress
08/29/2025HVAC-R and service water heating equipmentVladimir Kaushanskyenergy_progress
07/31/2025Mechanical SystemsVladimir Kaushanskyspecial
07/31/2025FinalVladimir Kaushanskyprogress
02/24/2022Fire-Resistant Penetrations and JointsLOUIS LEEspecial
02/24/2022Sprinkler SystemsLOUIS LEEspecial
02/18/2022Fire-Resistant Penetrations and JointsLOUIS LEEspecial
02/18/2022Sprinkler SystemsLOUIS LEEspecial
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch3
09/06/2026M00074980-I1Request digital key ↗
08/21/2026M01264877-S2Request digital key ↗
08/21/2026M01264877-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026M00227454-I1Request digital key ↗
09/02/2026M00227454-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00436592-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00429987-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00283778-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION18
09/23/2024123227864Open ↗
09/13/2024123227864Open ↗
03/21/2024123227864Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION11
07/11/2022123506580Open ↗
10/20/2021140987797Open ↗
10/20/2021123506580Open ↗
Showing 3 of 11 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
01/14/2021140972446Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
01/14/2021140972446Open ↗
▸Seals & Professional Certifications38
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/11/2019123506580Open ↗
01/10/2019123506580Open ↗
10/24/2018123506580Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/06/2026M00074980-I1Open ↗
09/04/2026M00429987-I1Open ↗
09/04/2026M00436592-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M01264877-S2Open ↗
09/01/2026M01264877-S2Open ↗
09/01/2026M01264877-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M00227454-P1Open ↗
09/02/2026M00227454-P1Open ↗
09/01/2026M01264877-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/07/2020140987797Open ↗
10/29/2020140972446Open ↗
01/30/2018123227864Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/07/2020140987797Open ↗
10/29/2020140972446Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/07/2020140987797Open ↗
10/29/2020140972446Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/30/2018123227864Open ↗
10/04/2011120830495Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/04/2011120830495Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING5
09/19/2022123506580Open ↗
05/18/2022123506580Open ↗
05/17/2022123506580Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/24/2018123506580Open ↗
▸Safety & Tenant Protection6
▸DOB NOWHPD-1: Anti-Harassment Area Checklist5
09/04/2026M00436592-I1Open ↗
09/02/2026M00227454-P1Open ↗
09/02/2026M00227454-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00283778-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00436592-I1Open ↗
09/02/2026M00227454-I1Open ↗
09/02/2026M00227454-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/07/2020140987797Open ↗
10/29/2020140972446Open ↗
10/24/2018123506580Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/05/2011120830495Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/10/2019123506580Open ↗
10/24/2018123506580Open ↗
10/24/2018123506580Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/19/2024123227864Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/04/2011120830495Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/13/2023140972446Open ↗
10/27/2023140972446Open ↗
09/23/2022140987797Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/23/2024123227864Open ↗
11/14/2023140972446Open ↗
09/29/2022140987797Open ↗
▸BISSUPERSEDING LETTER2
10/20/2021140987797Open ↗
10/20/2021123506580Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/04/2011120830495Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
10/27/2023140972446Open ↗
09/22/2022140987797Open ↗
12/07/2020140987797Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/19/2024123227864Open ↗
11/13/2023140972446Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET5
10/24/2018123506580Open ↗
10/24/2018123506580Open ↗
10/24/2018123506580Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
11/13/2023123506580Open ↗
10/20/2022123506580Open ↗
06/06/2022123506580Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/07/2020140987797Open ↗
10/29/2020140972446Open ↗
▸BISBOROUGH INTAKE FORM1
07/11/2022123506580Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00074980-I1Open ↗