← Back
Office with commercial, 7-19 stories
205 WEST 39 STREET
MANHATTAN · Midtown-Times Square · BIN 1080570
💬 Discuss this project
1922Year Built
16Stories
O6Building Class
M1-9A/R12Zoning
229,162 sfGross Floor Area
22Units
LL97 Covered3 Open Violations ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 205 WEST 39TH ST COMPANY · 21,478 sf lot · 10.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof7p · 5 filings · 20 docs
Bulkhead2p · 1 filing · 3 docs
Floor 179p · 3 filings · 18 docs
Floor 16
Floor 15
Floor 142p · 1 filing · 11 docs
Floor 13
Floor 121p · 1 filing · 11 docs
Floor 11
Floor 10
Floor 92p · 1 filing · 4 docs
Floor 84p · 3 filings · 20 docs
Floor 7
Floor 63p · 1 filing · 10 docs
Floor 5
Floor 4
Floor 35p · 5 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
205 WEST 39TH STREET COMPANY28907/08/2026
205 WEST 39TH COMPANY203/22/2026
205 WEST 39 ST COMPANY1503/22/2026
205 W 39TH ST. CO503/22/2026
LARRY LEVINE CO103/22/2026
205 W 39 ST COMPANY303/22/2026
MRD ELECTRICAL SERVICES, INC.103/22/2026
205 QEST 39TH ST COMPANY603/21/2026
205 WEST 39TH STREET BUILDING OF603/21/2026
205 WEST 3603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.5003/21/2026
ARCHETYPE CONSULTANTS1003/21/2026
CODE403/21/2026
PS ENGINEERS403/21/2026
JME BUILDING CONSULTING, LLC203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE FOUR CONSTRUCTION INGeneral Contractor1407/08/2026
TRIBUTE RESTORATION INCGeneral Contractor1007/08/2026
RAYMOND WILSONElectrical603/21/2026
PHOENIX SUTTON STR INCGeneral Contractor507/08/2026
OMBRELLINO CONSTRUCTION & PAINTGeneral Contractor307/08/2026
D.B.J. CONTRACTING CORPGeneral Contractor307/08/2026
SEAN COAKLEY P & H INCFire Protection307/08/2026
LEMX CORPGeneral Contractor303/21/2026
WILLIAM F VENTURA P&H INCPlumbing203/22/2026
ASHLAR MECHANICAL CORPFire Protection207/08/2026
MEGA PLBG CORPFire Protection207/08/2026
MEGA PLBG CORPPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
MRD ELEC'L SERVICES, INCElectrical103/22/2026
HERTLER NADILE P & H, INCPlumbing107/08/2026
ANTHONY NOLANElectrical103/21/2026
NEW YORK PLBG-HTG-COOLINGPlumbing107/08/2026
SEAN COAKLEY P & H INCPlumbing107/08/2026
NEW YORK PLUMBING-HEATINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827101/13/2026
CHEN ENGINEERING SERVICES1826204/25/2025
JACK GREEN ASSOCIATES422412/29/2022
P.A.COLLINS INSPECTIONS P21681410/19/2022
ROCK ARCH ENG CORP7831208/03/2022
AR CONSULTING ENGINEER P.4054107/19/2022
RLM ENGINEERING PLLC6913410/27/2021
Building Lifecycle
All (265)Filed (47)Permit Issued (37)Signed Off (28)Facade (FISP) (24)Violation (60)Inspection (23)Objection (16)Special Inspection (30)
04/14/2026
Signed off — Alteration
M01313055-I1
04/01/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/26/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/03/2026
Permit issued — Sprinklers
M01313055-I1-EW-SP
01/13/2026
Filed — Alteration
M01313055-I1
11/06/2025
Signed off — Alteration
Mechanical work on the 17th floor (Breaking Waves) as indicated on drawings. No change in use egress or occupancy.
M08042589-I1
08/12/2025
Signed off — Alteration
REINFORCEMENT OF EXTERIOR STEEL SPANDREL BEAMS AT NORTH-EAST CORNER OF THE BUILDING AT THE ROOF LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01215435-I1
08/11/2025
Permit issued — Structural
M01215435-I1-ST
06/10/2025
Signed off — Alteration
Construction work on the 17th floor (Breaking Waves) as indicated on drawings. EN drawings for lighting are filed under M08042589-I1. No change in use egress or occupancy.
M08042638-I1
06/10/2025
Signed off — Alteration
Replacing and installing existing drywall with new to relocate existing bathrooms and creating two new bathrooms as per plans filed herewith.
M00577985-I1
05/29/2025
Permit issued — General Construction
M00577985-I1-GC
05/15/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Structural
04/25/2025
Filed — Alteration
REINFORCEMENT OF EXTERIOR STEEL SPANDREL BEAMS AT NORTH-EAST CORNER OF THE BUILDING AT THE ROOF LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01215435-I1
04/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
HENLIA CHEN
04/24/2025
Special inspection requirement — Masonry
HENLIA CHEN
04/24/2025
Special inspection requirement — Final
HENLIA CHEN
04/24/2025
Special inspection requirement — Structural Steel - Welding
HENLIA CHEN
04/24/2025
Special inspection requirement — Structural Steel - High Strength Bolting
HENLIA CHEN
04/24/2025
Special inspection requirement — Structural Steel - Details
HENLIA CHEN
03/31/2025
Signed off — Alteration
INSTALL SUPPORTED PIPE SCAFFOLD AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00774724-I1
03/31/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00254895-I1
03/24/2025
Signed off — Alteration
M01192898-I1
03/13/2025
Permit issued — Suspended Scaffold
M01192898-I1-SC
03/11/2025
Filed — Alteration
M01192898-I1
01/30/2025
Signed off — Alteration
Facade Repairs as per plans filed herewith. No change in use, egress or occupancy.
M00647388-I1
01/24/2025
Cycle 9 facade report signed — SAFE
01/13/2025
Objection raised — Other
01/13/2025
Objection resolved — Addressed
01/09/2025
Filed — No Work
M01164957-I1
12/27/2024
Cycle 9 facade report submitted
12/18/2024
Cycle 9 facade inspection completed
11/25/2024
Signed off — Alteration
Sprinkler work on the 17th floor (Breaking Waves) as indicated on drawings. No change in use egress or occupancy.
M08042631-I1
11/21/2024
Signed off — Alteration
Plumbing work on the 17th floor (Breaking Waves) as indicated on drawings. No change in use egress or occupancy.
M08042615-I1
11/08/2024
Signed off — Alteration
M00668154-I1
10/02/2024
Permit issued — Supported Scaffold
M00774724-I1-SF
09/24/2024
Permit issued — General Construction
M00647388-I1-GC
08/28/2024
Permit issued — General Construction
M00647388-I1-GC
07/29/2024
Permit issued — Sidewalk Shed
M00668154-I1-SH
07/25/2024
Cycle 9 facade report submitted
07/22/2024
Cycle 9 facade report signed — UNSAFE
06/14/2024
Cycle 9 facade inspection completed
02/22/2024
Violation issued (ECB, closed)
Local Law
01/22/2024
Permit issued — Sidewalk Shed
M00668154-I1-SH
12/28/2023
Cycle 9 facade report submitted
12/26/2023
Cycle 9 facade report signed — UNSAFE
12/05/2023
Cycle 9 facade inspection completed
09/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/10/2023
Permit issued — General Construction
M00647388-I1-GC
07/21/2023
Permit issued — Supported Scaffold
M00774724-I1-SF
07/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/26/2023
Filed — Alteration
M00668154-P1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2023
Permit issued — Sprinklers
M08042631-I1-EW-SP
Latest 60 of 265 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offSEAN COAKLEY P & H INC02/03/2026
DOB NOWStructuralSigned-offDBJ CONTRACTING08/11/2025
DOB NOWGeneral ConstructionSigned-offDBJ CONTRACTING05/29/2025
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC03/13/2025
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC10/02/2024
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC09/24/2024
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC08/28/2024
DOB NOWSidewalk ShedSigned-offLEMX CORP07/29/2024
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC01/22/2024
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC08/10/2023
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC07/21/2023
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP04/20/2023
DOB NOWMechanical SystemsSigned-offOMBRELLINO CONSTRUCTION &02/15/2023
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP02/09/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC01/23/2023
DOB NOWGeneral ConstructionSigned-offOMBRELLINO CONSTRUCTION &01/19/2023
DOB NOWPlumbingSigned-offHERTLER NADILE P & H, INC01/11/2023
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC08/08/2022
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC07/20/2022
DOB NOWMechanical SystemsSigned-offNEW YORK PLUMBING-HEATING02/14/2022
DOB NOWSprinklersSigned-offSEAN COAKLEY P & H INC01/28/2022
DOB NOWMechanical SystemsSigned-offCORE FOUR CONSTRUCTION IN01/26/2022
DOB NOWPlumbingSigned-offSEAN COAKLEY P & H INC01/25/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC01/25/2022
DOB NOWGeneral ConstructionSigned-offCORE FOUR CONSTRUCTION IN11/23/2021
DOB NOWGeneral ConstructionSigned-offCORE FOUR CONSTRUCTION IN11/19/2021
DOB NOWSprinklersSigned-offSEAN COAKLEY P & H INC11/17/2021
DOB NOWMechanical SystemsSigned-offCORE FOUR CONSTRUCTION IN11/15/2021
DOB NOWPlumbingSigned-offNEW YORK PLBG-HTG-COOLING10/26/2021
DOB NOWSprinklersSigned-offREAL PLUMBING CORP08/23/2021
DOB NOWMechanical SystemsSigned-offCORE FOUR CONSTRUCTION IN08/19/2021
DOB NOWGeneral ConstructionSigned-offCORE FOUR CONSTRUCTION IN08/18/2021
DOB NOWPlumbingSigned-offMEGA PLBG CORP07/16/2021
DOB NOWGeneral ConstructionSigned-offCORE FOUR CONSTRUCTION IN05/26/2021
DOB NOWMechanical SystemsSigned-offCORE FOUR CONSTRUCTION IN12/04/2019
DOB NOWPlumbingSigned-offMEGA PLBG CORP11/26/2019
DOB NOWSprinklersSigned-offREAL PLUMBING CORP11/26/2019
BISSPISSUEDMEGA PLBG CORP05/26/2023
BISSPISSUEDMEGA PLBG CORP05/26/2023
BISPLISSUEDMEGA PLBG CORP05/13/2022
+ 47 more permits on file
1 project · most recent 04/27/2022
FiledStatusContractorScope
04/27/2022——172 heads
1 project · most recent 04/27/2022
FiledStatusContractorScope
04/27/2022———
8 projects · most recent 09/08/2025
General Wiring
FiledStatusContractorScope
09/08/2025CompleteALLCOM ELECTRIC CORPGeneral Wiring
07/30/2024CompleteRICHARD NEU—
04/19/2022CompleteMRD ELEC'L SERVICES, INCGeneral Wiring
04/13/2022CompleteEASTERN ELEC'L CONST INCGeneral Wiring
01/03/2022CompleteELPO ELECTRICAL CONTG INC—
11/26/2019CompleteHUB ELECTRIC INC.General Wiring
09/25/2018CompleteHUB ELECTRIC INC.General Wiring
03/13/2018CompleteALLCOM ELECTRIC CORPGeneral Wiring
1 project · most recent 08/22/2022
Steel Concrete Masonry
FiledStatusContractorScope
08/22/2022——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
04/01/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/03/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
04/24/2025Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
04/24/2025MasonryHENLIA CHENspecial
04/24/2025Structural Steel - High Strength BoltingHENLIA CHENspecial
04/24/2025Structural Steel - WeldingHENLIA CHENspecial
04/24/2025FinalHENLIA CHENprogress
04/24/2025Structural Steel - DetailsHENLIA CHENspecial
02/06/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
02/06/2023Post-installed AnchorsJACK GREENspecial
01/06/2023Electrical motors and elevatorsJACK GREENenergy_progress
11/18/2022FinalJACK GREENprogress
11/18/2022Energy Code Compliance InspectionsJACK GREENprogress
11/18/2022Mechanical SystemsJACK GREENspecial
11/18/2022Sprinkler SystemsJACK GREENspecial
11/18/2022Shutoff dampersJACK GREENenergy_progress
11/18/2022Ventilation and air distribution systemJACK GREENenergy_progress
11/18/2022HVAC-R and service water heating equipmentJACK GREENenergy_progress
11/18/2022Maintenance informationJACK GREENenergy_progress
11/18/2022HVAC-R and service water piping design and insulationJACK GREENenergy_progress
11/18/2022Lighting controlsJACK GREENenergy_progress
11/18/2022HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/18/2022Interior lighting powerJACK GREENenergy_progress
10/20/2022Energy Code Compliance InspectionsPaul Collinsprogress
10/20/2022Lighting controlsPaul Collinsenergy_progress
10/20/2022Interior lighting powerPaul Collinsenergy_progress
10/20/2022HVAC-R and service water piping design and insulationPaul Collinsenergy_progress
Latest 25 of 98.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Calvin KleinOfficeFloors 6, 8, 9
Project M01313055 Alteration · LOC Issued · 01/13/2026
Project M00646015 Alteration · LOC Issued · 01/24/2022
Project M00623636 Alteration · LOC Issued · 11/17/2021
Project M00623645 Alteration · LOC Issued · 11/17/2021
Project M00624533 Alteration · LOC Issued · 11/10/2021
Project M00624567 Alteration · LOC Issued · 11/10/2021
Project M00545771 Alteration · LOC Issued · 07/09/2021
Project M00546466 Alteration · LOC Issued · 07/08/2021
Project M00515145 Alteration · LOC Issued · 05/19/2021
Breaking WavesOfficeFloor 17
Project M08042589 Alteration · LOC Issued · 12/29/2022
Project M08042631 Alteration · LOC Issued · 12/22/2022
Project M08042638 Alteration · LOC Issued · 12/22/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,854 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch41
09/03/2026M00515145-I1Request digital key ↗
09/03/2026M00546455-P1Request digital key ↗
09/03/2026M00546455-P2Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/15/2026M01164957-I1Request digital key ↗
08/15/2026M00274545-I1Request digital key ↗
08/15/2026M00301023-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00255114-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00254895-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00255231-I1Request digital key ↗
▸Applications & Permits304
▸BISPLAN / WORK APPROVAL APPLICATION175
10/01/2025121697164Open ↗
08/08/2025121896868Open ↗
07/11/2025121697164Open ↗
Showing 3 of 175 on file for this type
▸BISWORK PERMIT APPLICATION129
05/30/2023122771278Open ↗
05/30/2023122657437Open ↗
05/20/2021122657428Open ↗
Showing 3 of 129 on file for this type
▸Seals & Professional Certifications466
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION216
11/21/2019123792645Open ↗
10/07/2019123507589Open ↗
10/07/2019123507589Open ↗
Showing 3 of 216 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST55
03/02/2022122771269Open ↗
11/21/2019123792645Open ↗
Showing 2 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature47
09/02/2026M00577917-I1Open ↗
09/02/2026M00577917-I1Open ↗
09/02/2026M08042589-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/05/2026M00274545-I1Open ↗
09/03/2026M00515145-I1Open ↗
09/03/2026M00546455-I1Open ↗
Showing 3 of 46 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT42
11/06/2020140967149Open ↗
11/21/2019123792645Open ↗
Showing 2 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/20/2026M00255231-I1Open ↗
09/20/2026M00255231-I1Open ↗
09/20/2026M00255231-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/06/2020140967149Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/06/2020140967149Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment169
▸BISSELF-CERT PLUMBING NOTICE42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE35
06/21/2019123437129Open ↗
Showing 1 of 35 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA27
10/14/2022122776601Open ↗
10/16/2020123030139Open ↗
Showing 2 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING21
10/01/2025121697164Open ↗
06/10/2022122771269Open ↗
Showing 2 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS12
07/08/2025121542580Open ↗
07/01/2025121542580Open ↗
03/06/2025120975757Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
07/08/2025121542580Open ↗
03/06/2025120975757Open ↗
07/05/2019123437129Open ↗
Showing 3 of 11 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT3
06/30/2025121542580Open ↗
03/31/2025122072265Open ↗
03/06/2025120975757Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
06/30/2025121542580Open ↗
03/31/2025122072265Open ↗
▸BISSPRINKLER SYSTEMS2
07/10/2025121896868Open ↗
03/31/2025122092467Open ↗
▸Safety & Tenant Protection41
▸DOB NOWHPD-1: Anti-Harassment Area Checklist36
09/03/2026M00515145-I1Open ↗
09/03/2026M00546455-P1Open ↗
09/03/2026M00546455-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWCertificate of No Harassment3
09/02/2026M00647388-I1Open ↗
09/02/2026M00647388-P1Open ↗
Showing 2 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
11/06/2020140967149Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
11/21/2019123792645Open ↗
▸Environmental & Asbestos138
▸BISASBESTOS: CERTIFICATION (DEP ACP5)64
11/06/2020140967149Open ↗
11/21/2019123792645Open ↗
Showing 2 of 64 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
09/03/2026M00515145-I1Open ↗
09/03/2026M00546455-I1Open ↗
09/03/2026M00546455-P1Open ↗
Showing 3 of 38 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/02/2026M00647388-I1Open ↗
09/02/2026M00647388-I1Open ↗
▸Energy Compliance119
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS56
11/21/2019123792645Open ↗
07/05/2019123437129Open ↗
Showing 2 of 56 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
06/30/2025121542580Open ↗
05/05/2022123348430Open ↗
04/25/2022123348430Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
06/30/2025121542580Open ↗
04/23/2025120952111Open ↗
04/09/2025140967149Open ↗
Showing 3 of 6 on file for this type
▸BISINTERIOR LIGHTING POWER4
06/30/2025121542580Open ↗
04/23/2025120952111Open ↗
03/31/2025122072265Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING CONTROLS4
06/30/2025121542580Open ↗
04/09/2025140967149Open ↗
03/31/2025122072265Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
04/23/2025120952111Open ↗
03/06/2025120975757Open ↗
10/11/2022122771269Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* HVAC INSULATION AND SEALING2
03/06/2025120975757Open ↗
10/11/2022122771269Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/09/2021122657428Open ↗
11/06/2020140967149Open ↗
▸BIS* DUCT LEAKAGE TESTING1
06/30/2025121542580Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/15/2025104742245Open ↗
02/25/2025120975757Open ↗
05/05/2022123348430Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)5
04/09/2025140967149Open ↗
03/31/2025122092467Open ↗
03/31/2025122072265Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISMECHANICAL SYSTEMS4
06/30/2025121542580Open ↗
03/31/2025122072265Open ↗
02/25/2025120975757Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs163
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST99
09/15/2025104742245Open ↗
09/04/2025122381840Open ↗
08/08/2025121896868Open ↗
Showing 3 of 99 on file for this type
▸BISADMINISTRATIVE OBJECTIONS35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL7
06/30/2025121542580Open ↗
04/23/2025120952111Open ↗
04/09/2025140967149Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER6
05/30/2023122771278Open ↗
05/30/2023122657437Open ↗
05/20/2021122657428Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership184
▸BISCOST AFFIDAVIT168
06/14/2023122771278Open ↗
05/05/2022123348430Open ↗
04/25/2022123348430Open ↗
Showing 3 of 168 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW316
09/15/2025104742245Open ↗
09/02/2025122381840Open ↗
06/30/2025121542580Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms164
▸BISEFILING COVER SHEET104
11/21/2019123792645Open ↗
Showing 1 of 104 on file for this type
▸BISBOROUGH INTAKE FORM34
05/20/2021122657428Open ↗
05/20/2021122771269Open ↗
04/10/2020123507589Open ↗
Showing 3 of 34 on file for this type
▸BISADDITIONAL INFORMATION24
06/24/2022122771269Open ↗
Showing 1 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/06/2020140967149Open ↗
Showing 1 of 2 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00770631-I1Open ↗
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type