← Back
BuildNYC
Office with commercial, 7-19 stories
205 WEST 39TH STREET
MANHATTAN · BIN 1080570
💬 Discuss this project
1922Year Built
16Stories
O6Building Class
M1-9A/R12Zoning
229,162 sfGross Floor Area
22Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 205 West 39th St Company · 21,478 sf lot · 10.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof205 West 39th Street Company13p · 4 filings · 20 docs
BulkheadSuspended scaffold and demolition2p · 1 filing · 3 docs
Floor 17Breaking Waves34p · 4 filings · 20 docs
Floor 16
Floor 15Raw Brands18p · 3 filings · 20 docs
Floor 14205 West 39th Street Company10p · 3 filings · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Calvin Klein10p · 3 filings · 20 docs
Floor 8Calvin Klein28p · 5 filings · 20 docs
Floor 7
Floor 6Calvin Klein22p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 3Calvin Klein3p · 1 filing · 2 docs
Floor 2
Floor 130p · 3 filings · 6 docs
Site & exterior205 West 39th St Company14p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
205 West 39th Company30107/08/2026
205 West 39th Street Building of603/21/2026
205 W 39th St Co203/21/2026
G. Holdings103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Marc Feldman101/13/2026
Cuono Engineering204/25/2025
SYNC Architecture201/09/2025
Enthink Engineers204/26/2023
Jack Green Associates404/19/2023
Asda Architecture + Design112/22/2022
Robert Derector Associates1810/19/2022
Rock Arch Engineering208/03/2022
PS Engineers107/19/2022
A/R Environetics Architects604/27/2022
RLM Engineering610/27/2021
Andrew Formichella112/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants5003/21/2026
Archetype Consultants1003/21/2026
Code403/21/2026
PS Engineers403/21/2026
Evangelista203/21/2026
Municipal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Four ConstructionGeneral Contractor1407/08/2026
Sterling ElectricElectrical603/21/2026
Tribute Restorationspecialty_contractor507/08/2026
Tribute RestorationScaffold507/08/2026
Phoenix Sutton STRScaffold507/08/2026
D.B.J. ContractingGeneral Contractor307/08/2026
LemxScaffold303/21/2026
Ombrellino Construction & PaintGeneral Contractor307/08/2026
Sean Coakley P & HFire Protection307/08/2026
William F Ventura P&HPlumbing203/22/2026
Ashlar MechanicalFire Protection207/08/2026
Mega PlumbingFire Protection207/08/2026
Mega PlumbingPlumbing207/08/2026
Hertler Nadile P & HPlumbing107/08/2026
Sean Coakley P & HPlumbing107/08/2026
Allcom ElectricElectrical103/21/2026
New York Plumbing-Heating-CoolingPlumbing107/08/2026
New York Plumbing-Heatingspecialty_contractor107/08/2026
MRD Electrical ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827101/13/2026
Chen Engineering Services1826204/25/2025
Jack Green Associates422412/29/2022
P.a.collins Inspections P21681410/19/2022
Rock Arch Engineering7831208/03/2022
AR Consulting Engineer P4054107/19/2022
RLM Engineering6913410/27/2021
Building Lifecycle
All (263)Filed (47)Permit Issued (37)Signed Off (28)Facade (FISP) (24)Violation (60)Inspection (21)Objection (16)Special Inspection (30)
04/14/2026
Signed off — Alteration
M01313055-I1
03/26/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/03/2026
Permit issued — Sprinklers
M01313055-I1-EW-SP
01/13/2026
Filed — Alteration
M01313055-I1
11/06/2025
Signed off — Alteration
Mechanical work on the 17th floor (Breaking Waves) as indicated on drawings. No change in use egress or occupancy.
M08042589-I1
08/12/2025
Signed off — Alteration
REINFORCEMENT OF EXTERIOR STEEL SPANDREL BEAMS AT NORTH-EAST CORNER OF THE BUILDING AT THE ROOF LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01215435-I1
08/11/2025
Permit issued — Structural
M01215435-I1-ST
06/10/2025
Signed off — Alteration
Construction work on the 17th floor (Breaking Waves) as indicated on drawings. EN drawings for lighting are filed under M08042589-I1. No change in use egress or occupancy.
M08042638-I1
06/10/2025
Signed off — Alteration
Replacing and installing existing drywall with new to relocate existing bathrooms and creating two new bathrooms as per plans filed herewith.
M00577985-I1
05/29/2025
Permit issued — General Construction
M00577985-I1-GC
05/15/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Structural
04/25/2025
Filed — Alteration
REINFORCEMENT OF EXTERIOR STEEL SPANDREL BEAMS AT NORTH-EAST CORNER OF THE BUILDING AT THE ROOF LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01215435-I1
04/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
HENLIA CHEN
04/24/2025
Special inspection requirement — Final
HENLIA CHEN
04/24/2025
Special inspection requirement — Structural Steel - Welding
HENLIA CHEN
04/24/2025
Special inspection requirement — Masonry
HENLIA CHEN
04/24/2025
Special inspection requirement — Structural Steel - High Strength Bolting
HENLIA CHEN
04/24/2025
Special inspection requirement — Structural Steel - Details
HENLIA CHEN
03/31/2025
Signed off — Alteration
INSTALL SUPPORTED PIPE SCAFFOLD AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00774724-I1
03/31/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00254895-I1
03/24/2025
Signed off — Alteration
M01192898-I1
03/13/2025
Permit issued — Suspended Scaffold
M01192898-I1-SC
03/11/2025
Filed — Alteration
M01192898-I1
01/30/2025
Signed off — Alteration
Facade Repairs as per plans filed herewith. No change in use, egress or occupancy.
M00647388-I1
01/24/2025
Cycle 9 facade report signed — SAFE
01/13/2025
Objection raised — Other
01/13/2025
Objection resolved — Addressed
01/09/2025
Filed — No Work
M01164957-I1
12/27/2024
Cycle 9 facade report submitted
12/18/2024
Cycle 9 facade inspection completed
11/25/2024
Signed off — Alteration
Sprinkler work on the 17th floor (Breaking Waves) as indicated on drawings. No change in use egress or occupancy.
M08042631-I1
11/21/2024
Signed off — Alteration
Plumbing work on the 17th floor (Breaking Waves) as indicated on drawings. No change in use egress or occupancy.
M08042615-I1
11/08/2024
Signed off — Alteration
M00668154-I1
10/02/2024
Permit issued — Supported Scaffold
M00774724-I1-SF
09/24/2024
Permit issued — General Construction
M00647388-I1-GC
08/28/2024
Permit issued — General Construction
M00647388-I1-GC
07/29/2024
Permit issued — Sidewalk Shed
M00668154-I1-SH
07/25/2024
Cycle 9 facade report submitted
07/22/2024
Cycle 9 facade report signed — UNSAFE
06/14/2024
Cycle 9 facade inspection completed
02/22/2024
Violation issued (ECB, closed)
Local Law
01/22/2024
Permit issued — Sidewalk Shed
M00668154-I1-SH
12/28/2023
Cycle 9 facade report submitted
12/26/2023
Cycle 9 facade report signed — UNSAFE
12/05/2023
Cycle 9 facade inspection completed
09/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/10/2023
Permit issued — General Construction
M00647388-I1-GC
07/21/2023
Permit issued — Supported Scaffold
M00774724-I1-SF
07/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/26/2023
Filed — Alteration
M00668154-P1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2023
Permit issued — Sprinklers
M08042631-I1-EW-SP
04/19/2023
Filed — Alteration
Plumbing work on the 17th floor (Breaking Waves) as indicated on drawings. No change in use egress or occupancy.
M08042615-P1
03/21/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 263 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offSean Coakley P & H02/03/2026
DOB NOWStructuralSigned-offDBJ Contracting08/11/2025
DOB NOWGeneral ConstructionSigned-offDBJ Contracting05/29/2025
DOB NOWSuspended ScaffoldSigned-offTribute Restoration03/13/2025
DOB NOWSupported ScaffoldSigned-offTribute Restoration10/02/2024
DOB NOWGeneral ConstructionSigned-offTribute Restoration09/24/2024
DOB NOWGeneral ConstructionSigned-offTribute Restoration08/28/2024
DOB NOWSidewalk ShedSigned-offLemx07/29/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/22/2024
DOB NOWGeneral ConstructionSigned-offTribute Restoration08/10/2023
DOB NOWSupported ScaffoldSigned-offTribute Restoration07/21/2023
DOB NOWSprinklersSigned-offAshlar Mechanical04/20/2023
DOB NOWMechanical SystemsSigned-offOmbrellino Construction02/15/2023
DOB NOWSprinklersSigned-offAshlar Mechanical02/09/2023
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/23/2023
DOB NOWGeneral ConstructionSigned-offOmbrellino Construction01/19/2023
DOB NOWPlumbingSigned-offHertler Nadile P & H01/11/2023
DOB NOWGeneral ConstructionSigned-offTribute Restoration08/08/2022
DOB NOWSupported ScaffoldSigned-offTribute Restoration07/20/2022
DOB NOWMechanical SystemsSigned-offNew York Plumbing-Heating02/14/2022
DOB NOWSprinklersSigned-offSean Coakley P & H01/28/2022
DOB NOWMechanical SystemsSigned-offCore Four Construction01/26/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/25/2022
DOB NOWPlumbingSigned-offSean Coakley P & H01/25/2022
DOB NOWGeneral ConstructionSigned-offCore Four Construction11/23/2021
DOB NOWGeneral ConstructionSigned-offCore Four Construction11/19/2021
DOB NOWSprinklersSigned-offSean Coakley P & H11/17/2021
DOB NOWMechanical SystemsSigned-offCore Four Construction11/15/2021
DOB NOWPlumbingSigned-offNew York Plumbing-Heating-Cooling10/26/2021
DOB NOWSprinklersSigned-offReal Plumbing08/23/2021
DOB NOWMechanical SystemsSigned-offCore Four Construction08/19/2021
DOB NOWGeneral ConstructionSigned-offCore Four Construction08/18/2021
DOB NOWPlumbingSigned-offMega Plumbing07/16/2021
DOB NOWGeneral ConstructionSigned-offCore Four Construction05/26/2021
DOB NOWMechanical SystemsSigned-offCore Four Construction12/04/2019
DOB NOWPlumbingSigned-offMega Plumbing11/26/2019
DOB NOWSprinklersSigned-offReal Plumbing11/26/2019
BISSPISSUEDMega Plumbing05/26/2023
BISSPISSUEDMega Plumbing05/26/2023
BISPLISSUEDMega Plumbing05/13/2022
+ 47 more permits on file
1 project · most recent 04/27/2022
FiledStatusContractorScope
04/27/2022——172 heads
1 project · most recent 04/27/2022
FiledStatusContractorScope
04/27/2022———
8 projects · most recent 09/08/2025
General Wiring
FiledStatusContractorScope
09/08/2025CompleteAllcom ElectricGeneral Wiring
07/30/2024CompleteRichard Neu—
04/19/2022CompleteMRD Electrical ServicesGeneral Wiring
04/13/2022CompleteEastern Electrical ConstructionGeneral Wiring
01/03/2022CompleteElpo Electrical Contg—
11/26/2019CompleteHub ElectricGeneral Wiring
09/25/2018CompleteHub ElectricGeneral Wiring
03/13/2018CompleteAllcom ElectricGeneral Wiring
1 project · most recent 08/22/2022
Steel Concrete Masonry
FiledStatusContractorScope
08/22/2022——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
03/26/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/03/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
04/24/2025FinalHENLIA CHENprogress
04/24/2025Structural Steel - High Strength BoltingHENLIA CHENspecial
04/24/2025Structural Steel - WeldingHENLIA CHENspecial
04/24/2025Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
04/24/2025MasonryHENLIA CHENspecial
04/24/2025Structural Steel - DetailsHENLIA CHENspecial
02/06/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
02/06/2023Post-installed AnchorsJACK GREENspecial
01/06/2023Electrical motors and elevatorsJACK GREENenergy_progress
11/18/2022HVAC-R and service water heating equipmentJACK GREENenergy_progress
11/18/2022Ventilation and air distribution systemJACK GREENenergy_progress
11/18/2022Shutoff dampersJACK GREENenergy_progress
11/18/2022Lighting controlsJACK GREENenergy_progress
11/18/2022HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/18/2022Interior lighting powerJACK GREENenergy_progress
11/18/2022Energy Code Compliance InspectionsJACK GREENprogress
11/18/2022FinalJACK GREENprogress
11/18/2022Mechanical SystemsJACK GREENspecial
11/18/2022Sprinkler SystemsJACK GREENspecial
11/18/2022Maintenance informationJACK GREENenergy_progress
11/18/2022HVAC-R and service water piping design and insulationJACK GREENenergy_progress
10/20/2022Maintenance informationPaul Collinsenergy_progress
10/20/2022Mechanical SystemsPaul Collinsspecial
10/20/2022Energy Code Compliance InspectionsPaul Collinsprogress
10/20/2022FinalPaul Collinsprogress
Latest 25 of 98.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Calvin KleinOfficeFloors 3, 6, 8, 9, Roof
Project M01313055 Alteration · LOC Issued · 01/13/2026
Project M00709326 Alteration · Filing Withdrawn · 04/27/2022
Project M00709332 Alteration · Filing Withdrawn · 04/27/2022
Project M00709341 Alteration · Filing Withdrawn · 04/27/2022
Project M00709350 Alteration · Filing Withdrawn · 04/27/2022
Project M00646015 Alteration · LOC Issued · 01/24/2022
Project M00646002 Alteration · LOC Issued · 01/20/2022
Project M00646010 Alteration · LOC Issued · 01/20/2022
Project M00623636 Alteration · LOC Issued · 11/17/2021
Project M00623645 Alteration · LOC Issued · 11/17/2021
Project M00624533 Alteration · LOC Issued · 11/10/2021
Project M00624567 Alteration · LOC Issued · 11/10/2021
Breaking WavesOfficeFloor 17
Project M08042589 Alteration · LOC Issued · 12/29/2022
Project M08042615 Alteration · LOC Issued · 12/22/2022
Project M08042631 Alteration · LOC Issued · 12/22/2022
Project M08042638 Alteration · LOC Issued · 12/22/2022
Raw BrandsIndustrial / WarehouseFloor 15
Project M00577917 Alteration · LOC Issued · 09/15/2021
Project M00577962 Alteration · LOC Issued · 09/15/2021
Project M00577985 Alteration · LOC Issued · 09/15/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,854 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch41
09/03/2026M00515145-I1Request digital key ↗
09/03/2026M00546455-P1Request digital key ↗
09/03/2026M00546455-P2Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/15/2026M01164957-I1Request digital key ↗
08/15/2026M00274545-I1Request digital key ↗
08/15/2026M00301023-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00255114-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00254895-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00255231-I1Request digital key ↗
▸Applications & Permits304
▸BISPLAN / WORK APPROVAL APPLICATION175
10/01/2025121697164Open ↗
08/08/2025121896868Open ↗
07/11/2025121697164Open ↗
Showing 3 of 175 on file for this type
▸BISWORK PERMIT APPLICATION129
05/30/2023122771278Open ↗
05/30/2023122657437Open ↗
05/20/2021122657428Open ↗
Showing 3 of 129 on file for this type
▸Seals & Professional Certifications466
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION216
11/21/2019123792645Open ↗
10/07/2019123507589Open ↗
10/07/2019123507589Open ↗
Showing 3 of 216 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST55
03/02/2022122771269Open ↗
11/21/2019123792645Open ↗
Showing 2 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature47
09/02/2026M00577917-I1Open ↗
09/02/2026M00577917-I1Open ↗
09/02/2026M08042589-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/05/2026M00274545-I1Open ↗
09/03/2026M00515145-I1Open ↗
09/03/2026M00546455-I1Open ↗
Showing 3 of 46 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT42
11/06/2020140967149Open ↗
11/21/2019123792645Open ↗
Showing 2 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/20/2026M00255231-I1Open ↗
09/20/2026M00255231-I1Open ↗
09/20/2026M00255231-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/06/2020140967149Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/06/2020140967149Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment169
▸BISSELF-CERT PLUMBING NOTICE42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE35
06/21/2019123437129Open ↗
Showing 1 of 35 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA27
10/14/2022122776601Open ↗
10/16/2020123030139Open ↗
Showing 2 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING21
10/01/2025121697164Open ↗
06/10/2022122771269Open ↗
Showing 2 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS12
07/08/2025121542580Open ↗
07/01/2025121542580Open ↗
03/06/2025120975757Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
07/08/2025121542580Open ↗
03/06/2025120975757Open ↗
07/05/2019123437129Open ↗
Showing 3 of 11 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT3
06/30/2025121542580Open ↗
03/31/2025122072265Open ↗
03/06/2025120975757Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
06/30/2025121542580Open ↗
03/31/2025122072265Open ↗
▸BISSPRINKLER SYSTEMS2
07/10/2025121896868Open ↗
03/31/2025122092467Open ↗
▸Safety & Tenant Protection41
▸DOB NOWHPD-1: Anti-Harassment Area Checklist36
09/03/2026M00515145-I1Open ↗
09/03/2026M00546455-P1Open ↗
09/03/2026M00546455-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWCertificate of No Harassment3
09/02/2026M00647388-I1Open ↗
09/02/2026M00647388-P1Open ↗
Showing 2 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
11/06/2020140967149Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
11/21/2019123792645Open ↗
▸Environmental & Asbestos138
▸BISASBESTOS: CERTIFICATION (DEP ACP5)64
11/06/2020140967149Open ↗
11/21/2019123792645Open ↗
Showing 2 of 64 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
09/03/2026M00515145-I1Open ↗
09/03/2026M00546455-P1Open ↗
09/03/2026M00546455-I1Open ↗
Showing 3 of 38 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/02/2026M00647388-I1Open ↗
09/02/2026M00647388-I1Open ↗
▸Energy Compliance119
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS56
11/21/2019123792645Open ↗
07/05/2019123437129Open ↗
Showing 2 of 56 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
06/30/2025121542580Open ↗
05/05/2022123348430Open ↗
04/25/2022123348430Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
06/30/2025121542580Open ↗
04/23/2025120952111Open ↗
04/09/2025140967149Open ↗
Showing 3 of 6 on file for this type
▸BISINTERIOR LIGHTING POWER4
06/30/2025121542580Open ↗
04/23/2025120952111Open ↗
03/31/2025122072265Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING CONTROLS4
06/30/2025121542580Open ↗
04/09/2025140967149Open ↗
03/31/2025122072265Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
04/23/2025120952111Open ↗
03/06/2025120975757Open ↗
10/11/2022122771269Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* HVAC INSULATION AND SEALING2
03/06/2025120975757Open ↗
10/11/2022122771269Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/09/2021122657428Open ↗
11/06/2020140967149Open ↗
▸BIS* DUCT LEAKAGE TESTING1
06/30/2025121542580Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/15/2025104742245Open ↗
02/25/2025120975757Open ↗
05/05/2022123348430Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)5
04/09/2025140967149Open ↗
03/31/2025122092467Open ↗
03/31/2025122072265Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISMECHANICAL SYSTEMS4
06/30/2025121542580Open ↗
03/31/2025122072265Open ↗
02/25/2025120975757Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs163
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST99
09/15/2025104742245Open ↗
09/04/2025122381840Open ↗
08/08/2025121896868Open ↗
Showing 3 of 99 on file for this type
▸BISADMINISTRATIVE OBJECTIONS35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL7
06/30/2025121542580Open ↗
04/23/2025120952111Open ↗
04/09/2025140967149Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER6
05/30/2023122771278Open ↗
05/30/2023122657437Open ↗
05/20/2021122657428Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership184
▸BISCOST AFFIDAVIT168
06/14/2023122771278Open ↗
05/05/2022123348430Open ↗
04/25/2022123348430Open ↗
Showing 3 of 168 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW316
09/15/2025104742245Open ↗
09/02/2025122381840Open ↗
06/30/2025121542580Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms164
▸BISEFILING COVER SHEET104
11/21/2019123792645Open ↗
Showing 1 of 104 on file for this type
▸BISBOROUGH INTAKE FORM34
05/20/2021122657428Open ↗
05/20/2021122771269Open ↗
04/10/2020123507589Open ↗
Showing 3 of 34 on file for this type
▸BISADDITIONAL INFORMATION24
06/24/2022122771269Open ↗
Showing 1 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/06/2020140967149Open ↗
Showing 1 of 2 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00770631-I1Open ↗
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type