← Back
BuildNYC
Two family frame
2050 71ST STREET
BROOKLYN · Bensonhurst · BIN 3158051
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R5Zoning
1,800 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 2,200 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof repair and fire restoration5p · 2 filings · 20 docs
Floor 2Roof repair and fire restoration19p · 2 filings · 20 docs
Floor 1Roof repair and fire restoration21p · 2 filings · 20 docs
CellarRoof repair and fire restoration20p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/04/2025$1.5M—Private party → Private party$844/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shahrish Shuvo Engineering504/11/2025
RA Design Engineering109/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dominion Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OZ ContractingGeneral Contractor707/08/2026
Power on ElectricElectrical103/22/2026
CJ Heating & MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Choi Engineering2264104/10/2025
Shahrish Shuvo Engineering8524212/11/2024
Building Lifecycle
All (42)Filed (6)Permit Issued (4)Signed Off (4)Violation (3)Inspection (2)Special Inspection (23)
08/11/2025
Signed off — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-I1
08/11/2025
Signed off — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-S2
07/29/2025
Signed off — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-S1
06/30/2025
Signed off — Alteration
Interior Precautionary shoring of fire damaged building as per plans. No change to use, egress or occupancy.
B01112496-I1
04/11/2025
Filed — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-P2
04/10/2025
Filed — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-P1
04/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
04/10/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
04/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
04/10/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
04/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
04/10/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
04/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
04/10/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
04/10/2025
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
04/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
04/10/2025
Special inspection requirement — Final
Shahrish Shuvo
04/10/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
04/10/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
02/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2025
Permit issued — Plumbing
B01130048-S1-PL
12/19/2024
Permit issued — General Construction
B01130048-S2-GC-CX
12/13/2024
Filed — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-S1
12/11/2024
Filed — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-S2
12/11/2024
Permit issued — Structural
B01130048-I1-GC-CX
12/04/2024
Filed — Alteration
Roof Repair Fire restoration of existing 2 family building including minor structural work. Interior/exterior restoration and Plumbing work to be filed subsequently. No change to use, egress or occupancy.
B01130048-I1
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
11/21/2024
Special inspection requirement — Structural Wood Frame
Shahrish Shuvo
11/21/2024
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
11/21/2024
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
11/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/21/2024
Special inspection requirement — Final
Shahrish Shuvo
10/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
10/03/2024
Permit issued — General Construction
B01112496-I1-GC
09/26/2024
Filed — Alteration
Interior Precautionary shoring of fire damaged building as per plans. No change to use, egress or occupancy.
B01112496-I1
09/17/2024
Special inspection requirement — Final
Ronald Ademaj
04/24/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCJ Heating & Mechanical02/06/2025
DOB NOWGeneral ConstructionSigned-offOZ Contracting12/19/2024
DOB NOWStructuralSigned-offOZ Contracting12/11/2024
DOB NOWGeneral ConstructionSigned-offOZ Contracting10/03/2024
2 projects · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025CompletePower on ElectricGeneral Wiring
07/08/2025CompletePower on Electric3 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/10/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
04/10/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
04/10/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
04/10/2025Interior lighting powerShahrish Shuvoenergy_progress
04/10/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
04/10/2025Fenestration air leakageShahrish Shuvoenergy_progress
04/10/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
04/10/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
04/10/2025Lighting in dwelling unitsShahrish Shuvoenergy_progress
04/10/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
04/10/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
04/10/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
04/10/2025FinalShahrish Shuvoprogress
04/10/2025Lighting controlsShahrish Shuvoenergy_progress
04/10/2025Fenestration areasShahrish Shuvoenergy_progress
11/21/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
11/21/2024Structural Wood FrameShahrish Shuvoprogress
11/21/2024Air barrier - visual inspectionShahrish Shuvoenergy_progress
11/21/2024Insulation placement and R valuesShahrish Shuvoenergy_progress
11/21/2024Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/21/2024FinalShahrish Shuvoprogress
10/21/2024Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
09/17/2024FinalRonald Ademajprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026B01112496-I1Request digital key ↗
08/23/2026B01130048-I1Request digital key ↗
08/23/2026B01130048-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B01112496-I1Open ↗
08/23/2026B01130048-S2Open ↗
08/23/2026B01130048-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/30/2026B01130048-S2Open ↗
08/30/2026B01130048-S2Open ↗
08/26/2026B01112496-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B01130048-S2Open ↗
08/24/2026B01130048-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01130048-S2Open ↗
08/23/2026B01130048-S1Open ↗
08/13/2026B01130048-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01130048-I1Open ↗