← Back
BuildNYC
Elevator apt, miscellaneous
2053 5TH AVENUE
MANHATTAN · BIN 1054128
💬 Discuss this project
1910Year Built
7Stories
D9Building Class
R7-2Zoning
29,841 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized19 Active Violations 17 unresolved · 2 paperwork only 3 likely answered ▸FISP: SAFE
Elevator apt, miscellaneous · Owner of record: NYC Housing Preservation and Development · 4,992 sf lot · 5.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Temporary pipe scaffold installation5p · 1 filing · 6 docs
CellarReplace low pressure boiler and oil burner2p · 1 filing · 8 docs
Site & exteriorHeavy duty sidewalk shed installation5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1407/08/2026
City of New York Damp/Til203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brad E. Cohen, PE101/28/2020
Haider Engineering, P.E112/27/2019
MCRB Service101/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Permit Services203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mark Contracting NYScaffold807/08/2026
Clarke FitzroyElectrical103/21/2026
F W Clarke Elect'l ContractingElectrical103/21/2026
Deltex Electrical Cont. IElectrical103/21/2026
J & Y Electric and Inter*Electrical103/22/2026
Stokes ElectricalElectrical103/21/2026
HI-Lights ElectricElectrical103/22/2026
Building Lifecycle
All (86)Filed (3)Permit Issued (6)Signed Off (2)Facade (FISP) (12)Violation (60)Special Inspection (3)
04/01/2024
Violation issued (HPD, closed)
A
01/31/2024
Cycle 9 facade report signed — SAFE
01/24/2024
Cycle 9 facade inspection completed
09/06/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00208341-I1
09/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF
M00009024-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, closed)
A
08/24/2022
Cycle 9 facade report submitted
02/15/2022
Violation issued (HPD, closed)
A
10/13/2021
Violation issued (ECB, closed)
Construction
09/30/2021
Violation issued (ECB, closed)
Construction
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
06/16/2020
Violation issued (ECB, closed)
Construction
03/12/2020
Permit issued — Supported Scaffold
M00208341-I1-SF
02/06/2020
Permit issued — Boiler Equipment
M00234534-I1-BE
01/28/2020
Filed — Alteration
REPLACE LOW PRESSURE BOILER AND OIL BURNER. NO CHANGE IN USE EGRESS, OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.
M00234534-I1
01/23/2020
Permit issued — Sidewalk Shed
M00009024-I1-SH
12/31/2019
Permit issued — Supported Scaffold
M00208341-I1-SF
12/27/2019
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00208341-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2019
Special inspection requirement — Maintenance information
Brad Cohen
09/24/2019
Special inspection requirement — HVAC and service water heating system controls
Brad Cohen
09/24/2019
Special inspection requirement — HVAC and service water heating equipment
Brad Cohen
07/25/2019
Violation issued (ECB, closed)
Elevators
05/09/2019
Violation issued (ECB, open)
Boilers
05/01/2019
Violation issued (ECB, open)
Boilers
04/28/2019
Cycle 8 facade report signed — SWARMP
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/20/2019
Cycle 8 facade report submitted
02/11/2019
Cycle 8 facade inspection completed
10/11/2018
Violation issued (ECB, closed)
Elevators
10/05/2018
Violation issued (HPD, closed)
I
07/06/2018
Permit issued — Sidewalk Shed
M00009024-I1-SH
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2018
Permit issued — Sidewalk Shed
M00009024-I1-SH
01/05/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF
M00009024-I1
11/29/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2017
Violation issued (ECB, closed)
Construction
05/15/2017
Violation issued (ECB, closed)
Construction
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2015
Violation issued (HPD, closed)
I
11/26/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/17/2013
Violation issued (ECB, closed)
Unknown
09/17/2013
Violation issued (ECB, closed)
Unknown
12/07/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/07/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/11/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
A
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
03/10/2010
Cycle 6 facade report submitted
03/10/2010
Cycle 6 facade report signed — SWARMP
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offMark Contracting NY03/12/2020
DOB NOWBoiler EquipmentPermit IssuedPacific Energy02/06/2020
DOB NOWSidewalk ShedSigned-offMark Contracting NY01/23/2020
DOB NOWSupported ScaffoldSigned-offMark Contracting NY12/31/2019
DOB NOWSidewalk ShedSigned-offMark Contracting NY07/06/2018
DOB NOWSidewalk ShedSigned-offMark Contracting NY01/08/2018
BISEQISSUEDShamas Construcion Co11/19/1998
BISOTISSUEDShamas Construcion Co11/19/1998
BISOTISSUEDDiscovery Elecator Co08/06/1996
13 projects · most recent 11/11/2024
General Wiring
FiledStatusContractorScope
11/11/2024Permit IssuedDeltex Electrical Cont. IGeneral Wiring
08/22/2023Permit IssuedDifazio Electric NYGeneral Wiring
02/07/2022CompleteAujla Electric—
07/19/2021CompleteAujla Electric—
02/04/2021CompleteJ & Y Electric and Inter*—
03/04/2020CompleteJ & Y Electric and Inter*General Wiring
01/09/2020Permit IssuedStar Electrical Contractors—
11/25/2019Permit IssuedDeltex Electrical Cont. IGeneral Wiring
11/02/2019CompleteHI-Lights Electric—
08/09/2018Permit IssuedDeltex Electrical Cont. IGeneral Wiring
06/11/2018Permit IssuedJamcob ElectricGeneral Wiring
02/20/2018CompleteJoseph Weinstein ElectricGeneral Wiring
01/05/2018Permit IssuedWCK Electric—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/24/2019Maintenance informationBrad Cohenenergy_progress
09/24/2019HVAC and service water heating system controls Brad Cohenenergy_progress
09/24/2019HVAC and service water heating equipment Brad Cohenenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00208341-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/06/2026M00009024-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026M00234534-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00234534-I1Open ↗
09/23/2026M00234534-I1Open ↗
09/23/2026M00234534-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/05/2026M00208341-I1Open ↗
09/05/2026M00234534-I1Open ↗
08/13/2026M00009024-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
09/05/2026M00208341-I1Open ↗
08/13/2026M00234534-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/05/2026M00234534-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/05/2026M00208341-I1Open ↗
08/13/2026M00234534-I1Open ↗
08/13/2026M00009024-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
09/05/2026M00208341-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
09/05/2026M00208341-I1Open ↗