← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
2055 MCGRAW AVENUE · Parkchester · BIN 2096658
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
2,199,075 sfGross Floor Area
2,719Units
Rent Stabilized963 Active Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Parkchester South Condominium Associates · 951,289 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInstallation of Suspended Scaffold for Facade Repairs And/orUnder Construction20p · 2 filings · 6 docs
BulkheadFacade restoration and leak repairsUnder Construction1p · 1 filing · 3 docs
Floor 715p · 1 filing · 9 docs
Floor 6Unit 6E15p · 1 filing · 9 docs
Floor 5
Floor 4
Floor 3
Floor 2Unit 2C, Unit 7A, Unit 7B +215p · 1 filing · 9 docs
Floor 1
Site & exteriorProposed heavy duty sidewalk shedUnder Construction19p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkchester South Condo1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus New York103/25/2026
Always Fast Services103/14/2026
Connolly Engineering107/05/2022
Syed Engineering102/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LemxScaffold309/22/2026
High Quality Electric ofElectrical103/21/2026
Two-Tone ContractingGeneral Contractor107/08/2026
Vinco BuildersGeneral Contractor107/08/2026
Kings Group NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rimkus New York9809103/25/2026
Connolly Engineering, PLL3427107/05/2022
Building Lifecycle
All (102)Filed (5)Permit Issued (7)Signed Off (2)Facade (FISP) (12)Violation (51)Objection (18)Special Inspection (7)
09/21/2026
Permit issued — Sidewalk Shed
X01367079-I1-SH
07/09/2026
Permit issued — Suspended Scaffold
X01383067-I1-SC
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
A
07/01/2026
Violation issued (HPD, open)
B
06/26/2026
Permit issued — Sidewalk Shed
X01367079-I1-SH
06/05/2026
Violation issued (HPD, closed)
C
06/05/2026
Violation issued (HPD, closed)
B
06/05/2026
Violation issued (HPD, closed)
B
05/20/2026
Permit issued — General Construction
X01323398-I1-GC
05/10/2026
Violation issued (HPD, closed)
B
04/13/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01383067-I1
04/12/2026
Violation issued (HPD, closed)
B
04/12/2026
Violation issued (HPD, closed)
C
04/12/2026
Violation issued (HPD, closed)
C
04/12/2026
Violation issued (HPD, closed)
B
04/08/2026
Objection raised — Scope
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection raised — Other
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection raised — Other
04/08/2026
Objection resolved — Addressed
03/25/2026
Filed — Alteration
FACADE RESTORATION AND LEAK REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01323398-I1
03/16/2026
Permit issued — Sidewalk Shed
X01367079-I1-SH
03/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01367079-I1
02/12/2026
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB IN APTS # 2C, #6E, #7A, #7B, #7C, #7D, #7E, #7F, #7G, #7H & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758148-I1
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SAFE
02/02/2023
Cycle 9 facade inspection completed
09/01/2022
Permit issued — Structural
X00758148-I1-ST
07/08/2022
Objection raised — Structural
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Structural
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Scope
07/08/2022
Objection resolved — Addressed
07/05/2022
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB IN APTS # 2C, #6E, #7A, #7B, #7C, #7D, #7E, #7F, #7G, #7H & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758148-I1
06/15/2022
Special inspection requirement — Post-installed Anchors
daniel connolly
06/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
06/15/2022
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
06/15/2022
Special inspection requirement — Structural Steel - Welding
daniel connolly
06/15/2022
Special inspection requirement — Structural Steel - Details
daniel connolly
06/15/2022
Special inspection requirement — Final
daniel connolly
02/11/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED
X00468447-I1
02/18/2021
Permit issued — Sidewalk Shed
X00468447-I1-SH
02/17/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED
X00468447-I1
02/10/2021
Special inspection requirement — Final
RAFI HAMID
08/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/09/2018
Violation issued (HPD, closed)
B
10/09/2018
Violation issued (HPD, closed)
B
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedLemx09/21/2026
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting07/09/2026
DOB NOWSidewalk ShedPermit IssuedLemx06/26/2026
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting05/20/2026
DOB NOWSidewalk ShedPermit IssuedLemx03/16/2026
DOB NOWStructuralSigned-offVinco Builders09/01/2022
DOB NOWSidewalk ShedSigned-offKings Group NY02/18/2021
BISOTISSUEDProto Restoration Construction04/08/2021
BISOTISSUEDB & A Restoration Contracting04/02/2014
BISOTISSUEDRomano Paving & Contracting02/07/2014
BISOTISSUEDRomano Paving & Contracting09/13/2013
BISOTISSUEDB & A Restoration Contracting08/19/2013
BISOTISSUEDB & A Restoration Contracting08/16/2013
BISOTISSUEDKings County Waterproofing11/03/2000
BISOTISSUEDPPC Construction11/08/1999
BISPLISSUEDMedco Plumbing11/01/1999
2 projects · most recent 03/14/2026
FiledStatusContractorScope
03/14/2026Permit IssuedRichard Neu—
02/25/2021Permit IssuedHigh Quality Electric of—
1 project · most recent 03/14/2026
Sidewalk Shed
FiledStatusContractorScope
03/14/2026Permit IssuedLemxSidewalk Shed
1 project · most recent 04/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/13/2026Permit IssuedTwo-Tone ContractingSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/15/2022Post-installed Anchorsdaniel connollyspecial
06/15/2022Structural Stability – Alterations of existing buildingsdaniel connollyspecial
06/15/2022Structural Steel - High Strength Boltingdaniel connollyspecial
06/15/2022Structural Steel - Weldingdaniel connollyspecial
06/15/2022Structural Steel - Detailsdaniel connollyspecial
06/15/2022Finaldaniel connollyprogress
02/10/2021FinalRAFI HAMIDprogress
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/24/2026X00758148-I1Request digital key ↗
08/17/2026X01367079-I1Request digital key ↗
08/17/2026X01323398-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00468447-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION6
04/08/2021240298192Open ↗
04/04/2014220328973Open ↗
02/11/2014220328973Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
01/07/2021240298192Open ↗
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
Showing 3 of 4 on file for this type
▸BISAPPROVED SIDEWALK SHED & SCAFFOLD APPLICATION1
04/06/2021240298192Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/07/2021240298192Open ↗
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/02/2018220328973Open ↗
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/25/2026X00758148-I1Open ↗
08/25/2026X00758148-I1Open ↗
08/25/2026X00758148-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026X01367079-I1Open ↗
08/17/2026X01323398-I1Open ↗
08/13/2026X00758148-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X00758148-I1Open ↗
08/24/2026X00468447-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/07/2021240298192Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/06/2013220328973Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/07/2021240298192Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/06/2013220328973Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
04/06/2021240298192Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01323398-I1Open ↗
08/13/2026X00758148-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/08/2021240298192Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/02/2018220328973Open ↗
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/06/2021240298192Open ↗
01/07/2021240298192Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/02/2018220328973Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/07/2021240298192Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/20/2023240298192Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/20/2023240298192Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/20/2023240298192Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/20/2023240298192Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/06/2021240298192Open ↗
01/07/2021240298192Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/24/2023240298192Open ↗
02/14/2018220328973Open ↗
02/05/2018220328973Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/14/2013220328973Open ↗
▸BISFINAL1
01/20/2023240298192Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
02/17/2021240298192Open ↗
02/02/2018220328973Open ↗
02/26/2014220359127Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/20/2023240298192Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
08/06/2013220328973Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/07/2021240298192Open ↗
▸BISBOROUGH INTAKE FORM1
02/02/2018220328973Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026X01383067-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01383067-I1Open ↗