← Back
Primarily 2 family with 1 store or office
2055 UTICA AVENUE
BROOKLYN · Flatlands · BIN 3218586
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R3-2Zoning
2,320 sfGross Floor Area
3Units
Rent Stabilized34 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 2055 UTICA AVENUE LLC · 2,000 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2055 UTICA AVENUE LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAURIA ASSOCIATES208/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICKFAST403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN HERRICKElectrical103/21/2026
RICKETTS, JOSEPHElectrical103/21/2026
BIG APPLE SEWER & DRAIN IPlumbing107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (74)Filed (2)Permit Issued (2)Violation (60)Inspection (10)
04/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/10/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Violation issued (HPD, closed)
I
11/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/14/2025
Permit issued — Plumbing
B00719547-I1-PL
10/17/2024
Violation issued (ECB, closed)
Boilers
10/17/2024
Violation issued (ECB, closed)
Boilers
09/27/2024
Violation issued (ECB, closed)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2023
Violation issued (HPD, closed)
I
08/17/2023
Filed — Alteration
PLUMBING WORK TO CAP & REMOVE (2) GAS METERS, (2) HOT WATER HEATERS, (2) GAS FIRED BOILERS AT CELLAR, (1)GAS RANGE AT THE FIRST FLOOR & (1) GAS RANGE AT THE SECOND FLOOR AT EXISTING 2-STORY BUILDING.
B00719547-P1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2023
Violation issued (HPD, closed)
A
07/07/2022
Permit issued — Plumbing
B00719547-I1-PL
05/12/2022
Filed — Alteration
PLUMBING WORK TO CAP & REMOVE (2) GAS METERS, (2) HOT WATER HEATERS, (2) GAS FIRED BOILERS AT CELLAR, (1)GAS RANGE AT THE FIRST FLOOR & (1) GAS RANGE AT THE SECOND FLOOR AT EXISTING 2-STORY BUILDING.
B00719547-I1
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
06/04/2016
Violation issued (HPD, closed)
B
06/04/2016
Violation issued (HPD, closed)
C
06/04/2016
Violation issued (HPD, closed)
B
06/04/2016
Violation issued (HPD, closed)
B
06/04/2016
Violation issued (HPD, closed)
B
06/04/2016
Violation issued (HPD, closed)
B
06/04/2016
Violation issued (HPD, closed)
A
06/04/2016
Violation issued (HPD, closed)
B
06/04/2016
Violation issued (HPD, open)
A
06/04/2016
Violation issued (HPD, open)
A
06/04/2016
Violation issued (HPD, open)
A
10/14/2015
Violation issued (HPD, closed)
I
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/13/2011
Violation issued (ECB, closed)
Construction
04/13/2011
Violation issued (ECB, closed)
Unknown
04/07/2011
Violation issued (ECB, closed)
Unknown
04/07/2011
Violation issued (ECB, closed)
Unknown
03/09/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBIG APPLE SEWER & DRAIN I05/14/2025
DOB NOWPlumbingPermit IssuedDPH PLUMBING & HTG CORP07/07/2022
BIS—ISSUEDPAUL SIGNS, INC12/02/2011
BISPLISSUEDZARA PLUMBING CORP04/07/2005
BISBLISSUEDZARA PLUMBING CORP04/07/2005
1 project · most recent 08/17/2023
Gas
FiledStatusContractorScope
08/17/2023Permit IssuedBIG APPLE SEWER & DRAIN IGas
1 project · most recent 08/28/2018
FiledStatusContractorScope
08/28/2018Permit IssuedACCURATE ELEC'L CORP.5 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2026Pass-Final PL - UndergroundPassView ↗
02/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00719547-P1Request digital key ↗
08/27/2026B00719547-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
12/01/2020301764348Open ↗
10/27/2011320350384Open ↗
09/16/2011320350384Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
12/03/2011320350384Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00719547-P1Open ↗
08/27/2026B00719547-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/16/2011320356208Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
09/16/2011320350384Open ↗
09/16/2011320356208Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/16/2011320350384Open ↗
09/16/2011320356208Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
09/16/2011320356208Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
09/16/2011320350384Open ↗
09/16/2011320356208Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
02/09/2012320350384Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/09/2012320350384Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/09/2012320350384Open ↗
09/16/2011320350384Open ↗
09/16/2011320356208Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/16/2011320350384Open ↗
09/16/2011320356208Open ↗