← Back
BuildNYC
Two family frame
2056 STORY AVENUE
BRONX · Castle Hill-Unionport · BIN 2022752
💬 Discuss this project
1950Year Built
1Stories
B2Building Class
R4Zoning
2,262 sfGross Floor Area
2Units
Rent Stabilized8 Active Violations ▸
Two family frame · 5,150 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Plumbing workUnder Construction2p · 1 filing · 6 docs
Site & exteriorPlumbing workUnder Construction2p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/22/2017$600K—Private party → DAZAR ENTERPRISES II LLC$265/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P Georgopoulos Architect106/18/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Flint MechanicalPlumbing307/08/2026
Venture Home SolarElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P Georgopoulos Architect889106/18/2024
Building Lifecycle
05/27/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
05/21/2026
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 1, 1st…
HPD violation · open
05/21/2026
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 1, 1st…
HPD violation · open
05/21/2026
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULK AROUND CABINET GAP AND SOUTH WALL IN THE KITCHEN LOCATED…
HPD violation · open
05/21/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OUTLET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT…
HPD violation · open
25 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFlint Mechanical01/05/2026
DOB NOWPlumbingPermit IssuedFlint Mechanical01/31/2025
DOB NOWPlumbingPermit IssuedFlint Mechanical07/11/2024
BISOTISSUEDVenture Home Solar02/02/2018
1 project · most recent 02/02/2018
General Wiring
FiledStatusContractorScope
02/02/2018CompleteVenture Home SolarGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/27/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/18/2024Fire-Resistant Penetrations and JointsVasilios Georgopoulosspecial
06/18/2024Energy Code Compliance InspectionsVasilios Georgopoulosprogress
06/18/2024HVAC-R and service water heating system controlsVasilios Georgopoulosenergy_progress
06/18/2024HVAC-R and service water piping design and insulationVasilios Georgopoulosenergy_progress
06/18/2024HVAC-R and service water heating equipmentVasilios Georgopoulosenergy_progress
06/18/2024Maintenance informationVasilios Georgopoulosenergy_progress
31 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account