← Back
BuildNYC
Two family converted from one family
206-41 46TH AVENUE
QUEENS · Bayside · BIN 4156747
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R3-1Zoning
1,300 sfGross Floor Area
2Units
1 Active Violation ▸FDNY Report ↗
Two family converted from one family · 2,600 sf lot · 0.5 FAR built
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issued12p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stellar Rise Holdings210/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2026$1.0M—Private party → Stellar Rise Holdings$749/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mei Architect109/18/2026
Mehdi Ghazi108/28/2026
Building Lifecycle
All (31)Filed (2)Violation (4)Objection (1)Special Inspection (24)
10/09/2026
Objection raised — Other
09/18/2026
Filed — New Building
PROPOSE A NEW 2-STORY 2-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01457846-I1
09/16/2026
Special inspection requirement — Ventilation and air distribution system
09/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/16/2026
Special inspection requirement — Heating Systems
09/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/16/2026
Special inspection requirement — Energy Code Compliance Inspections
09/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/16/2026
Special inspection requirement — Interior lighting power
09/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
09/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/16/2026
Special inspection requirement — Air barrier — testing
09/16/2026
Special inspection requirement — Fenestration air leakage
09/16/2026
Special inspection requirement — Maintenance information
09/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/16/2026
Special inspection requirement — Air barrier - visual inspection
09/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/16/2026
Special inspection requirement — Metering
09/16/2026
Special inspection requirement — Fenestration areas
09/16/2026
Special inspection requirement — Insulation placement and R values
09/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/16/2026
Special inspection requirement — Permanent certificate
09/16/2026
Special inspection requirement — Protection of exposed foundation insulation
09/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
09/09/2026
Special inspection requirement — Final
09/09/2026
Special inspection requirement — Mechanical Systems
08/28/2026
Filed — Full Demolition
Q01444446-I1
11/06/2009
Violation issued (ECB, closed)
Construction
06/04/2009
Violation issued (ECB, open)
Construction
06/06/2003
Violation issued (ECB, closed)
Quality of Life
06/06/2003
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDGreen Street Power Partners06/07/2016
1 project · most recent 09/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NLHZ 36,000 BTU · Heat Pump Outdoor ×2
MXZ-SM60NLHZ 60,000 BTU · Heat Pump Outdoor ×1
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
09/16/2026Ventilation and air distribution system—energy_progress
09/16/2026Fire-Resistant Penetrations and Joints—special
09/16/2026Heating Systems—special
09/16/2026Subsurface Investigations (Borings/Test Pits)—special
09/16/2026Energy Code Compliance Inspections—progress
09/16/2026Fire-Resistance Rated Construction—progress
09/16/2026Interior lighting power—energy_progress
09/16/2026Electric vehicle service equipment requirements—energy_progress
09/16/2026HVAC-R and service water heating system controls—energy_progress
09/16/2026Air barrier — testing —energy_progress
09/16/2026Fenestration air leakage—energy_progress
09/16/2026Maintenance information—energy_progress
09/16/2026HVAC-R and service water piping design and insulation—energy_progress
09/16/2026Air barrier - visual inspection—energy_progress
09/16/2026Fenestration and door U-factor and product ratings—energy_progress
09/16/2026Metering—energy_progress
09/16/2026Fenestration areas—energy_progress
09/16/2026Insulation placement and R values—energy_progress
09/16/2026HVAC-R and service water heating equipment—energy_progress
09/16/2026Permanent certificate—energy_progress
09/16/2026Protection of exposed foundation insulation—energy_progress
09/16/2026Duct leakage testing, insulation and design—energy_progress
09/09/2026Final—progress
09/09/2026Mechanical Systems—special
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
10/13/2026Q01444446-I1Request digital key ↗
10/04/2026Q01457846-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/06/2016440316025Open ↗
▸BISWORK PERMIT APPLICATION1
06/06/2016440316025Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
10/04/2026Q01457846-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
10/04/2026Q01457846-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
10/13/2026Q01444446-I1Open ↗
10/04/2026Q01457846-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/06/2016440316025Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/06/2016440316025Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/06/2016440316025Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
06/06/2016440316025Open ↗
▸DOB NOWStreet Tree Checklist1
10/04/2026Q01457846-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/06/2016440316025Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/06/2016440316025Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/06/2016440316025Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/06/2016440316025Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/06/2016440316025Open ↗
▸DOB NOWSOIL REPORT1
10/04/2026Q01457846-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/06/2016440316025Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/06/2016440316025Open ↗
▸Other Documents7
▸BISFEE EXEMPTION DOCUMENTATION2
06/06/2016440316025Open ↗
06/06/2016440316025Open ↗
▸DOB NOWProperty Ownership Certification2
10/13/2026Q01444446-I1Open ↗
10/04/2026Q01457846-I1Open ↗
▸DOB NOWStructure Photographs1
10/13/2026Q01444446-I1Open ↗
▸DOB NOWSite Survey: Initial1
10/04/2026Q01457846-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
10/04/2026Q01457846-I1Open ↗