← Back
One story retail building
206 BEACH 116 STREET
QUEENS · BIN 4303732
💬 Discuss this project
1929Year Built
1Stories
K1Building Class
R5BZoning
6,500 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: MAKAI 116, LLC · 8,183 sf lot · 0.79 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 11p · 1 filing · 8 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HURON MANAGEMENT403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2014$1.7M—— → —$265/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAURIA ASSOCIATES201/26/2024
KEMS ENGINEERING AND CONSTRUCTION608/18/2021
JDJ ENGINEERING, DPC205/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICKFAST403/21/2026
LEWSAN CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TIP TOP CONTRACTORS INCGeneral Contractor407/08/2026
FIRST CHOICE MECHANICALGeneral Contractor107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAURIA ASSOCIATES7570201/26/2024
GREGORY V. PEROTTO, P.E.947608/18/2021
JDJ ENGINEERING, D.P.C.6780205/10/2021
Building Lifecycle
All (52)Filed (10)Permit Issued (5)Signed Off (4)Violation (4)Inspection (2)Special Inspection (27)
06/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
01/26/2024
Filed — Alteration
Q00951226-P1
01/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
12/04/2023
Permit issued — Plumbing
Q00951226-I1-PL
11/08/2023
Filed — Alteration
Q00951226-I1
03/22/2023
Violation issued (FDNY_NOV, closed)
11/03/2021
Signed off — Alteration
New gas piping throughout building and plumbing fixtures.
Q00491561-I1
11/03/2021
Signed off — Alteration
New interior non-load bearing partitions and storefront entrance.
Q00499565-I1
10/29/2021
Signed off — Alteration
Proposed kitchen hood and associated exhaust/make-up air fans and one (1) new HVAC unit.
Q00499571-I1
08/18/2021
Filed — Alteration
New gas piping throughout building and plumbing fixtures.
Q00491561-P3
08/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/12/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
07/28/2021
Filed — Alteration
New gas piping throughout building and plumbing fixtures.
Q00491561-P2
07/21/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
07/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
06/15/2021
Violation issued (FDNY_NOV, closed)
05/20/2021
Filed — Alteration
New gas piping throughout building and plumbing fixtures.
Q00491561-P1
05/11/2021
Signed off — Alteration
TO FURNISH AND INSTALL NEW HVAC VRF EQUIPMENT. (2)-4 TON HEAT PUMP UNITS. (1)-2 TON HEAT PUMP UNITS AND (9)-CEILING HUNG CASSETTES AHUS AS PER PLANS. PARTIAL REMOVAL OF EXISTING DUCTWORK AS REQUIRED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY IN THIS FILING.
Q00366740-I1
05/10/2021
Filed — Alteration
TO FURNISH AND INSTALL NEW HVAC VRF EQUIPMENT. (2)-4 TON HEAT PUMP UNITS. (1)-2 TON HEAT PUMP UNITS AND (9)-CEILING HUNG CASSETTES AHUS AS PER PLANS. PARTIAL REMOVAL OF EXISTING DUCTWORK AS REQUIRED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY IN THIS FILING.
Q00366740-P1
05/10/2021
Special inspection requirement — Maintenance information
Jonathan Johrden
05/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Johrden
05/10/2021
Special inspection requirement — Final
Jonathan Johrden
05/10/2021
Special inspection requirement — HVAC insulation and sealing
Jonathan Johrden
05/10/2021
Special inspection requirement — HVAC and service water heating equipment
Jonathan Johrden
05/10/2021
Special inspection requirement — HVAC and service water heating system controls
Jonathan Johrden
05/10/2021
Special inspection requirement — Mechanical Systems
Jonathan Johrden
05/08/2021
Special inspection requirement — HVAC insulation and sealing
Jonathan Johrden
05/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Johrden
05/08/2021
Special inspection requirement — Mechanical Systems
Jonathan Johrden
05/08/2021
Special inspection requirement — Final
Jonathan Johrden
05/08/2021
Special inspection requirement — Maintenance information
Jonathan Johrden
05/08/2021
Special inspection requirement — HVAC and service water heating system controls
Jonathan Johrden
05/08/2021
Special inspection requirement — HVAC and service water heating equipment
Jonathan Johrden
05/04/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
04/27/2021
Permit issued — Mechanical Systems
Q00499571-I1-MS
04/27/2021
Permit issued — Plumbing
Q00491561-I1-PL
04/26/2021
Permit issued — General Construction
Q00499565-I1-GC
04/21/2021
Filed — Alteration
New gas piping throughout building and plumbing fixtures.
Q00491561-I1
04/21/2021
Filed — Alteration
New interior non-load bearing partitions and storefront entrance.
Q00499565-I1
04/21/2021
Filed — Alteration
Proposed kitchen hood and associated exhaust/make-up air fans and one (1) new HVAC unit.
Q00499571-I1
04/15/2021
Special inspection requirement — Fenestration areas
Steven Bendoraitis
04/15/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Bendoraitis
04/15/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
04/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
04/07/2021
Special inspection requirement — Final
Steven Bendoraitis
07/10/2020
Permit issued — Mechanical Systems
Q00366740-I1-MS
07/09/2020
Filed — Alteration
TO FURNISH AND INSTALL NEW HVAC VRF EQUIPMENT. (2)-4 TON HEAT PUMP UNITS. (1)-2 TON HEAT PUMP UNITS AND (9)-CEILING HUNG CASSETTES AHUS AS PER PLANS. PARTIAL REMOVAL OF EXISTING DUCTWORK AS REQUIRED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY IN THIS FILING.
Q00366740-I1
02/10/2009
Violation issued (ECB, closed)
Construction
01/16/1997
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR12/04/2023
DOB NOWMechanical SystemsSigned-offTIP TOP CONTRACTORS INC04/27/2021
DOB NOWPlumbingSigned-offDW PLUMBING INC04/27/2021
DOB NOWGeneral ConstructionSigned-offTIP TOP CONTRACTORS INC04/26/2021
DOB NOWMechanical SystemsSigned-offFIRST CHOICE MECHANICAL07/10/2020
BISPLISSUEDADRIANO PLMBG & HTG CORP02/02/2015
BISOTISSUEDAPPROVED GENERAL CONTRACTING01/13/2015
BISFPISSUEDUNIQUE FIRE SYSTEMS INC09/02/2009
BISPLISSUEDTEC PLUMBING CORP02/26/2009
BISMHISSUEDPMK II INC02/20/2009
BISEQISSUEDPMK II INC02/19/2009
BISPLISSUEDPHASE 1 GROUP INC12/12/1994
BISEQISSUEDNU-TECH LAUNDRIES INC11/02/1994
BISOTISSUEDNU-TECH LAUNDRIES INC11/02/1994
2 projects · most recent 12/19/2024
General Wiring
FiledStatusContractorScope
12/19/2024CompleteAMC ELEC'L SERVICES, INC.General Wiring
02/20/2019CompletePAPPAS & FODERA ELECT'L1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
02/05/2024Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
01/22/2024Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
08/12/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
08/12/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
07/21/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
07/21/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
05/10/2021Maintenance informationJonathan Johrdenenergy_progress
05/10/2021Fire-Resistant Penetrations and JointsJonathan Johrdenspecial
05/10/2021FinalJonathan Johrdenprogress
05/10/2021HVAC insulation and sealing Jonathan Johrdenenergy_progress
05/10/2021HVAC and service water heating equipment Jonathan Johrdenenergy_progress
05/10/2021HVAC and service water heating system controls Jonathan Johrdenenergy_progress
05/10/2021Mechanical SystemsJonathan Johrdenspecial
05/08/2021HVAC insulation and sealing Jonathan Johrdenenergy_progress
05/08/2021Fire-Resistant Penetrations and JointsJonathan Johrdenspecial
05/08/2021Mechanical SystemsJonathan Johrdenspecial
05/08/2021FinalJonathan Johrdenprogress
05/08/2021Maintenance informationJonathan Johrdenenergy_progress
05/08/2021HVAC and service water heating system controls Jonathan Johrdenenergy_progress
05/08/2021HVAC and service water heating equipment Jonathan Johrdenenergy_progress
05/04/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
05/04/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
04/15/2021Fenestration areasSteven Bendoraitisenergy_progress
04/15/2021Fenestration and door U-factor and product ratingsSteven Bendoraitisenergy_progress
04/15/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
Latest 25 of 27.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/27/2026Q00499565-I1Request digital key ↗
08/27/2026Q00499571-I1Request digital key ↗
08/27/2026Q00491561-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00366740-I1Request digital key ↗
08/15/2026Q00366740-P1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
11/13/2014421001695Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
01/26/2015421001695Open ↗
09/02/2009420004621Open ↗
02/27/2009410174449Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
04/25/2015421001695Open ↗
12/02/2009410174449Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM1
11/14/2014421001695Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
02/06/2019440534227Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature17
09/27/2026Q00491561-P2Open ↗
09/23/2026Q00366740-I1Open ↗
08/29/2026Q00366740-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/27/2026Q00491561-P2Open ↗
09/23/2026Q00366740-I1Open ↗
09/23/2026Q00366740-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00366740-I1Open ↗
08/27/2026Q00499565-I1Open ↗
08/27/2026Q00499571-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/25/2015440181517Open ↗
07/11/2014421001695Open ↗
02/20/2009410174449Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
12/02/2014440181517Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE6
04/14/2015440181517Open ↗
11/16/2009410174449Open ↗
11/10/2009410174449Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/02/2014440181517Open ↗
10/29/2009410174449Open ↗
09/18/2009410174449Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS1
12/02/2009410174449Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/02/2009410174449Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
02/06/2019440534227Open ↗
07/11/2014421001695Open ↗
10/07/2008410174449Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/11/2014421001695Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
02/06/2019440534227Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026Q00366740-I1Open ↗
08/27/2026Q00499565-I1Open ↗
08/27/2026Q00499571-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/07/2008410174449Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/09/2009420004621Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/25/2015421001695Open ↗
04/25/2015440181517Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/25/2015440181517Open ↗
07/11/2014421001695Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00499571-I1Open ↗
08/13/2026Q00499565-I1Open ↗
▸BISNYCECC ANALYSIS1
02/06/2019440534227Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/06/2019440534227Open ↗
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
Showing 3 of 4 on file for this type
▸BIS2008 CODE TR1 REQUIRED1
12/02/2014440181517Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/25/2015421001695Open ↗
04/25/2015440181517Open ↗
01/23/2014420004621Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/11/2014421001695Open ↗
04/09/2009420004621Open ↗
10/07/2008410174449Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/25/2015440181517Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
02/06/2019440534227Open ↗
04/25/2015421001695Open ↗
04/25/2015440181517Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/26/2015421001695Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION7
02/06/2019440534227Open ↗
04/25/2015440181517Open ↗
01/02/2015421001695Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
07/11/2014421001695Open ↗
04/09/2009420004621Open ↗
10/07/2008410174449Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/06/2019440534227Open ↗
12/02/2014440181517Open ↗
▸Other Documents3
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
01/23/2014420004621Open ↗
11/16/2009410174449Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
02/06/2019440534227Open ↗