1850Year Built
4Stories
C6Building Class
R7BZoning
5,336 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Walk-up cooperative · Owner of record: 206 EAST 18TH STREET OWNERS CORP · 2,116 sf lot · 2.52 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 2 filings · 17 docs
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY707/08/2026
206 EAST 18 ST OWNERS303/22/2026
206 E 18TH ST OWNERS CORP103/22/2026
206 E 18 ST OWNER'S CORP103/22/2026
206 E 18TH OWNERS303/21/2026
206 EAST 18TH STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP206/02/2025
SW ENGINEERING COMPANY104/04/2025
JOSHUA BRANDFONBRENER ARCHITECT510/04/2022
JWM GROUP LLC204/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW CLASSIC RESTORATION LGeneral Contractor2107/08/2026
PEAQ RESTORATION LLCGeneral Contractor203/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
SERGIO GIANNACHIElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
WF PLUMBING AND HEATING LPlumbing107/08/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL ENGINEERING INSPECTIO6912104/04/2025
BEYOND ARCH LLC3600510/04/2022
JWM GROUP, LLC3550204/22/2022
Building Lifecycle
All (81)Filed (10)Permit Issued (15)Signed Off (6)Violation (10)Inspection (4)Objection (14)Special Inspection (22)
03/30/2026
Signed off — Alteration
GENERAL CONSTRUCTION FOR EXTERIOR REPAIRS AT NORTH AND PARTIAL WEST ELEVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190381-I1
01/08/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01222630-I1
06/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01222630-P1
05/13/2025
Permit issued — General Construction
M01190381-I1-GC
05/12/2025
Permit issued — Sidewalk Shed
M01222630-I1-SH
05/12/2025
Permit issued — Supported Scaffold
M01222630-I1-SF
05/09/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01222630-I1
04/04/2025
Filed — Alteration
GENERAL CONSTRUCTION FOR EXTERIOR REPAIRS AT NORTH AND PARTIAL WEST ELEVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190381-I1
03/05/2025
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
03/05/2025
Special inspection requirement — Final
Joshua Luckritz
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
10/11/2023
Signed off — Alteration
INTERIOR RENOVATION TO EXISTING COMBINED UNITS (UNITS 1 & 2 - 1ST FLR). AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. (DIR. 14)
M00664763-I1
09/01/2023
Signed off — Alteration
Filed herein modifications to ST as per plans
M00664988-I1
07/19/2023
Signed off — Alteration
Filed herein installation & modifications to plumbing fixtures and gas range to existing condo apartment. No change in use, egress, or occupancy under this application.
M00665109-I1
07/05/2023
Permit issued — General Construction
M00664763-I1-GC
06/30/2023
Violation issued (ECB, closed)
Unknown
06/29/2023
Permit issued — General Construction
M00664763-I1-GC
06/26/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2023
Signed off — Alteration
M00665073-I1
05/18/2023
Permit issued — General Construction
M00664763-I1-GC
05/18/2023
Permit issued — Structural
M00664988-I1-GC-CX
05/18/2023
Permit issued — Mechanical Systems
M00665073-I1-MS
03/15/2023
Violation issued (HPD, closed)
A
10/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2022
Objection resolved — Addressed
10/06/2022
Objection raised — Scope
10/04/2022
Filed — Alteration
INTERIOR RENOVATION TO EXISTING COMBINED UNITS (UNITS 1 & 2 - 1ST FLR). AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. (DIR. 14)
M00664763-P1
10/04/2022
Filed — Alteration
Filed herein installation & modifications to plumbing fixtures and gas range to existing condo apartment. No change in use, egress, or occupancy under this application.
M00665109-P1
09/26/2022
Special inspection requirement — Energy Code Compliance Inspections
josh brandfonbrener
09/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
09/26/2022
Special inspection requirement — Fire-Resistance Rated Construction
josh brandfonbrener
09/26/2022
Special inspection requirement — Final
josh brandfonbrener
05/24/2022
Permit issued — Mechanical Systems
M00665073-I1-MS
05/24/2022
Permit issued — General Construction
M00664988-I1-GC-CX
05/20/2022
Permit issued — General Construction
M00664763-I1-GC
04/25/2022
Permit issued — General Construction
M00664988-I1-GC-CX
04/25/2022
Special inspection requirement — Final
JERRY MISIEWICZ
04/25/2022
Special inspection requirement — Structural Steel - Welding
Hackjong Choi
04/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JERRY MISIEWICZ
04/25/2022
Special inspection requirement — Concrete - Cast-In-Place
JERRY MISIEWICZ
04/25/2022
Special inspection requirement — Structural Steel - High Strength Bolting
JERRY MISIEWICZ
04/25/2022
Special inspection requirement — Structural Steel - Details
JERRY MISIEWICZ
04/22/2022
Filed — Alteration
Filed herein modifications to ST as per plans
M00664988-P1
04/21/2022
Special inspection requirement — Structural Steel - Details
JERRY MISIEWICZ
04/21/2022
Special inspection requirement — Structural Steel - High Strength Bolting
JERRY MISIEWICZ
04/21/2022
Special inspection requirement — Structural Steel - Welding
Hackjong Choi
04/21/2022
Special inspection requirement — Final
JERRY MISIEWICZ
04/21/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JERRY MISIEWICZ
04/21/2022
Special inspection requirement — Concrete - Cast-In-Place
JERRY MISIEWICZ
04/04/2022
Permit issued — Plumbing
M00665109-I1-PL
04/02/2022
Permit issued — Mechanical Systems
M00665073-I1-MS
04/01/2022
Permit issued — General Construction
M00664763-I1-GC
03/04/2022
Objection raised — Inspections
03/04/2022
Objection resolved — Addressed
03/04/2022
Objection raised — Admin
03/04/2022
Objection resolved — Addressed
03/04/2022
Objection raised — Admin
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPEAQ RESTORATION LLC05/13/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/12/2025
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/12/2025
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L07/05/2023
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L06/29/2023
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L05/18/2023
DOB NOWStructuralSigned-offNEW CLASSIC RESTORATION L05/18/2023
DOB NOWMechanical SystemsSigned-offNEW CLASSIC RESTORATION L05/18/2023
DOB NOWMechanical SystemsSigned-offNEW CLASSIC RESTORATION L05/24/2022
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L05/24/2022
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L05/20/2022
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L04/25/2022
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L04/04/2022
DOB NOWMechanical SystemsSigned-offNEW CLASSIC RESTORATION L04/02/2022
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L04/01/2022
BISPLISSUEDAQUEDUCT PLBG & MECH. COR10/05/2012
BISMHISSUEDALPHACRAFT CONSTRUCTION I08/21/2012
BISOTISSUEDPRODEKO CORP01/12/2009
BISPLISSUEDJOSEPH O. FERRARA & SONS01/07/2009
BISOTISSUEDPRODEKO CORP11/05/2008
BISOTISSUEDATLAS WELDING & BOILER REPAIR07/24/2007
BISPLISSUEDCASA MECHANICAL CO. INC06/11/2007
BISEQISSUEDWOLF INSTSALLATIONS INC.09/20/2005
BIS—ISSUEDMALLIOS BROTHERS CONTRATING CORP08/20/1990
2 projects · most recent 05/12/2025
General Wiring
FiledStatusContractorScope
05/12/2025CompleteRICHARD NEU—
05/30/2022CompleteLENLITE ELEC'L CONTR'S INGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/05/2025Post-installed AnchorsJOSHUA LUCKRITZspecial
03/05/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
03/05/2025FinalJoshua Luckritzprogress
03/05/2025Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
09/26/2022Energy Code Compliance Inspectionsjosh brandfonbrenerprogress
09/26/2022Fire-Resistant Penetrations and JointsHackjong Choispecial
09/26/2022Fire-Resistance Rated Constructionjosh brandfonbrenerprogress
09/26/2022Finaljosh brandfonbrenerprogress
04/25/2022FinalJERRY MISIEWICZprogress
04/25/2022Structural Steel - WeldingHackjong Choispecial
04/25/2022Structural Stability – Alterations of existing buildingsJERRY MISIEWICZspecial
04/25/2022Concrete - Cast-In-PlaceJERRY MISIEWICZspecial
04/25/2022Structural Steel - High Strength BoltingJERRY MISIEWICZspecial
04/25/2022Structural Steel - DetailsJERRY MISIEWICZspecial
04/21/2022Structural Steel - DetailsJERRY MISIEWICZspecial
04/21/2022Structural Steel - High Strength BoltingJERRY MISIEWICZspecial
04/21/2022Structural Steel - WeldingHackjong Choispecial
04/21/2022FinalJERRY MISIEWICZprogress
04/21/2022Structural Stability – Alterations of existing buildingsJERRY MISIEWICZspecial
04/21/2022Concrete - Cast-In-PlaceJERRY MISIEWICZspecial
01/19/2022Mechanical SystemsHackjong Choispecial
01/19/2022Finaljosh brandfonbrenerprogress
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/02/2026M00665109-P1Request digital key ↗
09/02/2026M00665109-I1Request digital key ↗
09/02/2026M00665073-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION6
10/09/2012121031533Open ↗
08/23/2012121031533Open ↗
08/23/2012121031533Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00664988-I1Open ↗
08/13/2026M00664988-P1Open ↗
08/13/2026M01190381-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
04/05/2012121031533Open ↗
08/26/2008110325826Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/12/2009110325826Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/10/2013121031533Open ↗
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature13
08/27/2026M00664988-P1Open ↗
08/27/2026M00664988-P1Open ↗
08/27/2026M00664988-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026M00665109-P1Open ↗
09/02/2026M00665109-I1Open ↗
09/02/2026M00664763-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
07/15/2013121031533Open ↗
07/15/2013121031533Open ↗
07/10/2013121031533Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026M00664988-P1Open ↗
08/25/2026M00664988-I1Open ↗
08/25/2026M00664763-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE5
05/07/2013121031533Open ↗
02/21/2013121031533Open ↗
11/05/2012121031533Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
04/05/2012121031533Open ↗
08/26/2008110325826Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/05/2012121031533Open ↗
08/26/2008110325826Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01190381-I1Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS2
07/15/2013121031533Open ↗
07/10/2013121031533Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/10/2013121031533Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/05/2012121031533Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/15/2013121031533Open ↗
07/10/2013121031533Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/05/2012121031533Open ↗
08/26/2008110325826Open ↗
▸BISLANDMARKS APPROVAL1
07/15/2013121031533Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
07/15/2013121031533Open ↗
04/05/2012121031533Open ↗
03/12/2009110325826Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/23/2012121031533Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
04/05/2012121031533Open ↗
08/26/2008110325826Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00664763-I1Open ↗
08/16/2026M00664763-P1Open ↗
▸BISADDITIONAL INFORMATION1
05/06/2013121031533Open ↗
▸Other Documents7
▸DOB NOWProof of Historic Building7
09/02/2026M00665073-I1Open ↗
08/15/2026M00664763-I1Open ↗
08/14/2026M00664763-P1Open ↗
Showing 3 of 7 on file for this type