← Back
Church, synagogue, chapel
206 LENOX AVENUE
MANHATTAN · Harlem (South) · BIN 1053316
💬 Discuss this project
1888Year Built
5Stories
M1Building Class
R7-2Zoning
4,800 sfGross Floor Area
1Units
Rent Stabilized101 Open Violations ▸
Church, synagogue, chapel · Owner of record: 206 LENOX LLC · 1,600 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof38p · 3 filings · 20 docs
Floor 467p · 7 filings · 20 docs
Floor 368p · 7 filings · 20 docs
Floor 267p · 7 filings · 20 docs
Floor 166p · 7 filings · 20 docs
Cellar62p · 6 filings · 20 docs
Basement24p · 1 filing · 20 docs
Sub-Basement47p · 6 filings · 20 docs
Site & exterior10p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YASH B CONSTRUCTION303/21/2026
HPD203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2024$1.8M—FAITH TEMPLE DELIVERANCE CHURCH OF CHRIST INC. → 206 LENOX LLC$377/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL GURDAK ARCHITECT603/17/2026
EMTG CONSULTANTS INC612/01/2025
TAMASIDZE ENGINEERING P.C.406/03/2025
ARCHETYPE ARCHITECTURE205/09/2024
MCRB SERVICE CORP101/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KX CONSULTING3403/21/2026
PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN SMART NYC INCGeneral Contractor1807/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor304/09/2026
ALEXANDRE NOSSOULENKOElectrical203/21/2026
SD ELECTL DIVISION NYC COElectrical103/22/2026
NONSTOP PLUMBERS CORPFire Protection107/08/2026
AUTHENTIC PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR ARCHITECT P.C.11711803/17/2026
NORMAN C. LOK818301/22/2025
Building Lifecycle
All (180)Filed (19)Permit Issued (13)Signed Off (10)Violation (60)Inspection (10)Objection (38)Special Inspection (30)
06/26/2026
Signed off — Alteration CO
APPLICATION FILED FOR CONVERSION OF EXISTING PUBLIC BUILDING (CHURCH AND FIVE APARTMENTS) INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C. OF O. RELATED PL, MH, ST WORK FILED UNDER SEPARATE APPLICATIONS.
M01087464-I1
04/29/2026
Violation issued (HPD, open)
A
04/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
03/27/2026
Objection resolved — Addressed
03/26/2026
Objection raised — Other
03/17/2026
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION OF EXISTING PUBLIC BUILDING (CHURCH AND FIVE APARTMENTS) INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C. OF O. RELATED PL, MH, ST WORK FILED UNDER SEPARATE APPLICATIONS.
M01087464-P3
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
01/20/2026
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES, A NEW SANITARY, STORM, DOMESTIC WATER AND SANITARY VENT PIPING WITHIN AN EXISTING RESIDENTIAL BUILDING AS PER PLANS SUBMITTED HEREWITH.
M01091389-I1
01/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/13/2026
Signed off — Alteration
M00012391-I1
01/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/19/2025
Special inspection requirement — Post-installed Anchors
ANGEL ROJAS
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
12/17/2025
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION OF EXISTING PUBLIC BUILDING (CHURCH AND FIVE APARTMENTS) INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C. OF O. RELATED PL, MH, ST WORK FILED UNDER SEPARATE APPLICATIONS.
M01087464-P2
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
12/01/2025
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS SUBMITTED HEREWITH.
M01091399-I1
12/01/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES, A NEW SANITARY, STORM, DOMESTIC WATER AND SANITARY VENT PIPING WITHIN AN EXISTING RESIDENTIAL BUILDING AS PER PLANS SUBMITTED HEREWITH.
M01091389-P2
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2025
Signed off — Alteration
The work is limited to the addition of a new stoop and minor excavation work for lowering the existing grade at the front yard
M01087456-I1
11/17/2025
Violation issued (HPD, open)
I
11/13/2025
Signed off — Alteration
PROPOSED HVAC SYSTEM FOR RESIDENTIAL BUILDING IN NEW YOR CITY UTILIZING VRF HEAT PUMP SYSTEMS. ALL AS PER PLANS SUBMITTED HEREWITH.
M01091395-I1
11/12/2025
Signed off — Alteration
M01046065-I1
11/06/2025
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
11/06/2025
Special inspection requirement — Heating Systems
ANGEL ROJAS
11/06/2025
Special inspection requirement — Final
ANGEL ROJAS
11/05/2025
Signed off — Alteration
SCOPE OF THIS PROJECT IS STRICTLY LIMITED TO THE FLOOR FRAMING SUPPORTED AT THE WALLS SHOWN AT BASEMENT, FIRST, SECOND, THIRD AND FOURTH FLOORS ON PROPOSED ARCHITECTURAL PLANS.
M01086886-I1
11/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
11/03/2025
Special inspection requirement — Final
PAUL GURDAK-WARCHOL
10/27/2025
Objection raised — Other
10/27/2025
Objection resolved — Addressed
10/24/2025
Filed — Alteration
PROPOSED HVAC SYSTEM FOR RESIDENTIAL BUILDING IN NEW YOR CITY UTILIZING VRF HEAT PUMP SYSTEMS. ALL AS PER PLANS SUBMITTED HEREWITH.
M01091395-P1
10/24/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES, A NEW SANITARY, STORM, DOMESTIC WATER AND SANITARY VENT PIPING WITHIN AN EXISTING RESIDENTIAL BUILDING AS PER PLANS SUBMITTED HEREWITH.
M01091389-P1
10/23/2025
Signed off — Alteration
The work is limited to the addition of a new stoop and minor excavation work for lowering the existing grade at the front yard
M01087456-S1
10/23/2025
Filed — Alteration
The work is limited to the addition of a new stoop and minor excavation work for lowering the existing grade at the front yard
M01087456-P2
10/23/2025
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION OF EXISTING PUBLIC BUILDING (CHURCH AND FIVE APARTMENTS) INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C. OF O. RELATED PL, MH, ST WORK FILED UNDER SEPARATE APPLICATIONS.
M01087464-P1
10/22/2025
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
10/22/2025
Special inspection requirement — Final
ANGEL ROJAS
10/22/2025
Special inspection requirement — Heating Systems
ANGEL ROJAS
10/21/2025
Special inspection requirement — Post-installed Anchors
ANGEL ROJAS
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
10/21/2025
Special inspection requirement — Final
PAUL GURDAK-WARCHOL
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
10/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/20/2025
Permit issued — Structural
M01087456-S1-ST
06/18/2025
Special inspection requirement — Concrete - Cast-In-Place
ANGEL ROJAS
06/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
06/18/2025
Special inspection requirement — Post-installed Anchors
ANGEL ROJAS
06/18/2025
Special inspection requirement — Final
ANGEL ROJAS
06/18/2025
Special inspection requirement — Masonry
ANGEL ROJAS
06/04/2025
Violation issued (HPD, open)
A
06/03/2025
Filed — Alteration
The work is limited to the addition of a new stoop and minor excavation work for lowering the existing grade at the front yard
M01087456-P1
05/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offDESIGN SMART NYC INC06/20/2025
DOB NOWConstruction FenceSigned-offDESIGN SMART NYC INC05/01/2025
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP04/08/2025
DOB NOWSprinklersSigned-offNONSTOP PLUMBERS CORP03/04/2025
DOB NOWMechanical SystemsSigned-offDESIGN SMART NYC INC02/25/2025
DOB NOWGeneral ConstructionPermit IssuedDESIGN SMART NYC INC02/07/2025
DOB NOWGeneral ConstructionSigned-offDESIGN SMART NYC INC01/29/2025
DOB NOWStructuralSigned-offDESIGN SMART NYC INC08/20/2024
DOB NOWGeneral ConstructionSigned-offDESIGN SMART NYC INC05/13/2024
DOB NOWConstruction FenceSigned-offDESIGN SMART NYC INC05/10/2024
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC08/03/2018
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC04/20/2018
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC01/19/2018
BISEQISSUEDARTI RESTORATION INC10/23/2018
BISOTISSUEDARTI RESTORATION INC10/23/2018
BISOTISSUEDARTI RESTORATION INC12/11/2017
BISOTISSUEDARTI RESTORATION INC09/07/2017
BISEQISSUEDARTI RESTORATION INC09/07/2017
BISEQISSUEDARTI RESTORATION INC07/20/2016
BISOTISSUEDARTI RESTORATION INC07/20/2016
BISEQISSUEDYASH & B CONSTRUCTION COR04/01/2014
BISEQISSUEDLAKHI GENERAL CONTRACTOR02/10/2009
3 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025CompleteSD ELECTL DIVISION NYC CO3 meters, 3 new_meters
12/04/2025CompleteSD ELECTL DIVISION NYC COGeneral Wiring
12/04/2025CompleteSD ELECTL DIVISION NYC COGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
04/01/2026Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
04/01/2026Fire-Resistant Penetrations and JointsANGEL ROJASspecial
03/17/2026Fire-Resistant Penetrations and JointsANGEL ROJASspecial
03/17/2026Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
12/19/2025Post-installed AnchorsANGEL ROJASspecial
12/19/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
12/16/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
12/16/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
11/06/2025Mechanical SystemsANGEL ROJASspecial
11/06/2025Heating SystemsANGEL ROJASspecial
11/06/2025FinalANGEL ROJASprogress
11/03/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
11/03/2025FinalPAUL GURDAK-WARCHOLprogress
10/22/2025Mechanical SystemsANGEL ROJASspecial
10/22/2025FinalANGEL ROJASprogress
10/22/2025Heating SystemsANGEL ROJASspecial
10/21/2025Post-installed AnchorsANGEL ROJASspecial
10/21/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
10/21/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
10/21/2025FinalPAUL GURDAK-WARCHOLprogress
10/21/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
10/21/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
06/18/2025Concrete - Cast-In-PlaceANGEL ROJASspecial
06/18/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
06/18/2025Post-installed AnchorsANGEL ROJASspecial
Latest 25 of 40.
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/06/2026M00012391-I1Request digital key ↗
08/27/2026M01046065-I1Request digital key ↗
08/27/2026M01041351-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits34
▸DOB NOWLPC Approval/Permit15
08/20/2026M01091389-I1Open ↗
08/20/2026M01091389-P2Open ↗
08/15/2026M01087464-P3Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION9
10/23/2018122623349Open ↗
10/23/2018122623349Open ↗
12/12/2017122623349Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
01/30/2026122623349Open ↗
01/06/2026122623349Open ↗
01/06/2026122623349Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/04/2024140175931Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/13/2016122623349Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 14
08/15/2026M01087464-P3Open ↗
08/13/2026M01087464-P2Open ↗
08/13/2026M01087464-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/15/2026M01087464-P3Open ↗
08/13/2026M01087464-I1Open ↗
08/13/2026M01087464-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWSpecial Inspector Seal & Signature33
09/02/2026M01087456-I1Open ↗
09/01/2026M01087456-P2Open ↗
09/01/2026M01086886-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026M01046065-I1Open ↗
08/27/2026M01041351-I1Open ↗
08/25/2026M01086886-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026M01087456-I1Open ↗
09/01/2026M01087456-P2Open ↗
09/01/2026M01086886-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/29/2015122623349Open ↗
02/10/2009110447393Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/29/2015122623349Open ↗
03/24/2014140175931Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/10/2009110447393Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/13/2016122623349Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/24/2014140175931Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/24/2014140175931Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/18/2026M01087464-P2Open ↗
08/15/2026M01087464-I1Open ↗
08/15/2026M01087464-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026M01087464-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M01087464-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M01087464-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/27/2026M01041351-I1Open ↗
08/25/2026M01086886-P1Open ↗
08/24/2026M01087456-P2Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/10/2009110447393Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/13/2016122623349Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/01/2025140175931Open ↗
03/24/2014140175931Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/02/2026122623349Open ↗
04/01/2025110447393Open ↗
▸BISFINAL1
04/01/2025140175931Open ↗
▸BISLANDMARKS APPROVAL1
03/24/2014140175931Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/10/2009110447393Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/29/2015122623349Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
12/29/2015122623349Open ↗
02/10/2009110447393Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/24/2014140175931Open ↗
▸Other Documents16
▸DOB NOWProof of Historic Building11
08/20/2026M01091389-P2Open ↗
08/20/2026M01091389-I1Open ↗
08/15/2026M01087464-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProperty Ownership Certification4
08/18/2026M01087464-P2Open ↗
08/15/2026M01087464-I1Open ↗
08/15/2026M01087464-P3Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/22/2015122623349Open ↗