← Back
Elevator apt, semi-fireproof without stores
206 QUENTIN ROAD
BROOKLYN · BIN 3176857
💬 Discuss this project
1940Year Built
6Stories
D1Building Class
R7AZoning
52,410 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized3 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: QUENTIN REALTY, LLC · 10,000 sf lot · 5.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof5p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONEY REALTY708/28/2026
METRO CONTRACTING NY907/08/2026
MSR CONSTRUCTION903/22/2026
DISH WIRELESS303/22/2026
QUENTIN REALTY1503/22/2026
206 QUENTIN REATY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAGARAM ENGINEERING SERVICES106/18/2026
KM CONSULTING ENGINEERS, INC.312/07/2022
KMB DESIGN GROUP, LLC106/21/2022
GREEN DESIGN209/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING603/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATLANTA TRA&ENG CO.LLCGeneral Contractor303/21/2026
MSR CONSTRUCTION CORPGeneral Contractor203/21/2026
SQUAN CONSTRUCTION SERVICGeneral Contractor203/21/2026
METRO CONTRACTING NY, INC.General Contractor107/08/2026
DIOGENES BRITOElectrical103/21/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
SANKAR SHILElectrical103/21/2026
HIMALAYA TOWERSGeneral Contractor108/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M + K DEVELOPMENT VENTURE8486106/18/2026
KMB DESIGN GROUP, LLC513106/21/2022
Building Lifecycle
All (79)Filed (7)Permit Issued (6)Signed Off (4)Violation (60)Objection (2)
08/26/2026
Signed off — Alteration
Modification to T-Mobile site - Installing 10 antennas and 6 RRU's on the roof. Remove 7 antennas and 11 RRU's on the roof. Remove 3 cabinet and install 2 cabinet on the roof.
B01401092-I1
08/17/2026
Permit issued — Antenna
B01401092-I1-AN
07/02/2026
Objection resolved — Resolved
06/24/2026
Objection raised — Other
06/18/2026
Filed — Alteration
Modification to T-Mobile site - Installing 10 antennas and 6 RRU's on the roof. Remove 7 antennas and 11 RRU's on the roof. Remove 3 cabinet and install 2 cabinet on the roof.
B01401092-I1
06/28/2024
Violation issued (HPD, closed)
B
06/28/2024
Violation issued (HPD, closed)
B
06/28/2024
Violation issued (HPD, closed)
B
06/28/2024
Violation issued (HPD, closed)
B
12/06/2023
Violation issued (HPD, closed)
C
12/06/2023
Violation issued (HPD, closed)
B
12/06/2023
Violation issued (HPD, closed)
B
10/13/2023
Signed off — Alteration
T-Mobile. Relocation of (2)antenna sectors from the parapet to ballast frames. Removal of existing equipment platform & related equipment. Relocate existing equipment cabinet to proposed grating on the roof. All work in conformance w/TPPN 5/98. No change
B00444095-I1
03/22/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
B
02/19/2023
Violation issued (HPD, closed)
B
02/19/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
B
01/23/2023
Violation issued (ECB, closed)
Elevators
12/22/2022
Signed off — Alteration
B00544626-I1
12/07/2022
Filed — Alteration
T-Mobile. Relocation of (2)antenna sectors from the parapet to ballast frames. Removal of existing equipment platform & related equipment. Relocate existing equipment cabinet to proposed grating on the roof. All work in conformance w/TPPN 5/98. No change
B00444095-P2
12/06/2022
Permit issued — Antenna
B00444095-I1-AN
08/05/2022
Permit issued — Antenna
B00544626-I1-AN
06/21/2022
Filed — Alteration
B00544626-I1
03/07/2022
Violation issued (HPD, closed)
C
02/15/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (HPD, closed)
C
01/05/2022
Violation issued (HPD, closed)
C
01/03/2022
Signed off — Alteration
B00397691-I1
12/15/2021
Filed — Alteration
T-Mobile. Relocation of (2)antenna sectors from the parapet to ballast frames. Removal of existing equipment platform & related equipment. Relocate existing equipment cabinet to proposed grating on the roof. All work in conformance w/TPPN 5/98. No change
B00444095-P1
12/06/2021
Violation issued (HPD, closed)
B
11/17/2021
Violation issued (HPD, closed)
C
11/17/2021
Violation issued (HPD, closed)
B
09/27/2021
Violation issued (ECB, closed)
Construction
05/07/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/12/2021
Permit issued — Sidewalk Shed
B00397691-I1-SH
02/18/2021
Violation issued (ECB, closed)
Construction
12/23/2020
Filed — Alteration
T-Mobile. Relocation of (2)antenna sectors from the parapet to ballast frames. Removal of existing equipment platform & related equipment. Relocate existing equipment cabinet to proposed grating on the roof. All work in conformance w/TPPN 5/98. No change
B00444095-I1
12/14/2020
Violation issued (HPD, closed)
B
12/14/2020
Violation issued (HPD, closed)
C
09/16/2020
Violation issued (ECB, closed)
Construction
09/14/2020
Permit issued — Sidewalk Shed
B00397691-I1-SH
09/11/2020
Filed — Alteration
B00397691-I1
06/25/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2020
Violation issued (HPD, closed)
C
03/27/2020
Violation issued (HPD, closed)
C
02/28/2020
Violation issued (HPD, closed)
C
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offHIMALAYA TOWERS08/17/2026
DOB NOWAntennaSigned-offSQUAN CONSTRUCTION SERVIC12/06/2022
DOB NOWAntennaSigned-offATLANTA TRA&ENG CO.LLC08/05/2022
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC03/12/2021
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.09/14/2020
DOB NOWSupported ScaffoldPermit IssuedMSR CONSTRUCTION CORP01/17/2020
BISOTISSUEDSQUAN CONSTRUCTION SERVIC12/27/2021
BISOTISSUEDMSR CONSTRUCTION CORP07/14/2021
BISEQISSUEDMSR CONSTRUCTION CORP07/14/2021
BISEQISSUEDMSR CONSTRUCTION CORP09/08/2020
BISOTISSUEDMSR CONSTRUCTION CORP07/28/2020
BISEQISSUEDMETRO CONTRACTING NY, INC.08/01/2018
BISEQISSUEDMETRO CONTRACTING NY, INC.08/01/2017
BISEQISSUEDMETRO CONTRACTING NY, INC.08/18/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/19/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/08/2015
BISOTISSUEDCOSTROTTA CONT MANGT03/28/2005
BISEQISSUEDSPRING SCAFFOLDING10/18/2002
1 project · most recent 08/24/2022
FiledStatusContractorScope
08/24/2022Permit IssuedREDGRAVE ELECTL MAINTNCE51 meters, 1 new_meters
Nothing on file for this building.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Antenna3
09/02/2026B00444095-P1Request digital key ↗
09/02/2026B00444095-I1Request digital key ↗
09/02/2026B00444095-P2Request digital key ↗
▸DOB NOWPlans/Sketch2
08/29/2026B00544626-I1Request digital key ↗
08/15/2026B01401092-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00297815-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00397691-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
01/03/2022321126036Open ↗
09/08/2020340754455Open ↗
07/28/2020340748962Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
02/19/2022340412217Open ↗
12/30/2020321126036Open ↗
08/27/2020340754455Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/14/2016321126036Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026B00444095-I1Open ↗
09/02/2026B00444095-P2Open ↗
09/02/2026B00444095-P1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/27/2020340754455Open ↗
07/23/2020340748962Open ↗
08/13/2016340412217Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/27/2020340754455Open ↗
07/23/2020340748962Open ↗
08/13/2016340412217Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/27/2020340754455Open ↗
07/23/2020340748962Open ↗
08/13/2016340412217Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/07/2015321126036Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
01/07/2016321126036Open ↗
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan5
08/13/2026B00444095-P2Open ↗
08/13/2026B00444095-P1Open ↗
08/13/2026B00297815-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
08/27/2020340754455Open ↗
07/23/2020340748962Open ↗
08/13/2016340412217Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026B00444095-P2Open ↗
09/02/2026B00444095-P1Open ↗
09/02/2026B00444095-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/23/2020340748962Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/07/2022340748962Open ↗
09/08/2020340754455Open ↗
08/27/2020340754455Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/23/2020340748962Open ↗
▸BISNYCECC ANALYSIS1
07/23/2020340748962Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/07/2015321126036Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/07/2022340748962Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00544626-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
07/14/2022340754455Open ↗
03/07/2022340748962Open ↗
02/14/2022340412217Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/18/2022340754455Open ↗
03/08/2022340748962Open ↗
02/15/2022340412217Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
08/02/2018340412217Open ↗
08/02/2017340412217Open ↗
▸BISFINAL1
01/26/2022340412217Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/07/2015321126036Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/07/2022340748962Open ↗
07/23/2020340748962Open ↗
05/07/2015321126036Open ↗
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET3
08/27/2020340754455Open ↗
07/23/2020340748962Open ↗
08/13/2016340412217Open ↗
▸BISADDITIONAL INFORMATION3
07/28/2020340748962Open ↗
09/14/2019340412217Open ↗
01/09/2017321126036Open ↗
▸BISEFILING COVER SHEET1
05/06/2015321126036Open ↗
▸BISBOROUGH INTAKE FORM1
01/03/2022321126036Open ↗