← Back
Walk-up apt, over six families with stores
206 RIVINGTON STREET
MANHATTAN · Lower East Side · BIN 1004106
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
R7AZoning
16,237 sfGross Floor Area
27Units
Rent Stabilized14 Open Violations 13 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: LO-HO LLC · 4,030 sf lot · 4.03 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 64p · 1 filing · 15 docs
Floor 55p · 1 filing · 15 docs
Floor 41p · 1 filing · 15 docs
Floor 31 filing · 12 docs
Floor 2
Floor 1
CellarUnder Construction2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILLIAM GOTTLIEB MANAGEMENT2707/08/2026
544 HUDSON203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MIKE POLYCHRONIADES P.E.204/21/2025
BRENT M. PORTER, ARCHITECT, AND ASS209/25/2024
ARQUITECTURA VARELA410/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CM3 DESIGN STUDIO403/21/2026
ENKAY DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARATHON MECHANICAL LLCPlumbing407/08/2026
MARPAT CONSTRUCTION CORPGeneral Contractor203/21/2026
HT PLUMBING & HEATING CORPlumbing207/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MIKE POLYCHRONIADES8407204/21/2025
INTEGRITY CONSULTING SERV666509/25/2024
Building Lifecycle
All (71)Filed (8)Permit Issued (7)Signed Off (3)Violation (30)Inspection (5)Objection (4)Special Inspection (14)
06/01/2026
Permit issued — Boiler Equipment
M01203705-I1-BE
06/01/2026
Permit issued — Plumbing
M01203716-I1-PL
06/11/2025
Permit issued — Plumbing
M01203716-I1-PL
05/29/2025
Permit issued — Boiler Equipment
M01203705-I1-BE
04/21/2025
Filed — Alteration
Install gas hot water heating boiler less than 350,000 BTUH (LAARS Model PH0325CN01CBABR) and (2) indirect tanks (A.O. Smith TJV-120M)
M01203716-I1
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
mike polychroniades
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
mike polychroniades
04/17/2025
Filed — Alteration
Replace existing gas fired boiler in-kind
M01203705-I1
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
mike polychroniades
04/01/2025
Special inspection requirement — Heating Systems
mike polychroniades
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
mike polychroniades
11/09/2024
Violation issued (HPD, closed)
A
10/31/2024
Signed off — Alteration
PLUMBING SCOPE OF WORK, AS FILED IN-CONJUNCTION WITH BIS GENERAL CONSTRUCTION APPLICATION.
M00293358-I1
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
10/09/2024
Special inspection requirement — HVAC insulation and sealing
ALEKSANDR LEVIN
10/02/2024
Signed off — Alteration
APPLICATION FOR THE IINTERIOR ONLY - GENERAL CONSTRUCTION TO COMBINE APARTMENTS 4C - 4D & 5C - 5D ( TO COMPLY WITH TPPN 03/97 ) NO CHANGE OF USE, EGRESS NOR OCCUPANCY.
M08037725-I1
10/02/2024
Signed off — Alteration
APPLICATION FOR THE IINTERIOR ONLY - GENERAL CONSTRUCTION TO COMBINE APARTMENTS 4C - 4D & 5C - 5D ( TO COMPLY WITH TPPN 03/97 ) NO CHANGE OF USE, EGRESS NOR OCCUPANCY.
M08037725-S1
09/25/2024
Filed — Alteration
PLUMBING SCOPE OF WORK, AS FILED IN-CONJUNCTION WITH BIS GENERAL CONSTRUCTION APPLICATION.
M00293358-P1
07/24/2024
Violation issued (FDNY_NOV, closed)
07/24/2024
Violation issued (FDNY_ORDER, closed)
07/24/2024
Violation issued (FDNY_NOV, closed)
06/11/2024
Violation issued (FDNY_ORDER, closed)
06/11/2024
Violation issued (FDNY_NOV, closed)
06/11/2024
Violation issued (FDNY_ORDER, closed)
06/11/2024
Violation issued (FDNY_ORDER, closed)
01/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/05/2023
Filed — Alteration
APPLICATION FOR THE IINTERIOR ONLY - GENERAL CONSTRUCTION TO COMBINE APARTMENTS 4C - 4D & 5C - 5D ( TO COMPLY WITH TPPN 03/97 ) NO CHANGE OF USE, EGRESS NOR OCCUPANCY.
M08037725-P2
10/02/2023
Filed — Alteration
APPLICATION FOR THE IINTERIOR ONLY - GENERAL CONSTRUCTION TO COMBINE APARTMENTS 4C - 4D & 5C - 5D ( TO COMPLY WITH TPPN 03/97 ) NO CHANGE OF USE, EGRESS NOR OCCUPANCY.
M08037725-P1
10/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
09/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2023
Permit issued — Plumbing
M00293358-I1-PL
04/13/2023
Permit issued — Plumbing
M08037725-S1-PL
03/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
03/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
03/15/2023
Violation issued (HPD, closed)
A
03/13/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
03/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
03/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
03/08/2023
Permit issued — General Construction
M08037725-I1-GC
02/17/2023
Filed — Alteration
APPLICATION FOR THE IINTERIOR ONLY - GENERAL CONSTRUCTION TO COMBINE APARTMENTS 4C - 4D & 5C - 5D ( TO COMPLY WITH TPPN 03/97 ) NO CHANGE OF USE, EGRESS NOR OCCUPANCY.
M08037725-S1
01/25/2023
Filed — Alteration
APPLICATION FOR THE IINTERIOR ONLY - GENERAL CONSTRUCTION TO COMBINE APARTMENTS 4C - 4D & 5C - 5D ( TO COMPLY WITH TPPN 03/97 ) NO CHANGE OF USE, EGRESS NOR OCCUPANCY.
M08037725-I1
02/16/2022
Violation issued (HPD, closed)
A
04/27/2021
Objection raised — Scope
04/27/2021
Objection resolved — Addressed
04/26/2021
Objection raised — Scope
04/26/2021
Objection resolved — Addressed
04/06/2021
Filed — Alteration
PLUMBING SCOPE OF WORK, AS FILED IN-CONJUNCTION WITH BIS GENERAL CONSTRUCTION APPLICATION.
M00293358-I1
04/01/2021
Violation issued (HPD, closed)
A
09/23/2020
Violation issued (FDNY_NOV, closed)
10/24/2018
Violation issued (ECB, open)
Construction
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2016
Violation issued (HPD, closed)
I
03/25/2015
Violation issued (HPD, closed)
A
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedMARATHON MECHANICAL LLC06/01/2026
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC06/01/2026
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC06/11/2025
DOB NOWBoiler EquipmentPermit IssuedMARATHON MECHANICAL LLC05/29/2025
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR05/08/2023
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR04/13/2023
DOB NOWGeneral ConstructionSigned-offMARPAT CONSTRUCTION CORP03/08/2023
BISOTISSUEDMARPAT CONSTRUCTION CORP05/10/2023
BISOTISSUEDMARPAT CONSTRUCTION CORP03/06/2023
BISOTISSUEDNYC PAINTING CONTRACTING*05/19/2022
BISOTISSUEDNYC PAINTING CONTRACTING*02/10/2022
BISOTISSUEDGO PRO RESTORATION & MAIN01/09/2017
BISPLISSUEDMARATHON MECHANICAL LLC01/03/2017
BISOTISSUEDCLAY DRYWALL INC07/22/2015
BISEQISSUEDCLAY DRYWALL INC07/22/2015
BISPLISSUEDMARATHON MECHANICAL LLC03/24/2015
BISOTISSUEDJEPOL CONSTRUCTION INC02/03/2015
BISOTISSUEDJEPOL CONSTRUCTION INC02/18/2014
BISPLISSUEDSTUART WACHTEL & SON INC03/25/2011
BISOTISSUEDL KRUNFOL CONSTRUCTION LL03/09/2011
BISFPISSUEDMASTER FIRE SYSTEMS, INC01/19/2011
BISOTISSUEDNEW WAN COMPANY INC03/23/2010
BISOTISSUEDWILLIMA GOTTLIEB04/02/2003
BISOTISSUEDWILLIMA GOTTLIEB04/22/2002
BISFPISSUEDNY BUSINESS FIRE SYST.06/16/2000
BISPLISSUEDM&J PLBG AND MECHANICAL CORP05/23/2000
BISMHISSUEDALL TECNICAL ART`04/24/2000
BISPLISSUEDS&B PLBG CORP01/07/1999
BISOTISSUEDWILLIAM GOTTLIEB01/07/1999
BISOTISSUEDWILLIAM GOTTLIEB01/05/1998
BISPLISSUEDS&B PLBG CORP04/30/1997
BISOTISSUEDWILLIAM GOTTLIEB01/06/1997
BISPLISSUEDS&B PLBG CORP09/11/1996
BISOTISSUEDWILLIAM GOTTLIEB01/22/1996
BISOTISSUEDWILLIAM GOTTLIEB01/09/1995
BISPLISSUEDS&B PLBG CORP08/19/1994
BISOTISSUEDWILLIAM GOTTLIEB12/29/1993
BISPLISSUEDWILLIAM GOTTLIEB05/12/1993
BISOTISSUEDWILLIAM GOTTLIEB12/18/1992
1 project · most recent 04/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/21/2025Permit IssuedMARATHON MECHANICAL LLCGas, Water/Sanitary
2 projects · most recent 05/02/2023
General Wiring
FiledStatusContractorScope
05/02/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
03/14/2023Permit IssuedREDGRAVE ELECTL MAINTNCEGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/21/2025Energy Code Compliance Inspectionsmike polychroniadesprogress
04/21/2025Fire-Resistant Penetrations and Jointsmike polychroniadesspecial
04/01/2025Tenant Protection Plan Compliancemike polychroniadesspecial
04/01/2025Heating Systemsmike polychroniadesspecial
04/01/2025Tenant Protection Plan Compliancemike polychroniadesspecial
10/09/2024Energy Code Compliance InspectionsALEKSANDR LEVINprogress
10/09/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
10/09/2024HVAC insulation and sealing ALEKSANDR LEVINenergy_progress
10/02/2023Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
03/29/2023Tenant Protection Plan Compliance—special
03/29/2023Tenant Protection Plan Compliance—special
03/13/2023FinalALEKSANDR LEVINprogress
03/13/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
03/13/2023Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/31/2026M08037725-S1Request digital key ↗
08/31/2026M08037725-P2Request digital key ↗
08/31/2026M08037725-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00293358-P1Request digital key ↗
08/15/2026M00293358-I1Request digital key ↗
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION13
05/10/2023123766647Open ↗
03/06/2023123766647Open ↗
05/20/2022123766647Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
03/11/2020123766647Open ↗
03/23/2015122333714Open ↗
09/18/2012120471202Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/10/2020123766647Open ↗
08/05/2015122333714Open ↗
03/23/2015122333714Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00293358-I1Open ↗
09/03/2026M00293358-P1Open ↗
08/24/2026M01203716-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01203705-I1Open ↗
09/01/2026M01203705-I1Open ↗
09/01/2026M00293358-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00293358-I1Open ↗
09/01/2026M00293358-I1Open ↗
08/23/2026M08037725-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING5
09/12/2012120471202Open ↗
09/10/2012120471202Open ↗
11/08/2011120539177Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
09/12/2012120471202Open ↗
09/10/2012120471202Open ↗
09/17/2010120471202Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
03/09/2012120539177Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/30/2012120569205Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/23/2015122333714Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
09/03/2026M00293358-P1Open ↗
08/15/2026M00293358-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/28/2021123766647Open ↗
▸BISTenant Protection Plan and Notes1
03/10/2020123766647Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00293358-P1Open ↗
08/24/2026M01203716-I1Open ↗
08/15/2026M00293358-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
02/18/2011120539177Open ↗
09/17/2010120471202Open ↗
03/04/2010120277119Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/10/2020123766647Open ↗
03/23/2015122333714Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/04/2011120569205Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/10/2020123766647Open ↗
08/05/2015122333714Open ↗
03/23/2015122333714Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/09/2022123766647Open ↗
12/14/2021123766647Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/19/2024123766647Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/19/2024123766647Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/19/2012120471202Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/20/2024123766647Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00293358-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/09/2022123766647Open ↗
12/14/2021123766647Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/19/2024123766647Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/19/2024123766647Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS4
02/18/2011120539177Open ↗
01/04/2011120569205Open ↗
09/17/2010120471202Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/23/2024123766647Open ↗
03/30/2012120569205Open ↗
05/04/2010120277119Open ↗
▸BISSUPERSEDING LETTER1
03/06/2023123766647Open ↗
▸BISFINAL1
08/19/2024123766647Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
08/21/2024123766647Open ↗
03/10/2020123766647Open ↗
03/23/2015122333714Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms14
▸BISBOROUGH INTAKE FORM7
05/10/2023123766647Open ↗
05/05/2023123766647Open ↗
03/06/2023123766647Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
03/11/2020123766647Open ↗
03/23/2015122333714Open ↗
01/04/2011120569205Open ↗
Showing 3 of 5 on file for this type
▸BISeFiling Job Application Cover Sheet1
02/18/2011120539177Open ↗
▸BISADDITIONAL INFORMATION1
10/16/2012120471202Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
03/09/2012120539177Open ↗