← Back
Miscellaneous two family
206 ST JAMES PLACE
BROOKLYN · Clinton Hill · BIN 3056659
💬 Discuss this project
1890Year Built
3Stories
B9Building Class
R6BZoning
3,567 sfGross Floor Area
2Units
Miscellaneous two family · 1,678 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof58p · 4 filings · 20 docs
Floor 360p · 3 filings · 20 docs
Floor 257p · 4 filings · 20 docs
Floor 158p · 3 filings · 20 docs
Cellar64p · 5 filings · 20 docs
Sub-Basement60p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2023$2.8M—— → —$785/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL-ARCHITECTURE OFFICE DPC408/21/2026
WILLIAM F. RYAN, JR. P.E. PC404/11/2025
BGM ENGINEERING504/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HARD SAFARI CORPGeneral Contractor1307/08/2026
PLUS RENOVATION LLCGeneral Contractor404/09/2026
A.M.N. CORPORATIONPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV6661008/21/2026
BGM ENGINEERING, LLC1514104/10/2024
Building Lifecycle
All (76)Filed (13)Permit Issued (9)Inspection (3)Objection (21)Special Inspection (30)
08/21/2026
Filed — Alteration
Modification of rear yard; new skylight.
B00919728-P2
08/11/2026
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Permanent certificate
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Interior lighting power
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Metering
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
08/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
12/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/11/2025
Filed — Alteration
PROVIDE MINI-SPLIT, VRF HEAT RECOVERY SYSTEM TO SERVE HEATING & COOLING LOAD. PROVIDE KITCHEN HOOD EXHAUST. PROVIDE BATHROOM EXHAUST, PROVIDE DYER EXHAUST AS HOWN ON PLANS. THERE IS MO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00920543-P2
04/11/2025
Permit issued — Plumbing
B00920547-I1-PL
01/29/2025
Permit issued — Structural
B00919868-S1-ST
11/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
11/12/2024
Filed — Alteration
ADDITION & MODIFICATION OF THE EXISTING PLUMBING SYSTEMS SERVING ENTITE TOWNHOUSE AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00920547-P1
10/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/05/2024
Permit issued — Structural
B00919868-S1-ST
05/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Interior lighting power
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Permanent certificate
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Final
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Metering
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
05/10/2024
Special inspection requirement — Air barrier — testing
ALEKSANDR LEVIN
05/02/2024
Permit issued — General Construction
B00919868-S2-GC
05/01/2024
Objection resolved — Addressed
04/24/2024
Objection resolved — Addressed
04/24/2024
Objection resolved — Addressed
04/24/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RAUL VELASQUEZ MARTINEZ
04/19/2024
Objection raised — Scope
04/19/2024
Objection resolved — Addressed
04/19/2024
Objection raised — Scope
04/19/2024
Objection raised — Inspections
04/19/2024
Objection raised — Scope
04/17/2024
Permit issued — General Construction
B00919868-I1-GC-CX
04/10/2024
Filed — Alteration
PROVIDE STRUCTURAL DESIGN FOR DIFFERENT STRUCTURAL COMPONENTS FOR THIS BUILDING WHICH ARE ENTAILED IN THE CONTRACT DOCUMENTS AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00919868-S2
03/07/2024
Permit issued — Support of Excavation
B00919965-I1-SE
03/01/2024
Objection resolved — Addressed
02/26/2024
Objection resolved — Addressed
02/23/2024
Permit issued — Mechanical Systems
B00920543-I1-MS
02/13/2024
Objection raised — Zoning
02/13/2024
Objection resolved — Addressed
02/13/2024
Objection raised — Admin
02/13/2024
Objection resolved — Addressed
02/13/2024
Objection raised — Zoning
02/13/2024
Objection raised — Zoning
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.M.N. CORPORATION04/11/2025
DOB NOWStructuralSigned-offHARD SAFARI CORP01/29/2025
DOB NOWStructuralSigned-offHARD SAFARI CORP06/05/2024
DOB NOWGeneral ConstructionSigned-offPLUS RENOVATION LLC05/02/2024
DOB NOWGeneral ConstructionPermit IssuedPLUS RENOVATION LLC04/17/2024
DOB NOWSupport of ExcavationPermit IssuedHARD SAFARI CORP03/07/2024
DOB NOWMechanical SystemsPermit IssuedHARD SAFARI CORP02/23/2024
DOB NOWPlumbingSigned-offA.M.N. CORPORATION01/19/2024
DOB NOWGeneral ConstructionPermit IssuedHARD SAFARI CORP08/29/2023
1 project · most recent 04/11/2025
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/11/2025Permit IssuedHARD SAFARI CORPAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
— SVZ-KP18NA 18,000 BTU · Fan Coil Indoor ×6
PEAD-A18AA7 14,300 BTU · Fan Coil Indoor ×4
Mitsubishi Electric MXZ-SM48NAMHZ 48,000 BTU · Heat Pump Outdoor ×2
SUZ-KA18NAHZ.TH 18,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 11/12/2024
Water/Sanitary
FiledStatusContractorScope
11/12/2024Signed-offA.M.N. CORPORATIONWater/Sanitary
1 project · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024Permit IssuedAVALON ELECTRIC CORP.General Wiring
2 projects · most recent 04/10/2024
Steel
FiledStatusContractorScope
04/10/2024Signed-offHARD SAFARI CORPSteel
09/07/2023Permit IssuedHARD SAFARI CORP1 scope_items
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
08/11/2026Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
08/11/2026MeteringALEKSANDR LEVINenergy_progress
08/11/2026Maintenance informationALEKSANDR LEVINenergy_progress
08/11/2026Fenestration air leakageALEKSANDR LEVINenergy_progress
08/11/2026Fenestration areasALEKSANDR LEVINenergy_progress
08/11/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/11/2026Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
08/11/2026Energy Code Compliance InspectionsALEKSANDR LEVINprogress
08/11/2026FinalALEKSANDR LEVINprogress
08/11/2026Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
08/11/2026Interior lighting powerALEKSANDR LEVINenergy_progress
08/11/2026Permanent certificateALEKSANDR LEVINenergy_progress
08/11/2026Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
10/24/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
05/10/2024Energy Code Compliance InspectionsALEKSANDR LEVINprogress
05/10/2024FinalALEKSANDR LEVINprogress
05/10/2024Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
05/10/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
05/10/2024Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
05/10/2024Permanent certificateALEKSANDR LEVINenergy_progress
05/10/2024Air barrier — testing ALEKSANDR LEVINenergy_progress
05/10/2024Maintenance informationALEKSANDR LEVINenergy_progress
05/10/2024Interior lighting powerALEKSANDR LEVINenergy_progress
05/10/2024Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
Latest 25 of 80.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B00920547-P1Request digital key ↗
08/26/2026B00920547-I1Request digital key ↗
08/26/2026B00919965-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit13
08/26/2026B00920547-I1Open ↗
08/26/2026B00919728-P2Open ↗
08/25/2026B00919868-S1Open ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/26/2026B00919728-P2Open ↗
08/13/2026B00919728-P1Open ↗
08/13/2026B00919728-S3Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026B00920547-I1Open ↗
08/26/2026B00919728-I1Open ↗
08/26/2026B00919728-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B00919728-P2Open ↗
09/23/2026B00919728-P2Open ↗
08/31/2026B00920543-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B00919728-P2Open ↗
09/02/2026B00920547-I1Open ↗
09/02/2026B00920547-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/26/2026B00919728-I1Open ↗
08/13/2026B00920547-I1Open ↗
08/13/2026B00919965-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00919965-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial4
08/26/2026B00919728-P2Open ↗
08/13/2026B00919728-S3Open ↗
08/13/2026B00919728-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/26/2026B00919728-P2Open ↗
08/13/2026B00919728-S3Open ↗
08/13/2026B00919728-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/26/2026B00919728-P2Open ↗
08/13/2026B00919728-P1Open ↗
08/13/2026B00919728-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00919868-S1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00919965-I1Open ↗