← Back
Telephone utility
206 WEST 36 STREET
MANHATTAN · Midtown-Times Square · BIN 1083622
💬 Discuss this project
0Year Built
—Stories
U4Building Class
M1-9A/R12Zoning
0 sfGross Floor Area
0Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FISP: SAFE
Telephone utility · Owner of record: VERIZON NEW YORK INC · 34,745 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction31p · 5 filings · 20 docs
Floor 12Under Construction32p · 2 filings · 20 docs
Floor 11Under Construction60p · 5 filings · 20 docs
Floor 1032p · 7 filings · 20 docs
Floor 9Under Construction59p · 7 filings · 20 docs
Floor 8Under Construction78p · 6 filings · 20 docs
Floor 742p · 5 filings · 20 docs
Floor 628p · 3 filings · 20 docs
Floor 526p · 3 filings · 20 docs
Floor 425p · 3 filings · 20 docs
Floor 344p · 6 filings · 20 docs
Floor 261p · 6 filings · 20 docs
Floor 137p · 3 filings · 20 docs
Cellar60p · 6 filings · 20 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON30507/08/2026
VERIZON NEW YORK INC PROP303/22/2026
NYNEX303/22/2026
PLATINUM SERVICES NY103/22/2026
NY TELEPHONE CO103/21/2026
VERIZON N.Y.INC103/21/2026
VERIZON LEGAL DEPARTMENT103/21/2026
N Y N E X ROOM 3147103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.16103/21/2026
EUROCELT EXPEDITING, INC2203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
A1 EXPEDITING SERVICE1203/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
HOVANN203/21/2026
ANGELA RIVERA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor12707/08/2026
ASHLAR MECHANICAL CORPFire Protection1007/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor807/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor707/08/2026
PINTO & TEGER ELEC. CORP.Electrical703/22/2026
PACE PLUMBING CORPFire Protection707/08/2026
LAWRENCE J. LEVINEFire Protection403/21/2026
ON-TRAC CONSTRUCTION ASSOGeneral Contractor407/08/2026
PAR PLUMBING CO., INCPlumbing407/08/2026
ALLAN/BRITE-WAY ELEC'L COElectrical303/22/2026
MANENGEERING BUREAU INCFire Protection307/08/2026
PAR FIRE PROTECTION LLCFire Protection307/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
OLYMPIC PLBG & HTG SVC INPlumbing307/08/2026
PACE PLUMBING CORPPlumbing207/08/2026
PREFERRED MECHANICAL INCPlumbing207/08/2026
CORPORATE ELEC. GROUP INCElectrical103/22/2026
PELUSO, RALPHElectrical103/21/2026
HATZEL AND BUEHLER, INCElectrical103/22/2026
JCC CONSTRUCTION CORPPlumbing107/08/2026
SPENELLI, RICHARDElectrical103/21/2026
RAMDATH, JAIDATHElectrical103/21/2026
H.M. HUGHES CO. INCGeneral Contractor107/08/2026
P.E. STONE INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5449211/21/2025
G. BLINN CONSULTING, LLC2894109/12/2025
KZ ENGINEERING, P.C.4665106/25/2025
Building Lifecycle
All (299)Filed (80)Permit Issued (80)Signed Off (43)Facade (FISP) (18)Violation (12)Inspection (32)Objection (4)Special Inspection (30)
05/05/2026
Permit issued — Sprinklers
M00773165-S4-EW-SP
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/18/2026
Cycle 10 facade report submitted
03/18/2026
Cycle 10 facade report signed — SAFE
02/26/2026
Signed off — Alteration
Plumbing drainage and sprinkler installation for new shaftway work
M00734890-S2
02/26/2026
Signed off — Alteration
Support of excavation for new sidewalk transformer vaults
M00851014-S2
02/11/2026
Cycle 10 facade inspection completed
02/04/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/18/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01260359-I1
12/18/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01260359-S1
12/12/2025
Signed off — Alteration
FACADE RESTORATION INCLUDING WINDOW LINTEL REPLACEMENT, MASONRY REPLACEMENT, MORTAR RE-POINTING, SEALANT REPLCEMENT, CONCRETE PATCHING, LINTEL PAINT, STUCCO REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01221442-I1
12/02/2025
Signed off — Alteration
Plumbing work for the installation of new chillers and cooling towers
M00756502-S1
11/21/2025
Filed — Alteration
Sprinkler and plumbing demo and installation for 8th floor fit out.
M00750896-P4
11/13/2025
Signed off — Alteration
M00876010-I1
11/10/2025
Special inspection requirement — Final
EUGENE BIFULCO
11/10/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
11/10/2025
Special inspection requirement — Lighting controls
EUGENE BIFULCO
11/10/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
11/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
11/10/2025
Special inspection requirement — Shutoff dampers
EUGENE BIFULCO
11/10/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
11/10/2025
Special inspection requirement — Metering
EUGENE BIFULCO
10/22/2025
Signed off — Alteration
Plumbing work for the installation of new chillers and cooling towers
M00756502-S3
10/20/2025
Signed off — Alteration
Filing General Construction in relation to repairs to exiting walls and floors as required due to the removal of steam radiators (radiator removal under a separate application) and the construction of a new 9th floor chiller room.
M08055658-I1
10/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Final
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Lighting controls
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Metering
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
10/20/2025
Special inspection requirement — Shutoff dampers
EUGENE BIFULCO
10/17/2025
Filed — Alteration
Plumbing work for the installation of new chillers and cooling towers
M00756502-P8
10/17/2025
Filed — Alteration
Plumbing and sprinkler work for generator installation
M00773165-P5
10/08/2025
Signed off — Alteration
Sprinkler and plumbing demo and installation for 8th floor fit out.
M00750896-I1
10/08/2025
Signed off — Alteration
Sprinkler and plumbing demo and installation for 8th floor fit out.
M00750896-S2
10/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/29/2025
Permit issued — Sidewalk Shed
M01260359-I1-SH
09/24/2025
Permit issued — Sprinklers
M00756502-S3-EW-SP
09/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/22/2025
Signed off — Alteration
Filing for (1) floor drain along with associated piping as shown on drawings submitted herewith
M00943171-I1
09/18/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
09/18/2025
Special inspection requirement — Final
EUGENE BIFULCO
09/18/2025
Special inspection requirement — Shutoff dampers
EUGENE BIFULCO
09/18/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
09/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
09/16/2025
Signed off — Alteration
FILING EXTERIOR CHIMNEY FLUE DISMANTLING AS SHOWN ON DRAWINGS SUBMITTED HEREWITH.
M08022496-I1
09/12/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01260359-S1
09/12/2025
Permit issued — Supported Scaffold
M01260359-S1-SF
09/12/2025
Special inspection requirement — Post-installed Anchors
GREG BLINN
09/11/2025
Permit issued — Suspended Scaffold
M01245883-I1-SC
09/09/2025
Permit issued — General Construction
M08055658-I1-GC
09/03/2025
Permit issued — General Construction
M01221442-I1-GC
08/28/2025
Signed off — Alteration
Support of excavation for new sidewalk transformer vaults
M00851014-S1
Latest 60 of 299 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP05/05/2026
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE09/24/2025
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/12/2025
DOB NOWSuspended ScaffoldPermit IssuedH & H RESTORATION CORP09/11/2025
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP09/09/2025
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP09/03/2025
DOB NOWStandpipePermit IssuedASHLAR MECHANICAL CORP08/27/2025
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP08/27/2025
DOB NOWPlumbingPermit IssuedASHLAR MECHANICAL CORP08/20/2025
DOB NOWStandpipePermit IssuedASHLAR MECHANICAL CORP08/19/2025
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP08/19/2025
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP08/19/2025
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP08/19/2025
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP08/19/2025
DOB NOWSprinklersSigned-offOLYMPIC PLBG & HTG SVC IN08/08/2025
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN08/06/2025
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC07/30/2025
DOB NOWSuspended ScaffoldPermit IssuedH & H RESTORATION CORP06/27/2025
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP11/12/2024
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP11/12/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP11/12/2024
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP11/12/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP11/12/2024
DOB NOWSprinklersSigned-offJCC CONSTRUCTION CORP10/22/2024
DOB NOWSprinklersPermit IssuedMANENGEERING BUREAU, INC10/21/2024
DOB NOWSprinklersSigned-offOLYMPIC PLBG & HTG SVC IN10/18/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP10/15/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP10/09/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP09/10/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP09/10/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP09/10/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP09/10/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP09/10/2024
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP09/10/2024
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP09/10/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP09/09/2024
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP09/09/2024
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP09/09/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP09/09/2024
+ 60 more permits on file
6 projects · most recent 11/21/2025
Heating Systems Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
11/21/2025Permit IssuedTISHMAN INTERIORS CORPAir Conditioning Systems, Ventilation Systems
Cooling
Climateworx IRC2448V1XNXXXXXXLX 179,281 BTU ×36
PDC087V1XHXMXXXXXBLX-RH 349,564 BTU ×20
PCU065W1XQXMXXXXXBLX 272,507 BTU · Crac Unit ×10
HKC-048X-3-000-00-00-00-EC-00-RT-B 34,741 BTU · Crac Unit ×2
PCU087 349,564 BTU ×3
IRC-24 179,281 BTU · Crac Unit ×18
PCD087 349,564 BTU · Crac Unit ×10
PCU065 272,507 BTU · Crac Unit ×5
PS6CU03 34,741 BTU · Condensing Unit ×1
Ventilation
Greenheck N/A 9,000 CFM · Exhaust Fan ×24
QEI-18-I-30 6,750 CFM · Exhaust Fan ×3
10/17/2025Permit IssuedTISHMAN INTERIORS CORPAir Conditioning Systems, Heating Systems
Cooling
Climateworks PCU065 276,125 BTU ×3
PCU034 133,886 BTU · Condensing Unit ×1
Climateworx PCU034 133,886 BTU ×2
Heating
Vulcan N/A 18,000 BTU · Electric Heater ×1
10/17/2025Signed-offTISHMAN INTERIORS CORPAir Conditioning Systems, Cooling Towers, Heating and Air Conditioning Systems, Heating Systems
Cooling
Climateworx PCU087W1XQXMXXXXXTLX 349,000 BTU · Condensing Unit ×1
PS6CU05VEBTAX 59,981 BTU · Condensing Unit ×1
Climateworks PCU087W1XQXMXXXXXTLX 349,564 BTU · Condensing Unit ×1
Daikin FTX36WVJU9 59,981 BTU · Split System ×1
Heat / Cool
Trane CVHF620G55U0PE028584HBCBBA00000007E1G070L00000GA100DA 600 tons · Chiller ×3
CVHF620G55V0PE028584HBCBBA00000007E1G070L00000GA100DA 600 tons · Chiller ×1
Heating
N/A N/A 10,238 BTU · Unit Heater ×4
Cooling Tower
Spx Cooling Technologies NC8407TCS3SGF 600 tons · Cooling Tower ×3
08/07/2025Signed-offTISHMAN INTERIORS CORPAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Climateworx HKC-048X-3-000-00-00-00-EC-00-RT-B 34,470 BTU · Crac Unit ×1
Xetex XAH-16000-CW-HW-FF XAH-CW-HW-RC 403,300 BTU ×1
Heat / Cool
Mitsubishi Electric NTXSKH24A112AA PEAD-A24AA9 800 CFM · Condensing Unit ×1
TPEADA0241AA70A SUZ-KA24NAHZ 24,000 BTU · Condensing Unit ×1
Heating
Xetex XAH-16000-CW-HW-FF XAH-CW-HW-RC 498,700 BTU ×1
Ventilation
Greenheck BDF-80 750 CFM · Exhaust Fan ×1
BDF-80 SQ-120-VG-X 750 CFM · Exhaust Fan ×1
SQ-70-VG 150 CFM · Exhaust Fan ×1
SQ-80-X 200 CFM · Exhaust Fan ×1
06/09/2025Permit IssuedTISHMAN INTERIORS CORPHeating Systems
Heating
Trane RTWD250 250 tons · Chiller ×2
12/22/2022Signed-offTISHMAN INTERIORS CORPHeating Systems
Heating
8 projects · most recent 11/21/2025
Sprinkler System
FiledStatusContractorScope
11/21/2025Permit IssuedASHLAR MECHANICAL CORP—
10/17/2025Permit IssuedASHLAR MECHANICAL CORP59 heads
10/17/2025Signed-offPAR FIRE PROTECTION LLC128 heads
08/07/2025Permit IssuedASHLAR MECHANICAL CORPSprinkler System
07/24/2025Permit IssuedASHLAR MECHANICAL CORP4 heads, 4 outlets
06/25/2024Permit IssuedASHLAR MECHANICAL CORP32 heads
04/18/2024Permit IssuedASHLAR MECHANICAL CORP403 heads
12/22/2022Permit IssuedASHLAR MECHANICAL CORP—
6 projects · most recent 11/21/2025
Water/Sanitary Storm
FiledStatusContractorScope
11/21/2025Signed-offOLYMPIC PLBG & HTG SVC INWater/Sanitary
10/17/2025Signed-offPAR PLUMBING CO., INCWater/Sanitary
10/17/2025Signed-offPAR PLUMBING CO., INCWater/Sanitary
08/07/2025Signed-offOLYMPIC PLBG & HTG SVC INWater/Sanitary
07/24/2025Signed-offJCC CONSTRUCTION CORPStorm
12/22/2022Signed-offOLYMPIC PLBG & HTG SVC INStorm
25 projects · most recent 03/04/2026
General Wiring
FiledStatusContractorScope
03/04/2026Permit IssuedJAMES F. VOLPE ELEC'LGeneral Wiring
08/06/2025CompleteALLAN/BRITE-WAY ELEC'L COGeneral Wiring
07/29/2025Permit IssuedCORPORATE ELEC. GROUP INC—
07/17/2025CompleteHATZEL AND BUEHLER, INCGeneral Wiring
07/17/2025CompleteHATZEL AND BUEHLER, INCGeneral Wiring
06/23/2025CompleteHATZEL AND BUEHLER, INCGeneral Wiring
03/03/2025CompleteALLAN/BRITE-WAY ELEC'L COGeneral Wiring
11/26/2024Permit IssuedPJS ELECTRIC, INC.General Wiring
02/08/2024Permit IssuedROYAL ELEC'L CONTR'G CORPGeneral Wiring
02/08/2024Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
01/29/2024CompleteHATZEL AND BUEHLER, INCGeneral Wiring
01/29/2024CompletePJS ELECTRIC, INC.General Wiring
05/19/2023CompleteALLAN/BRITE-WAY ELEC'L CO—
05/04/2023CompleteHATZEL AND BUEHLER, INCGeneral Wiring
04/06/2023CompleteHATZEL AND BUEHLER, INC—
8 projects · most recent 11/21/2025
Steel Concrete Masonry
FiledStatusContractorScope
11/21/2025Permit IssuedASHLAR MECHANICAL CORPSteel, Concrete
10/17/2025Permit IssuedASHLAR MECHANICAL CORPSteel, Concrete, Masonry
10/17/2025Signed-offPAR FIRE PROTECTION LLCSteel, Concrete
07/24/2025Permit IssuedASHLAR MECHANICAL CORPSteel, Concrete, Masonry
01/20/2025——Steel, Concrete
06/25/2024Permit IssuedASHLAR MECHANICAL CORPSteel, Concrete, Masonry
04/18/2024Permit IssuedASHLAR MECHANICAL CORPSteel
12/22/2022Permit IssuedASHLAR MECHANICAL CORPSteel, Concrete
1 project · most recent 06/25/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/25/2025Permit IssuedH & H RESTORATION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
11/10/2025FinalEUGENE BIFULCOprogress
11/10/2025Lighting controlsEUGENE BIFULCOenergy_progress
11/10/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
11/10/2025Maintenance informationEUGENE BIFULCOenergy_progress
11/10/2025Mechanical SystemsEUGENE BIFULCOspecial
11/10/2025Interior lighting powerEUGENE BIFULCOenergy_progress
11/10/2025Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
11/10/2025MeteringEUGENE BIFULCOenergy_progress
11/10/2025Shutoff dampersEUGENE BIFULCOenergy_progress
10/20/2025Maintenance informationEUGENE BIFULCOenergy_progress
10/20/2025Mechanical SystemsEUGENE BIFULCOspecial
10/20/2025FinalEUGENE BIFULCOprogress
10/20/2025Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
10/20/2025MeteringEUGENE BIFULCOenergy_progress
10/20/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
10/20/2025Interior lighting powerEUGENE BIFULCOenergy_progress
10/20/2025Shutoff dampersEUGENE BIFULCOenergy_progress
10/20/2025Lighting controlsEUGENE BIFULCOenergy_progress
09/18/2025Maintenance informationEUGENE BIFULCOenergy_progress
09/18/2025FinalEUGENE BIFULCOprogress
09/18/2025Mechanical SystemsEUGENE BIFULCOspecial
09/18/2025Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
09/18/2025Shutoff dampersEUGENE BIFULCOenergy_progress
09/18/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
09/12/2025Post-installed AnchorsGREG BLINNspecial
Latest 25 of 150.
▾Documents — 1,397 on file (BIS + DOB NOW)
▸Plans & Drawings116
▸DOB NOWPlans/Sketch110
09/06/2026M00009252-I1Request digital key ↗
09/06/2026M00009249-I1Request digital key ↗
09/06/2026M00009249-P1Request digital key ↗
Showing 3 of 110 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00354891-I1Request digital key ↗
09/04/2026M00387713-I1Request digital key ↗
09/04/2026M00422014-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00378351-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00451479-I1Request digital key ↗
▸Applications & Permits159
▸BISPLAN / WORK APPROVAL APPLICATION85
01/06/2026140742560Open ↗
01/02/2026140742560Open ↗
12/31/2025140742560Open ↗
Showing 3 of 85 on file for this type
▸BISWORK PERMIT APPLICATION71
02/15/2022140978011Open ↗
12/03/2020140978002Open ↗
11/10/2020140938966Open ↗
Showing 3 of 71 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications421
▸DOB NOWDPL-1: Design Professional Seal & Signature113
09/04/2026M00354891-I1Open ↗
09/04/2026M00422014-I1Open ↗
09/04/2026M00451479-I1Open ↗
Showing 3 of 113 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION90
05/15/2020123922167Open ↗
Showing 1 of 90 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature79
09/28/2026M00999683-P1Open ↗
09/25/2026M00897631-P1Open ↗
09/23/2026M00734789-S4Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWProgress Inspector Seal & Signature76
09/25/2026M00897631-P1Open ↗
09/10/2026M08055658-P1Open ↗
09/02/2026M08055658-I1Open ↗
Showing 3 of 76 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
03/31/2021140978011Open ↗
03/31/2021140978011Open ↗
11/20/2020140978002Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
05/15/2020123922167Open ↗
Showing 1 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
03/31/2021140978011Open ↗
11/20/2020140978002Open ↗
10/30/2020140938966Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
03/31/2021140978011Open ↗
11/20/2020140978002Open ↗
10/30/2020140938966Open ↗
Showing 3 of 7 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
10/14/2021123257965Open ↗
11/16/2020122936671Open ↗
07/17/2020123257956Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/12/2020123241777Open ↗
07/15/2020123749694Open ↗
Showing 2 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/22/2020123751582Open ↗
07/15/2020123751582Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection61
▸DOB NOWHPD-1: Anti-Harassment Area Checklist58
09/04/2026M00451479-I1Open ↗
Showing 1 of 58 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos241
▸DOB NOWOER: Notice to Proceed59
09/04/2026M00451479-I1Open ↗
08/31/2026M08055658-I1Open ↗
Showing 2 of 59 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report53
09/04/2026M00422014-I1Open ↗
09/04/2026M00451479-I1Open ↗
09/01/2026M00772501-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWOER: Notice of Satisfaction46
09/04/2026M00451479-I1Open ↗
08/31/2026M08055658-I1Open ↗
Showing 2 of 46 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form26
09/04/2026M00354891-I1Open ↗
08/31/2026M00851014-S2Open ↗
08/31/2026M00851014-S3Open ↗
Showing 3 of 26 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
10/14/2021123257965Open ↗
12/03/2020140978002Open ↗
07/20/2020123257956Open ↗
Showing 3 of 25 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED9
03/31/2021140978011Open ↗
11/20/2020140978002Open ↗
10/30/2020140938966Open ↗
Showing 3 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION8
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
06/08/2022140978002Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
11/10/2020140938966Open ↗
09/17/2020140918005Open ↗
09/01/2020140918005Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
02/02/2022140978011Open ↗
07/13/2020123922167Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
05/15/2020123922167Open ↗
Showing 1 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
02/07/2022140919709Open ↗
10/14/2021123257821Open ↗
04/08/2021123751582Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
02/15/2022140978011Open ↗
10/14/2021123257821Open ↗
04/08/2021123751582Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
06/08/2022140978002Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
03/31/2021140978011Open ↗
11/20/2020140978002Open ↗
10/30/2020140938966Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
06/08/2022140978002Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER2
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
▸BISLIGHTING CONTROLS2
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/04/2026M00451479-I1Open ↗
▸Inspections & Test Reports42
▸BISTECHNICAL REPORT: RESPONSIBILITY29
12/31/2025140742560Open ↗
06/08/2022140978002Open ↗
02/22/2022140978011Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
06/08/2022140978002Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
02/18/2022140978011Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/18/2022140978011Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs69
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST43
01/07/2026140742560Open ↗
06/01/2023123922167Open ↗
06/16/2022140938966Open ↗
Showing 3 of 43 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/29/2020123922167Open ↗
Showing 1 of 7 on file for this type
▸BISFINAL5
01/05/2026140742560Open ↗
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership83
▸BISCOST AFFIDAVIT76
02/07/2022140919709Open ↗
10/18/2021123257821Open ↗
10/14/2021123257965Open ↗
Showing 3 of 76 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
05/18/2023123922167Open ↗
06/15/2022140938966Open ↗
06/08/2022140978002Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms93
▸BISEFILING COVER SHEET41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISBOROUGH INTAKE FORM28
05/29/2020123922167Open ↗
Showing 1 of 28 on file for this type
▸BISADDITIONAL INFORMATION17
10/13/2021123257821Open ↗
09/18/2020123900993Open ↗
08/17/2020123241777Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
03/31/2021140978011Open ↗
11/20/2020140978002Open ↗
10/30/2020140938966Open ↗
Showing 3 of 7 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/12/2020123241777Open ↗
Showing 1 of 4 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type