← Back
BuildNYC
Two stories - detached, small or mid-size
2060 BLACKROCK AVENUE
BRONX · Castle Hill-Unionport · BIN 2026009
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R5Zoning
2,134 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 5,150 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAs built PV solar system4p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Owner of 2060 Blackrock A103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Trinity Solar304/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aca Associates303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Trinity Solarspecialty_contractor303/21/2026
Redline ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jay Kavi8500304/03/2025
Building Lifecycle
04/21/2025
Signed off — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
X01142987-I1
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
04/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jay Kavi
04/04/2025
Special inspection requirement — Final
Ayracon Almaraz
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
11 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTrinity Solar11/25/2024
1 project · most recent 12/06/2024
FiledStatusContractorScope
12/06/2024CompleteRedline Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/04/2025Fire-Resistant Penetrations and JointsJay Kavispecial
04/04/2025Structural Stability – Alterations of existing buildingsJay Kavispecial
04/04/2025FinalAyracon Almarazprogress
04/04/2025Energy Code Compliance InspectionsAyracon Almarazprogress
04/04/2025Air barrier - visual inspectionAyracon Almarazenergy_progress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account