← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2061 CROTONA AVENUE
BRONX · BIN 2130820
💬 Discuss this project
2021Year Built
8Stories
D1Building Class
R7-1Zoning
18,119 sfGross Floor Area
26Units
Rent Stabilized14 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 2061 Crotona · 2,450 sf lot · 7.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPrecision Owners3 filings
Roof1p · 1 filing · 3 docs
Floor 4Temporary needle beam installation1p · 1 filing
Floor 3
Floor 2
Floor 1Installation of construction fence3 filings · 2 docs
CellarSupport of Excavation for New Building1 filing
Site & exteriorInstallation of construction fence5 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2061 Crotona203/22/2026
254 Melrose203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2021$1.2M—Private party → 2061 CROTONA LLC$69/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Automated Design Engineering509/15/2022
Ashraf403/16/2022
KNF Services Crop107/12/2021
Structural Engineering Technologies307/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nevm Expeditors1203/21/2026
Rigid Structural Design403/21/2026
Noel Building Consulting603/21/2026
Skyward Developers103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyward DevelopersGeneral Contractor907/08/2026
S&R ElectricalElectrical703/22/2026
Skyward DevelopersScaffold303/21/2026
Skyward Developersspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616509/15/2022
Automated Design Consulta895205/09/2022
Building Lifecycle
07/07/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT…
HPD violation · open
06/30/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
06/30/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS ASSEMBLY AT STAIRWAY ''A'' DOOR AT PUBLIC HALL, 4th STORY
HPD violation · closed
06/30/2026
§ 27-2043.1 hmc install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the…
HPD violation · closed
06/30/2026
§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AND A BIKE AT PUBLIC HALL, 5th STORY
HPD violation · closed
213 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSkyward Developers09/02/2022
DOB NOWMechanical SystemsSigned-offSkyward Developers05/18/2022
DOB NOWConstruction FenceSigned-offSkyward Developers07/13/2021
DOB NOWFoundationSigned-offSkyward Developers07/12/2021
DOB NOWStructuralSigned-offSkyward Developers07/12/2021
BIS—ISSUEDSkyward Developers07/19/2022
BIS—ISSUEDSkyward Developers06/13/2022
BIS—ISSUEDSkyward Developers01/26/2022
BIS—ISSUEDSkyward Developers10/13/2021
BIS—ISSUEDSkyward Developers08/12/2021
BIS—ISSUEDSkyward Developers07/19/2021
4 projects · most recent 12/05/2022
General Wiring
FiledStatusContractorScope
12/05/2022CompleteS&R ElectricalGeneral Wiring
10/21/2022CompleteStar Electrical Contractors—
11/11/2021CompleteS&R Electrical—
10/26/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/04/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/21/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
09/07/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
09/16/2022Heating SystemsFAHAD FATEHspecial
09/16/2022Mechanical SystemsFAHAD FATEHspecial
09/16/2022FinalFAHAD FATEHprogress
09/16/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
09/16/2022Shutoff dampersFAHAD FATEHenergy_progress
09/16/2022HVAC insulation and sealing FAHAD FATEHenergy_progress
09/16/2022HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/16/2022HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/16/2022Maintenance informationFAHAD FATEHenergy_progress
09/15/2022Heating SystemsFAHAD FATEHspecial
09/15/2022Mechanical SystemsFAHAD FATEHspecial
09/15/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
09/15/2022FinalFAHAD FATEHprogress
09/15/2022HVAC insulation and sealing FAHAD FATEHenergy_progress
09/15/2022Maintenance informationFAHAD FATEHenergy_progress
09/15/2022HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/15/2022HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/15/2022Shutoff dampersFAHAD FATEHenergy_progress
05/10/2022Sprinkler SystemsFAHAD FATEHspecial
05/10/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/10/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/10/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/10/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
04/15/2022Sprinkler SystemsGregory Mortmanspecial
04/15/2022Energy Code Compliance InspectionsGregory Mortmanprogress
Latest 25 of 47.
211 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account