DOB08/05/2026INSTALL APPROXIMATELY 172 LINEAR FEET OF CONSTRUCTION FENCE
ECB08/04/2026VIOLATION ISSUED FOR FAILURE TO MAINTAIN SAFETY MEASURES NO HANDRAIL SYSTEM . ATOI OBSERVED ON AN ACTIVE SITE IN THE INTERIOR NO GUARDRAIL SYSTEM ON THE STAIRCASE LEADING FROM THE FIRST FLOOR TO THE SECOND FLOO$2K due
ECB08/04/2026VIOLATION ISSUED FOR FAILURE TO MAINTAIN SAFETY MEASURES NO GUARDRAIL SYSTEM . ATOI OBSERVED ON THE SECOND FLOOR ON AN ACTIVE SITE IN THE INTERIOR NO GUARDRAIL SYSTEM AROUND AN OPENING ON THE SECOND FLOOR WHICH$2K due
ECB08/04/2026NOTED: ECB VIOLATION ISSUED FOR FTM ADEQUATE HOUSE KEEPING DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP ON THE SECOND FLOOR . CONSISTING OF A PILES OF CUT UP WOOD B$2K due
DOB08/04/2026ATOI OBSERVED WORK HAS CONTINUED WHILE ON NOTICE OF SWO ISSUED ON 07/30/2026 COMPLAINT# 3A73024. THERE ARE NO ACTIVE PERMITS TO VERIFY ANY OF THE QUESTIONABLE CONSTRUCTION WORK THAT IS UNDOCUMENTED AND UNPERMITTED. THIS POSES A UNSAFE CONDITION TO PUBLIC AND PROPERTY.
ECB07/30/2026WORK WITHOUT PERMIT: PSWO ISSUED FOR ALL GENERAL CONSTRUCTION CARPENTRY, STRUCTURAL ECT WORK BEING DONE ON THE RESIDENT. ATOI OBSERVED AT EXPO # 3 A NEWLY BUILT UNPERMITTED UNDOCUMENTED WOOD FRAMED ONE STORY HO$2K due
ECB07/30/2026C VIOLATION ISSUED FOR FAILURE TO MAINTAIN SAFETY MEASURES NO GUARDRAIL . ATOI OBSERVED AN OPENING IN THE FLOOR LEADING FROM THE FIRST TO THE BASEMENT. THERE WAS NO GUARDRAIL SYSTEM AT THE FIRST FLOOR LEVEL TO$5K due
ECB07/30/2026NOTED: ECB VIOLATION ISSUED FOR FTM ADEQUATE HOUSE KEEPING DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP IN THE BASEMENT AND ON FIRST FLOOR . CONSISTING OF A PILES O$2K due