← Back
Elevator apt, semi-fireproof with stores
2067 ANTHONY AVENUE
BRONX · BIN 2129658
💬 Discuss this project
2022Year Built
8Stories
D7Building Class
R8Zoning
23,763 sfGross Floor Area
53Units
Rent Stabilized3 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: ANTHONY RESIDENCE LLC · 5,000 sf lot · 4.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof1p · 2 filings · 6 docs
Floor 81p · 1 filing · 4 docs
Floor 71p · 1 filing · 4 docs
Floor 61p · 1 filing · 4 docs
Floor 51p · 1 filing · 4 docs
Floor 41p · 1 filing · 4 docs
Floor 31p · 1 filing · 4 docs
Floor 256p · 2 filings · 20 docs
Floor 153p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP907/08/2026
ANTHONY RESIDENCE LLC703/22/2026
PLATINUM MANAGEMENT GROUP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/17/2022$738K—— → —$31/sf building
07/18/2016$399K—OMEGA CONSTRUCTION SOLUTIONS LLC → Private party— not available
10/19/2015$180K—Private party → OMEGA CONSTRUCTION SOLUTIONS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4203/21/2026
AE DESIGN SOLUTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOLEX.GC CORPGeneral Contractor3907/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor507/08/2026
ADVANCED SOLAR SOLUTIONSGeneral Contractor303/22/2026
MPI PLUMBING CORPPlumbing207/08/2026
ISSAC STERN ARCHITECTSGeneral Contractor203/22/2026
T & T ELECTRICAL CORP.Electrical203/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68641904/02/2024
Building Lifecycle
All (192)Filed (27)Permit Issued (23)Signed Off (13)Violation (6)Inspection (13)Objection (80)Special Inspection (30)
09/02/2026
Violation issued (HPD, open)
C
09/02/2026
Violation issued (HPD, open)
A
06/03/2026
Violation issued (HPD, closed)
A
06/03/2026
Violation issued (HPD, closed)
B
06/03/2026
Violation issued (HPD, open)
A
06/16/2025
Violation issued (HPD, closed)
A
05/20/2025
Filed — Alteration
REPLACE (3) EXISTING ELECTRIC HOT WATER HEATER WITH (3) NEW GAS HWH IN EXISTING HWH ROOM, PROVIDE VENTILATION AND ADJUST EXISTING ROUGHING. PROVIDE 1 NEW OUTSIDE GAS METER
X01221057-I1
04/15/2024
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
04/15/2024
Special inspection requirement — Lowest Floor Elevation
JUAN GOMEZ
04/15/2024
Special inspection requirement — Interior lighting power
JUAN GOMEZ
04/15/2024
Special inspection requirement — Air barrier — testing
JUAN GOMEZ
04/15/2024
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
04/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
04/15/2024
Special inspection requirement — Lighting in dwelling units
JUAN GOMEZ
04/15/2024
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
04/15/2024
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
04/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
04/15/2024
Special inspection requirement — Metering
JUAN GOMEZ
04/15/2024
Special inspection requirement — Maintenance information
JUAN GOMEZ
04/15/2024
Special inspection requirement — Exterior lighting power
JUAN GOMEZ
04/15/2024
Special inspection requirement — Lighting controls
JUAN GOMEZ
04/15/2024
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
04/15/2024
Special inspection requirement — Electrical motors and elevators
JUAN GOMEZ
04/15/2024
Special inspection requirement — Fenestration areas
JUAN GOMEZ
04/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
04/15/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
04/02/2024
Filed — New Building
CONSTRUCT NEW EIGHT (8) STORY MIXED USE BUILDING AS PER PLANS FILED.
X00706075-A3
02/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2024
Signed off — New Building
CONSTRUCT NEW EIGHT (8) STORY MIXED USE BUILDING AS PER PLANS FILED.
X00706075-S1
01/11/2024
Signed off — New Building
CONSTRUCT NEW EIGHT (8) STORY MIXED USE BUILDING AS PER PLANS FILED.
X00706075-S4
12/26/2023
Signed off — New Building
CONSTRUCT NEW EIGHT (8) STORY MIXED USE BUILDING AS PER PLANS FILED.
X00706075-S5
12/20/2023
Signed off — Alteration
Installation of Sprinkler System
X00771789-I1
11/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00801565-I1
11/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08028123-I1
11/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00801574-I1
11/27/2023
Signed off — Alteration
X00711053-I1
11/03/2023
Signed off — Alteration
X00725577-I1
10/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/12/2023
Signed off — New Building
CONSTRUCT NEW EIGHT (8) STORY MIXED USE BUILDING AS PER PLANS FILED.
X00706075-S3
10/12/2023
Signed off — New Building
CONSTRUCT NEW EIGHT (8) STORY MIXED USE BUILDING AS PER PLANS FILED.
X00706075-S2
10/05/2023
Signed off — Alteration
Underground Plumbing work as per plans filed herewith
X08036357-I1
09/26/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/22/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/14/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/13/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/17/2023
Permit issued — Mechanical Systems
X00706075-S4-MS
06/20/2023
Permit issued — General Construction
X00706075-I1-GC
06/10/2023
Permit issued — General Construction
X00706075-I1-GC
03/30/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/23/2023
Objection resolved — Addressed
03/13/2023
Objection raised — Other
03/07/2023
Filed — New Building
CONSTRUCT NEW EIGHT (8) STORY MIXED USE BUILDING AS PER PLANS FILED.
X00706075-P7
03/06/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00801565-P1
02/10/2023
Permit issued — Sprinklers
X00771789-I1-EW-SP
02/03/2023
Permit issued — General Construction
X00706075-I1-GC
02/03/2023
Permit issued — General Construction
X00706075-I1-GC
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBOLEX.GC CORP08/17/2023
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP06/20/2023
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP06/10/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/10/2023
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP02/03/2023
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP02/03/2023
DOB NOWPlumbingSigned-offYG SERVICES INC01/17/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/20/2022
DOB NOWGeneral ConstructionPermit IssuedBOLEX.GC CORP12/16/2022
DOB NOWFoundationSigned-offBOLEX.GC CORP12/15/2022
DOB NOWSupport of ExcavationSigned-offBOLEX.GC CORP12/15/2022
DOB NOWStructuralSigned-offBOLEX.GC CORP12/05/2022
DOB NOWConstruction FenceSigned-offBOLEX.GC CORP12/01/2022
DOB NOWPlumbingSigned-offYG SERVICES INC11/14/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/27/2022
DOB NOWStructuralSigned-offBOLEX.GC CORP10/27/2022
DOB NOWMechanical SystemsSigned-offBOLEX.GC CORP09/16/2022
DOB NOWSupport of ExcavationSigned-offBOLEX.GC CORP09/09/2022
DOB NOWFoundationSigned-offBOLEX.GC CORP07/27/2022
DOB NOWSupport of ExcavationSigned-offBOLEX.GC CORP05/30/2022
DOB NOWFoundationSigned-offBOLEX.GC CORP05/30/2022
DOB NOWConstruction FenceSigned-offBOLEX.GC CORP05/03/2022
BISOTISSUEDADVANCED SOLAR SOLUTIONS08/08/2023
1 project · most recent 04/02/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2024Signed-offBOLEX.GC CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
General Electric AZ65H12DAD 10,200 kW · Heat Pump Outdoor ×44
Daikin RXTQ36TAVJU9 36,000 BTU · Vrf Outdoor ×2
RK09NMVJU 9,000 BTU · Condensing Unit ×2
— RXTQ48TAVJU 48,000 BTU ×2
Mitsubishi Electric MXZ-SM36NAM-U1 36,000 BTU · Heat Pump Outdoor ×2
MXZ-SM48NAM-U1 48,000 BTU · Heat Pump Outdoor ×2
Heating
General Electric AZ65H15DAD 13,400 BTU · Heat Pump Outdoor ×60
Ventilation
Renewaire HE1X1NH 650 CFM · Erv ×2
HE1XRT 500 CFM · Erv ×2
2 projects · most recent 05/20/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2025——Gas
04/02/2024Signed-offMPI PLUMBING CORPStorm, Water/Sanitary
5 projects · most recent 12/14/2023
General Wiring
FiledStatusContractorScope
12/14/2023CompleteT & T ELECTRICAL CORP.General Wiring
08/23/2023CompleteFALCO ELEC'L SERVICES INC—
01/10/2023CompleteTUXEDO ELEC'L CONTR'G INC—
11/01/2022CompleteSOLAS ELECTRICAL CORP—
06/03/2020CompleteT & T ELECTRICAL CORP.1 meters, 1 new_meters
1 project · most recent 04/02/2024
Concrete
FiledStatusContractorScope
04/02/2024Signed-offBOLEX.GC CORPConcrete
1 project · most recent 04/02/2024
Earthwork
FiledStatusContractorScope
04/02/2024Signed-offBOLEX.GC CORPEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/22/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/13/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/17/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/17/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
04/15/2024Fenestration areasJUAN GOMEZenergy_progress
04/15/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
04/15/2024Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
04/15/2024Lowest Floor ElevationJUAN GOMEZprogress
04/15/2024Fire-Resistance Rated ConstructionJUAN GOMEZprogress
04/15/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
04/15/2024Air barrier - visual inspectionJUAN GOMEZenergy_progress
04/15/2024Interior lighting powerJUAN GOMEZenergy_progress
04/15/2024Protection of exposed foundation insulationJUAN GOMEZenergy_progress
04/15/2024Maintenance informationJUAN GOMEZenergy_progress
04/15/2024Exterior lighting powerJUAN GOMEZenergy_progress
04/15/2024Lighting controlsJUAN GOMEZenergy_progress
04/15/2024MeteringJUAN GOMEZenergy_progress
04/15/2024Insulation placement and R valuesJUAN GOMEZenergy_progress
04/15/2024Electrical motors and elevatorsJUAN GOMEZenergy_progress
04/15/2024Fenestration air leakageJUAN GOMEZenergy_progress
04/15/2024Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
04/15/2024Air barrier — testing JUAN GOMEZenergy_progress
04/15/2024Lighting in dwelling unitsJUAN GOMEZenergy_progress
01/20/2023Subgrade InspectionsJUAN GOMEZspecial
01/20/2023Excavations - Sheeting, Shoring, and BracingJUAN GOMEZspecial
01/20/2023Subsurface Conditions – Fill Placement & In-Place DensityJUAN GOMEZspecial
01/18/2023Excavations - Sheeting, Shoring, and BracingJUAN GOMEZspecial
01/18/2023Subsurface Conditions – Fill Placement & In-Place DensityJUAN GOMEZspecial
01/18/2023Subgrade InspectionsJUAN GOMEZspecial
Latest 25 of 92.
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/24/2026X00711053-I1Request digital key ↗
08/24/2026X00725577-I1Request digital key ↗
08/24/2026X00744460-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
02/07/2024240332458Open ↗
11/22/2023240352006Open ↗
08/05/2023240352006Open ↗
▸BISWORK PERMIT APPLICATION1
08/08/2023240352006Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
03/05/2024240332458Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026X00706075-P1Open ↗
08/13/2026X00706075-A3Open ↗
08/13/2026X00706075-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026X00706075-P7Open ↗
08/13/2026X00706075-P1Open ↗
08/13/2026X00706075-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00706075-I1Open ↗
▸Seals & Professional Certifications119
▸DOB NOWProgress Inspector Seal & Signature59
08/31/2026X00706075-P2Open ↗
08/31/2026X00706075-P2Open ↗
08/31/2026X00706075-P2Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
08/31/2026X00706075-P2Open ↗
08/31/2026X00706075-P2Open ↗
08/31/2026X00706075-P2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/24/2026X00711053-I1Open ↗
08/24/2026X00725577-I1Open ↗
08/24/2026X00744460-P1Open ↗
Showing 3 of 27 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/05/2023240352006Open ↗
08/10/2022240332458Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/05/2023240352006Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00706075-P1Open ↗
08/13/2026X00706075-P7Open ↗
08/13/2026X00706075-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/13/2026X00706075-P4Open ↗
08/13/2026X00706075-A3Open ↗
08/13/2026X00706075-P7Open ↗
Showing 3 of 5 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
08/08/2023240352006Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
08/16/2023240332458Open ↗
▸BISSTREET TREE SIGNOFF1
03/05/2024240332458Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00706075-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00706075-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00706075-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/05/2024240352006Open ↗
08/07/2023240352006Open ↗
08/05/2023240352006Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00706075-S4Open ↗
08/13/2026X00706075-S5Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/05/2024240352006Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/05/2023240352006Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/05/2024240352006Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/05/2023240352006Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00706075-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/05/2024240352006Open ↗
08/07/2023240352006Open ↗
08/05/2023240352006Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026X00706075-S1Open ↗
08/13/2026X00706075-P5Open ↗
▸BISBPP: FIELD INSPECTION1
03/14/2024240332458Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00706075-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00706075-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/09/2024240352006Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
08/05/2023240352006Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/05/2024240352006Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
03/05/2024240332458Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
12/08/2023240352006Open ↗
08/05/2023240352006Open ↗
08/05/2023240352006Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/05/2023240352006Open ↗
08/10/2022240332458Open ↗
▸Other Documents33
▸DOB NOWProperty Ownership Certification11
08/23/2026X00706075-P1Open ↗
08/23/2026X00706075-S5Open ↗
08/23/2026X00706075-A3Open ↗
Showing 3 of 11 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION5
03/14/2024240332458Open ↗
03/14/2024240332458Open ↗
03/05/2024240332458Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026X00706075-P1Open ↗
08/13/2026X00706075-I1Open ↗
08/13/2026X00706075-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00706075-P1Open ↗
08/13/2026X00706075-P4Open ↗
08/13/2026X00706075-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/13/2026X00706075-S2Open ↗
08/13/2026X00706075-S1Open ↗
08/13/2026X00744460-I1Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/14/2024240332458Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/08/2023240332458Open ↗
▸BISTax Abatement Miscellaneous1
01/09/2024240352006Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00706075-I1Open ↗