← Back
Three families
2067 VAN HOESEN AVENUE
BRONX · Morris Park · BIN 2049342
💬 Discuss this project
1940Year Built
3Stories
C0Building Class
R4AZoning
2,331 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 2067 VAN HORSEN LLC · 2,500 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 212p · 2 filings · 16 docs
Floor 18p · 2 filings · 16 docs
Sub-Basement8p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2067 VAN HORSEN LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2021$799K—Private party → 2067 VAN HORSEN LLC$343/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC405/25/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK CONSTRUCTION MA*General Contractor303/21/2026
ZAQ CONSTRUCTION INCGeneral Contractor203/21/2026
R & T ELECTRICAL CORPElectrical103/22/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330405/25/2022
Building Lifecycle
All (42)Filed (4)Permit Issued (3)Signed Off (2)Violation (14)Inspection (7)Special Inspection (12)
06/05/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
04/03/2024
Violation issued (HPD, closed)
A
03/17/2023
Violation issued (HPD, closed)
A
08/08/2022
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 2 STORY BLDG WITH BASEMENT ONLY. INSTALL NEW INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00649576-I1
08/04/2022
Permit issued — Mechanical Systems
X00649576-I1-MS
06/14/2022
Signed off — Alteration
FILE PLUMBING WORK APPLICATOIN IN CONJUNCTION WITH ALT.
X00649604-I1
06/10/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/03/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
05/26/2022
Special inspection requirement — Mechanical Systems
Jinfar Liu
05/26/2022
Special inspection requirement — Final
Jinfar Liu
05/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
05/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
05/26/2022
Special inspection requirement — Shutoff dampers
Jinfar Liu
05/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
05/26/2022
Special inspection requirement — Interior lighting power
Jinfar Liu
05/26/2022
Special inspection requirement — Maintenance information
Jinfar Liu
05/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
05/26/2022
Special inspection requirement — Metering
Jinfar Liu
05/26/2022
Special inspection requirement — Ventilation and air distribution system
Jinfar Liu
05/25/2022
Filed — Alteration
FILE PLUMBING WORK APPLICATOIN IN CONJUNCTION WITH ALT.
X00649604-P1
05/25/2022
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 2 STORY BLDG WITH BASEMENT ONLY. INSTALL NEW INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00649576-P1
05/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
01/19/2022
Permit issued — Plumbing
X00649604-I1-PL
01/17/2022
Permit issued — General Construction
X00649576-I1-GC
01/12/2022
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 2 STORY BLDG WITH BASEMENT ONLY. INSTALL NEW INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00649576-I1
01/12/2022
Filed — Alteration
FILE PLUMBING WORK APPLICATOIN IN CONJUNCTION WITH ALT.
X00649604-I1
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/14/2017
Violation issued (HPD, closed)
I
10/31/2016
Violation issued (HPD, closed)
I
10/05/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedZAQ CONSTRUCTION INC08/04/2022
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC01/19/2022
DOB NOWGeneral ConstructionSigned-offNEW YORK CONSTRUCTION MA*01/17/2022
1 project · most recent 06/02/2022
General Wiring
FiledStatusContractorScope
06/02/2022CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/10/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/03/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/26/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
05/26/2022Mechanical SystemsJinfar Liuspecial
05/26/2022FinalJinfar Liuprogress
05/26/2022Energy Code Compliance InspectionsJinfar Liuprogress
05/26/2022HVAC-R and service water heating equipmentJinfar Liuenergy_progress
05/26/2022Shutoff dampersJinfar Liuenergy_progress
05/26/2022HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
05/26/2022Interior lighting powerJinfar Liuenergy_progress
05/26/2022Maintenance informationJinfar Liuenergy_progress
05/26/2022HVAC-R and service water heating system controlsJinfar Liuenergy_progress
05/26/2022MeteringJinfar Liuenergy_progress
05/26/2022Ventilation and air distribution systemJinfar Liuenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026X00649604-P1Request digital key ↗
08/24/2026X00649604-I1Request digital key ↗
08/24/2026X00649576-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026X00649576-P1Open ↗
08/24/2026X00649576-I1Open ↗
08/13/2026X00649604-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X00649576-I1Open ↗
08/26/2026X00649576-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X00649576-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00649576-I1Open ↗
08/24/2026X00649576-P1Open ↗
08/13/2026X00649604-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00649576-I1Open ↗