← Back
Two stories - detached, small or mid-size
207-03 36 AVENUE
QUEENS · BIN 4136240
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,300 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
2 jobs · most recent 12/18/2023
FiledStatusContractorScope
12/18/2023CompleteSUNRUN SOLAR ELECTL CORP—
12/11/2023CompleteCENTRUM ELECTRIC CORP1 meters, 1 new_meters
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/20/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00972475-I1
12/20/2023
Permit issued — Solar
Q00972475-I1-SL
12/18/2023
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00972475-I1
12/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/06/2023
Special inspection requirement — Final
Walid Abdulla
12/06/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/17/2023$990K—— → —$762/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/18/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/20/2023
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/06/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/06/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/06/2023Energy Code Compliance InspectionsWalid Abdullaprogress
12/06/2023FinalWalid Abdullaprogress
12/06/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00972475-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026Q00972475-I1Open ↗
08/22/2026Q00972475-I1Open ↗
08/22/2026Q00972475-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026Q00972475-I1Open ↗
08/22/2026Q00972475-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026Q00972475-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00972475-I1Open ↗