ECB06/05/2026DURING THE INSPECTION, IT WAS OBSERVED THAT ELECTRICAL WORK IS BEING INSTALLED THROUGHOUT THE BASEMENT WITHOUT ANY PERMITS ON FILE. THE PROJECT APPEARS TO BE APPROXIMATELY 70% COMPLETE. EXPOSED BX CABLES WERE N$2K due
Two family brick · 3,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.