← Back
Single or multiple dwelling with stores or offices
207 7 AVENUE
BROOKLYN · BIN 3025406
💬 Discuss this project
1920Year Built
4Stories
S9Building Class
R6AZoning
9,524 sfGross Floor Area
9Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: SEVENTH ON THIRD REALTY LLC · 3,150 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 14p · 2 filings · 16 docs
Cellar2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVIAN COCKTAIL GROUP807/08/2026
SEVENTH ON THIRD REALTY LLC203/22/2026
209 SEVENTH AVE REALTY303/22/2026
OWNER OF 209 7TH AVE BKLY103/22/2026
YOGURTLAND203/21/2026
209 7TH AVENUE REALTY603/21/2026
GDT MANAGEMENT103/21/2026
7TH ON THIRD REALTY703/21/2026
YOGURTLANS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAPA ARCHITECTURE PC302/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPEDITE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C & A CLARE RENOVATIONSGeneral Contractor307/08/2026
HOWARD ZAMKOFFElectrical203/21/2026
A P PLUMBING&HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHRISTOPHER V. PAPA ARCHI1663302/04/2025
Building Lifecycle
All (80)Filed (3)Permit Issued (3)Signed Off (1)Violation (60)Inspection (5)Special Inspection (8)
02/17/2026
Violation issued (FDNY_NOV, closed)
09/03/2025
Violation issued (FDNY_NOV, closed)
03/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2025
Signed off — Alteration
INSTALLATION OF NEW ELECTRIC MINI-SPLIT HEATING AND AIR CONDITIONING SYSTEM FOR EXISTING RETAIL STORE. NO CHANGE IN USE, OCCUPANCY, EGRESS, OR FLOOR AREA.
B01175694-I1
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/27/2025
Permit issued — Mechanical Systems
B01175694-I1-MS
02/04/2025
Filed — Alteration
INSTALLATION OF NEW ELECTRIC MINI-SPLIT HEATING AND AIR CONDITIONING SYSTEM FOR EXISTING RETAIL STORE. NO CHANGE IN USE, OCCUPANCY, EGRESS, OR FLOOR AREA.
B01175694-I1
02/01/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2024
Permit issued — Plumbing
B01079540-S1-PL
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2024
Permit issued — Mechanical Systems
B01079540-I1-GC-CX
07/25/2024
Filed — Alteration
PROPOSED INTERIOR BUILD-OUT OF NEW EATING & DRINKING ESTABLISHMENT AT #213 INCLUDING MINOR PARTITION WORK, INSTALLATION OF MILLWORK, PLUMBING FIXTURES, AND MINI-SPLIT HEATING AND AC UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, FLOOR AREA OR EGRESS
B01079540-S1
07/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Papa
07/24/2024
Filed — Alteration
PROPOSED INTERIOR BUILD-OUT OF NEW EATING & DRINKING ESTABLISHMENT AT #213 INCLUDING MINOR PARTITION WORK, INSTALLATION OF MILLWORK, PLUMBING FIXTURES, AND MINI-SPLIT HEATING AND AC UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, FLOOR AREA OR EGRESS
B01079540-I1
07/24/2024
Special inspection requirement — Metering
Christopher Papa
07/15/2024
Special inspection requirement — Ventilation and air distribution system
Christopher Papa
07/15/2024
Special inspection requirement — Lighting controls
Christopher Papa
07/15/2024
Special inspection requirement — Interior lighting power
Christopher Papa
07/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Papa
07/11/2024
Special inspection requirement — Mechanical Systems
Christopher Papa
07/11/2024
Special inspection requirement — Final
Christopher Papa
06/07/2024
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2022
Violation issued (HPD, closed)
I
01/19/2022
Violation issued (HPD, closed)
C
01/19/2022
Violation issued (HPD, open)
C
01/19/2022
Violation issued (HPD, open)
C
01/13/2022
Violation issued (HPD, closed)
A
01/13/2022
Violation issued (HPD, closed)
C
01/13/2022
Violation issued (HPD, closed)
A
01/13/2022
Violation issued (HPD, closed)
A
01/07/2022
Violation issued (HPD, closed)
A
01/07/2022
Violation issued (HPD, closed)
A
01/07/2022
Violation issued (HPD, closed)
B
12/23/2021
Violation issued (HPD, closed)
C
12/23/2021
Violation issued (HPD, closed)
C
12/23/2021
Violation issued (HPD, closed)
A
12/23/2021
Violation issued (HPD, closed)
A
12/23/2021
Violation issued (HPD, closed)
B
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2019
Violation issued (HPD, closed)
I
11/19/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/19/2018
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
10/24/2018
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
07/09/2014
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
10/15/2012
Violation issued (ECB, closed)
Elevators
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2005
Violation issued (ECB, closed)
Construction
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offC A CLARE RENOVATIONS02/27/2025
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC12/06/2024
DOB NOWMechanical SystemsSigned-offC A CLARE RENOVATIONS09/05/2024
BISPLISSUEDCATMAN PLUMBING INC09/20/2018
BISOTISSUEDVISION CONTRACTING NY COR08/15/2018
BISMHISSUEDCALL METRO ELEC ASSOC INC06/30/2016
BISPLISSUEDTW PLUMBING & HEATING INC03/24/2016
BISOTISSUEDPRESTIGE REMODELINE LLC03/14/2016
BISOTISSUEDPRESTIGE REMODELINE LLC01/22/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/05/2015
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR12/08/2014
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR12/10/2013
BIS—ISSUEDTRU-ART SIGN CO.,INC05/14/2013
BISOTISSUEDTRU-ART SIGN CO.INC05/14/2013
BIS—ISSUEDTRU-ART SIGN CO.,INC05/14/2013
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR11/28/2012
BISEQISSUEDSHERRI BUILDERS INC11/07/2012
BISOTISSUEDSHERRI BUILDERS INC11/07/2012
BISOTISSUEDLIVING SPACE DESIGN LLC06/26/2012
BISOTISSUEDCOSTROTTA CONST MANG.07/18/2007
BISPLISSUEDWILLIAM G IAFE INC04/04/2007
BISFPISSUEDALLIED FIRE CONTROL05/31/2005
BISPLISSUEDWILLIAM G IAFE INC05/31/2005
BISPLISSUEDWILLIAM G IAFE INC03/31/2005
BISMHISSUEDMIDCOM DEVELOPMENT CORP03/31/2005
BISPLISSUEDJOHN HLAD PLG AND HTNG08/19/1999
BISOTISSUEDBJW LLX07/29/1999
BISBLISSUEDCC CONTROLLED PLBG CO INC12/10/1997
1 project · most recent 07/25/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/25/2024Signed-offC & A CLARE RENOVATIONSHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MUZ-GGS36NA2 35,200 BTU · Heat Pump Outdoor ×1
1 project · most recent 07/25/2024
Water/Sanitary
FiledStatusContractorScope
07/25/2024Permit IssuedA P PLUMBING&HEATING INCWater/Sanitary
1 project · most recent 07/22/2024
General Wiring
FiledStatusContractorScope
07/22/2024CompleteTMF ELEC'L CONTR. INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/25/2024Tenant Protection Plan ComplianceChristopher Papaspecial
07/24/2024MeteringChristopher Papaenergy_progress
07/15/2024Ventilation and air distribution systemChristopher Papaenergy_progress
07/15/2024Lighting controlsChristopher Papaenergy_progress
07/15/2024Interior lighting powerChristopher Papaenergy_progress
07/15/2024Tenant Protection Plan ComplianceChristopher Papaspecial
07/11/2024Mechanical SystemsChristopher Papaspecial
07/11/2024FinalChristopher Papaprogress
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01079540-I1Request digital key ↗
08/24/2026B01079540-S1Request digital key ↗
08/23/2026B01175694-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION16
05/11/2018321742780Open ↗
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION15
09/24/2018321742780Open ↗
07/05/2016321319006Open ↗
04/13/2016321319006Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
04/16/2018321742780Open ↗
04/19/2016321113371Open ↗
03/16/2016321319006Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
02/13/2013320690668Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
02/13/2013320690668Open ↗
02/13/2013320690659Open ↗
02/13/2013320690677Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01079540-I1Open ↗
09/01/2026B01079540-I1Open ↗
09/01/2026B01079540-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B01175694-I1Open ↗
08/13/2026B01079540-I1Open ↗
08/13/2026B01079540-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01079540-I1Open ↗
09/01/2026B01079540-I1Open ↗
08/27/2026B01079540-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
Showing 3 of 7 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
05/06/2019321742780Open ↗
11/02/2018321742780Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
01/30/2013320561334Open ↗
12/11/2012320561334Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/13/2015321113371Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/01/2022321742780Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/01/2022321742780Open ↗
▸BISSCHEDULE B - PLUMBING1
10/18/2012320561334Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
05/14/2018321742780Open ↗
▸BISSTREET TREE CHECKLIST1
06/14/2012320493051Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01079540-I1Open ↗
08/13/2026B01079540-S1Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
06/14/2012320493051Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/30/2018321742780Open ↗
04/16/2018321742780Open ↗
07/01/2016321319006Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/03/2022321742780Open ↗
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
04/19/2016321113371Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
12/27/2013320690677Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/03/2022321742780Open ↗
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST5
12/27/2013320690668Open ↗
12/27/2013320690677Open ↗
12/27/2013320690659Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/27/2015321113371Open ↗
02/13/2013320690668Open ↗
02/13/2013320690659Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/13/2013320690677Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
05/30/2018321742780Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET9
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION3
02/25/2019321742780Open ↗
03/05/2015320561334Open ↗
02/02/2015320561334Open ↗