← Back
One family attached or semi-detached
207 DOVER STREET
BROOKLYN · BIN 3428563
💬 Discuss this project
2020Year Built
2Stories
A5Building Class
R3-1Zoning
2,855 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 3,100 sf lot · 0.92 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2019$1.6M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENGINEERING PROFESSIONAL SERVICE P.702/22/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
T.G. NEW YORK CONSTRUCTORGeneral Contractor507/08/2026
ENGINEERING PROFESSIONAL SERVICEGeneral Contractor403/22/2026
DMITRIY PORTNOVElectrical103/21/2026
AP ELECTL SER MAIN INC 004925General Contractor103/22/2026
GW MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING PROFESSIONAL6393502/22/2021
Building Lifecycle
All (47)Filed (7)Permit Issued (4)Signed Off (4)Violation (2)Inspection (1)Special Inspection (29)
01/25/2022
Signed off — Alteration
B00220084-I1
01/22/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/20/2022
Signed off — Alteration
SUBSEQUENT MECHANICAL WORK FILING IN CONJUNCTION WITH NEW BUILDING APPLICATION 321982707.
B00204836-I1
01/19/2022
Signed off — Alteration
Requesting PAA Document 03 Job # B00204832-I1 to change plumbing drawing, A old drawing no. PL-001.01. A new drawing no. PL-001.02.
B00204832-I1
01/11/2022
Signed off — Alteration
B00204184-I1
01/10/2022
Permit issued — Mechanical Systems
B00204836-I1-MS
01/05/2022
Permit issued — Structural
B00204184-I1-ST
12/29/2021
Permit issued — Curb Cut
B00220084-I1-CC
04/06/2021
Violation issued (ECB, closed)
Construction
02/22/2021
Filed — Alteration
Requesting PAA Document 03 Job # B00204832-I1 to change plumbing drawing, A old drawing no. PL-001.01. A new drawing no. PL-001.02.
B00204832-P2
02/22/2021
Special inspection requirement — HVAC and service water heating system controls
OLEG RUDITSER
02/22/2021
Special inspection requirement — HVAC and service water heating equipment
OLEG RUDITSER
02/22/2021
Special inspection requirement — HVAC insulation and sealing
OLEG RUDITSER
02/22/2021
Special inspection requirement — Electrical energy consumption
OLEG RUDITSER
02/22/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
OLEG RUDITSER
02/22/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
OLEG RUDITSER
02/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
01/22/2021
Special inspection requirement — HVAC and service water heating system controls
OLEG RUDITSER
01/22/2021
Special inspection requirement — HVAC insulation and sealing
OLEG RUDITSER
01/22/2021
Special inspection requirement — Shutoff dampers
OLEG RUDITSER
01/22/2021
Special inspection requirement — Electrical energy consumption
OLEG RUDITSER
01/22/2021
Special inspection requirement — Smoke Control Systems Testing
OLEG RUDITSER
01/22/2021
Special inspection requirement — Heating Systems
OLEG RUDITSER
01/22/2021
Special inspection requirement — Mechanical Systems
OLEG RUDITSER
01/22/2021
Special inspection requirement — Final
Leonid Kuzmin
01/22/2021
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
01/22/2021
Special inspection requirement — HVAC and service water heating equipment
OLEG RUDITSER
01/22/2021
Special inspection requirement — Maintenance information
OLEG RUDITSER
01/19/2021
Filed — Alteration
SUBSEQUENT MECHANICAL WORK FILING IN CONJUNCTION WITH NEW BUILDING APPLICATION 321982707.
B00204836-P1
01/19/2021
Filed — Alteration
Requesting PAA Document 03 Job # B00204832-I1 to change plumbing drawing, A old drawing no. PL-001.01. A new drawing no. PL-001.02.
B00204832-P1
01/18/2021
Special inspection requirement — Maintenance information
01/18/2021
Special inspection requirement — HVAC insulation and sealing
01/18/2021
Special inspection requirement — HVAC and service water heating system controls
01/18/2021
Special inspection requirement — Shutoff dampers
01/18/2021
Special inspection requirement — HVAC and service water heating equipment
01/18/2021
Special inspection requirement — Electrical energy consumption
01/18/2021
Special inspection requirement — Final
01/18/2021
Special inspection requirement — Energy Code Compliance Inspections
01/18/2021
Special inspection requirement — Smoke Control Systems Testing
01/18/2021
Special inspection requirement — Mechanical Systems
01/18/2021
Special inspection requirement — Heating Systems
10/26/2020
Permit issued — Plumbing
B00204832-I1-PL
07/22/2020
Violation issued (ECB, closed)
Construction
09/02/2019
Filed — Alteration
B00220084-I1
08/08/2019
Filed — Alteration
SUBSEQUENT MECHANICAL WORK FILING IN CONJUNCTION WITH NEW BUILDING APPLICATION 321982707.
B00204836-I1
08/08/2019
Filed — Alteration
Requesting PAA Document 03 Job # B00204832-I1 to change plumbing drawing, A old drawing no. PL-001.01. A new drawing no. PL-001.02.
B00204832-I1
08/08/2019
Filed — Alteration
B00204184-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJ.GOLD CONSTRUCTION CONS01/10/2022
DOB NOWStructuralSigned-offJ.GOLD CONSTRUCTION CONS01/05/2022
DOB NOWCurb CutSigned-offJ.GOLD CONSTRUCTION CONS12/29/2021
DOB NOWPlumbingSigned-offGW MECHANICAL CORP10/26/2020
BIS—ISSUEDT.G. NEW YORK CONSTRUCTOR12/09/2021
BIS—ISSUEDT.G. NEW YORK CONSTRUCTOR12/18/2020
BIS—ISSUEDT.G. NEW YORK CONSTRUCTOR03/13/2020
BIS—ISSUEDT.G. NEW YORK CONSTRUCTOR03/13/2020
1 project · most recent 10/19/2020
General Wiring
FiledStatusContractorScope
10/19/2020CompleteAP ELECTL SER & MAIN INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/22/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
02/22/2021HVAC and service water heating system controls OLEG RUDITSERenergy_progress
02/22/2021HVAC and service water heating equipment OLEG RUDITSERenergy_progress
02/22/2021HVAC insulation and sealing OLEG RUDITSERenergy_progress
02/22/2021Electrical energy consumptionOLEG RUDITSERenergy_progress
02/22/2021Subsurface Investigations (Borings/Test Pits)OLEG RUDITSERspecial
02/22/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationOLEG RUDITSERspecial
02/22/2021Fire-Resistant Penetrations and JointsOLEG RUDITSERspecial
01/22/2021HVAC and service water heating system controls OLEG RUDITSERenergy_progress
01/22/2021HVAC insulation and sealing OLEG RUDITSERenergy_progress
01/22/2021Shutoff dampersOLEG RUDITSERenergy_progress
01/22/2021Electrical energy consumptionOLEG RUDITSERenergy_progress
01/22/2021Smoke Control Systems TestingOLEG RUDITSERspecial
01/22/2021Heating SystemsOLEG RUDITSERspecial
01/22/2021Mechanical SystemsOLEG RUDITSERspecial
01/22/2021FinalLeonid Kuzminprogress
01/22/2021Energy Code Compliance InspectionsOLEG RUDITSERprogress
01/22/2021HVAC and service water heating equipment OLEG RUDITSERenergy_progress
01/22/2021Maintenance informationOLEG RUDITSERenergy_progress
01/18/2021Maintenance information—energy_progress
01/18/2021HVAC insulation and sealing —energy_progress
01/18/2021HVAC and service water heating system controls —energy_progress
01/18/2021Shutoff dampers—energy_progress
01/18/2021HVAC and service water heating equipment —energy_progress
01/18/2021Electrical energy consumption—energy_progress
01/18/2021Final—progress
Latest 25 of 29.
▾Documents — 149 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00204832-I1Request digital key ↗
08/15/2026B00204832-P2Request digital key ↗
08/15/2026B00204832-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00204836-I1Request digital key ↗
08/15/2026B00204836-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00220084-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00204184-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION11
07/12/2022321982707Open ↗
06/22/2022321982707Open ↗
06/17/2022321982707Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION4
03/18/2020321982707Open ↗
03/18/2020321982707Open ↗
03/18/2020321982707Open ↗
Showing 3 of 4 on file for this type
▸BISGARAGE APPLICATION1
08/03/2022321982707Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISFLOOD ZONE COMPLIANCE2
07/25/2022321982707Open ↗
06/30/2022322014547Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/20/2021322014547Open ↗
▸BISVERIFY TAX LOT1
06/03/2022321982707Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/19/2019321982707Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/25/2022321982707Open ↗
▸BISZONING DIAGRAM1
02/10/2020321982707Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/22/2019321982707Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026B00204836-I1Open ↗
08/31/2026B00204836-I1Open ↗
08/31/2026B00204836-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B00204836-I1Open ↗
08/13/2026B00204832-P2Open ↗
08/13/2026B00204832-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B00204836-I1Open ↗
08/31/2026B00204836-I1Open ↗
08/31/2026B00204836-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/09/2020321982707Open ↗
03/09/2020321982707Open ↗
11/29/2019322014547Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/25/2022321982707Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/25/2022321982707Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
11/29/2019322014547Open ↗
10/24/2019321982707Open ↗
08/07/2019321982707Open ↗
▸BISSTREET TREE SIGNOFF2
07/25/2022321982707Open ↗
06/30/2022322014547Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/30/2022322014547Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/18/2020321982707Open ↗
03/09/2020321982707Open ↗
11/29/2019322014547Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/25/2022321982707Open ↗
06/30/2022322014547Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/05/2022321982707Open ↗
06/03/2022321982707Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/25/2022321982707Open ↗
▸BISINTERIOR LIGHTING POWER1
07/25/2022321982707Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/03/2022321982707Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
07/25/2022321982707Open ↗
▸BIS* DUCT LEAKAGE TESTING1
07/25/2022321982707Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/25/2022321982707Open ↗
▸BISFENESTRATION AREAS1
07/25/2022321982707Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/25/2022321982707Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/25/2022321982707Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/25/2022321982707Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/25/2022321982707Open ↗
▸Inspections & Test Reports19
▸DOB NOWSOIL REPORT3
08/13/2026B00204832-I1Open ↗
08/13/2026B00204832-P1Open ↗
08/13/2026B00204832-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/05/2022321982707Open ↗
06/03/2022321982707Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
08/05/2022321982707Open ↗
03/09/2020321982707Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/25/2022321982707Open ↗
07/25/2022321982707Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/25/2022321982707Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
08/03/2022321982707Open ↗
▸BISBPP: FIELD INSPECTION1
06/30/2022322014547Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/25/2022321982707Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/25/2022321982707Open ↗
▸BISMASONRY1
07/25/2022321982707Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/25/2022321982707Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
08/07/2019321982707Open ↗
▸BISMECHANICAL SYSTEMS1
07/25/2022321982707Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00204832-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE7
07/12/2022321982707Open ↗
07/12/2022321982707Open ↗
06/22/2022321982707Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/20/2021322014547Open ↗
▸BISBPP: FINAL SIGNOFF1
06/30/2022322014547Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
07/25/2022321982707Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
07/25/2022321982707Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/29/2019322014547Open ↗
08/07/2019321982707Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION10
08/05/2022321982707Open ↗
07/19/2022321982707Open ↗
08/19/2021321982707Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET2
11/29/2019322014547Open ↗
08/07/2019321982707Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION2
07/20/2021322014547Open ↗
07/20/2021322014547Open ↗
▸BISLOWEST FLOOR ELEVATION1
07/25/2022321982707Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/07/2019321982707Open ↗
▸BISMAINTENANCE INFORMATION1
07/25/2022321982707Open ↗
▸BISPERMANENT CERTIFICATE1
07/25/2022321982707Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
06/30/2022322014547Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/25/2022321982707Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
07/25/2022321982707Open ↗
▸BISPLOT DIAGRAM1
08/07/2019321982707Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
10/22/2019321982707Open ↗