ECB10/01/2021Failure to submit an acceptable required cycle 8B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#810020.remedy:submit acceptable requireNothing owed — awaiting certificate of correction
ECB08/30/2018Failure to maintain external building walls and appurtenances. Note: exp #3 west elevation: cracks and spalling mortar joints at 7TH fl lintel, northwest corner of building; bulging defective ac grill on the 8TNothing owed — awaiting certificate of correction
ECB06/20/2016*05N10,100M07,16B11,37Q03,67X10,14J01,42M07,69M07,59Y02,17H11,17D06,70D06. *CLASS1 item; 05N-bypssed/disbled zone lock restrictor; 100M-in case of fire signage in lobby; 16B-provide per () need lobby braille taNothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB02/24/2017Violation issued for failure to file annual boiler 2015 inspection reportThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB12/01/2016Violation issued to elevator-failure to file category 1 2015 inspection/testThe owner has filed since: Category 1 elevator reports are on file for later years (latest 2025). This one is not shown as answered
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB01/31/2019Cycle 8B nrfIssued 2019; DOB's record still lists it as active
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Cymidium Development · 16,226 sf lot · 1.91 FAR built · Flood zone X