Elevator apt, semi-fireproof with stores
2070 CLINTON AVENUE
BRONX · BIN 2012652
💬 Discuss this project
1977Year Built
14Stories
D7Building Class
R7-1Zoning
191,685 sfGross Floor Area
224Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: NYC Housing Authority · 58,630 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsFacade and window replacementUnder Construction1 filing
RoofTWIN PARKS EAST (Site 9)Under Construction14p · 5 filings
BulkheadTWIN PARKS EAST (Site 9)2p · 1 filing · 9 docs
Floor 1Twin Parks East Bld2 filings
CellarBronx Housing Presevation ExperienceUnder Construction5p · 2 filings
Site & exteriorNew York City Housing Authority4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority8909/13/2026
NYC Department of Housing Preservation and Development403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aufgang Architects1008/14/2026
Robert Germain Jr. PE605/01/2026
Babylon Eco-Construction101/13/2026
Ame Services108/19/2025
Wellworth Consulting107/29/2025
Bitopi Consultants608/28/2024
AK Consulting Services508/28/2024
RO Engineers & Architects202/08/2024
Joel Phagoo P.E308/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J Professional Expediting1603/21/2026
AK Consulting Services2403/21/2026
LGML Group203/21/2026
Ame Services203/21/2026
United Safety Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vikrant Contracting & BuilderScaffold1007/08/2026
P & K ContractingGeneral Contractor707/08/2026
Chateau GCGeneral Contractor607/29/2026
MNK EnterprisesScaffold603/21/2026
Spring ScaffoldingScaffold507/08/2026
Roma ScaffoldingScaffold507/08/2026
A & C Heating ServicesPlumbing407/08/2026
A & C Heating Servicesspecialty_contractor204/09/2026
Emes SolarGeneral Contractor105/29/2026
Shelby ElectricalElectrical103/21/2026
B.P. ElectricElectrical103/21/2026
WCK ElectricElectrical103/21/2026
Mac Fhionnghaile & SonsElectrical103/22/2026
Pappas & Fodera Elect'lElectrical103/21/2026
Bernardi ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803405/19/2026
Robert F. Germain Jr. PE5100605/01/2026
Babylon Eco-Construction9687101/13/2026
AK Consulting Services, I6198103/12/2024
Tectonic Engineering Cons106108/01/2022
Joel Phagoo, PE2416108/11/2020
Building Lifecycle
All (198)Filed (37)Permit Issued (34)Signed Off (15)Facade (FISP) (16)Violation (60)Inspection (6)Special Inspection (30)
10/05/2026
Signed off — Alteration
MODERATE TENANT IN PLACE INTERIOR APARTMENT RENOVATION TO INCLUDE THE REMOVAL AND REPLACEMENT OF KITCHEN CABINETS, COUNTERTOPS AND APPLIANCES. NEW APARTMENT LIGHT FIXTURE, FINISHES AND WINDOWS. ALL PUBLIC CORRIDORS AND SERVICE AREAS WILL BE RENOVATED
X01047044-S3
09/18/2026
Signed off — Alteration
X01267419-I1
08/18/2026
Special inspection requirement — Metering
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/18/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
08/14/2026
Filed — Alteration
MODERATE TENANT IN PLACE INTERIOR APARTMENT RENOVATION TO INCLUDE THE REMOVAL AND REPLACEMENT OF KITCHEN CABINETS, COUNTERTOPS AND APPLIANCES. NEW APARTMENT LIGHT FIXTURE, FINISHES AND WINDOWS. ALL PUBLIC CORRIDORS AND SERVICE AREAS WILL BE RENOVATED
X01047044-P4
08/07/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
08/07/2026
Special inspection requirement — Metering
SAMI HAJJAR P.E
08/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
08/07/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/28/2026
Permit issued — Mechanical Systems
X01047044-S1-MS
07/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT CLINTON AVENUE, EAST 180TH STREET, OAKLAND PLACE ELEVATIONS.
X01228210-I1
06/22/2026
Signed off — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILER. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193273-S1
06/22/2026
Signed off — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILER. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193273-S2
06/22/2026
Signed off — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILER. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193273-I1
06/04/2026
Permit issued — General Construction
X01047044-I1-GC
06/03/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
06/03/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
06/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/03/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/03/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
05/20/2026
Permit issued — Sidewalk Shed
X01228210-I1-SH
05/19/2026
Filed — Alteration
MODERATE TENANT IN PLACE INTERIOR APARTMENT RENOVATION TO INCLUDE THE REMOVAL AND REPLACEMENT OF KITCHEN CABINETS, COUNTERTOPS AND APPLIANCES. NEW APARTMENT LIGHT FIXTURE, FINISHES AND WINDOWS. ALL PUBLIC CORRIDORS AND SERVICE AREAS WILL BE RENOVATED
X01047044-P3
05/12/2026
Permit issued — General Construction
X01047044-S3-GC
05/12/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
05/02/2026
Permit issued — Solar
X01296404-I1-SL
05/01/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILER. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193273-P3
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
05/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
04/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
04/28/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILER. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193273-P2
04/28/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILER. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193273-P1
03/02/2026
Permit issued — Sidewalk Shed
X01228210-I1-SH
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/02/2026
Violation issued (HPD, closed)
B
02/02/2026
Violation issued (HPD, closed)
B
02/02/2026
Violation issued (HPD, closed)
B
02/02/2026
Violation issued (HPD, closed)
C
02/02/2026
Violation issued (HPD, closed)
B
Latest 60 of 198 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedChateau GC07/28/2026
DOB NOWGeneral ConstructionPermit IssuedChateau GC06/04/2026
DOB NOWSidewalk ShedSigned-offSpring Scaffolding05/20/2026
DOB NOWGeneral ConstructionSigned-offChateau GC05/12/2026
DOB NOWSolarPermit IssuedEmes Solar05/02/2026
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/02/2026
DOB NOWPlumbingSigned-offDMC Plumbing & Heating01/27/2026
DOB NOWGeneral ConstructionSigned-offA & C Heating Services01/27/2026
DOB NOWBoiler EquipmentSigned-offDMC Plumbing & Heating01/27/2026
DOB NOWSuspended ScaffoldSigned-offYash & B Construction12/17/2025
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co08/27/2025
DOB NOWSuspended ScaffoldSigned-offYash & B Construction08/20/2025
DOB NOWGeneral ConstructionSigned-offA & C Heating Services08/05/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding07/30/2025
DOB NOWGeneral ConstructionPermit IssuedChateau GC06/06/2025
DOB NOWPlumbingSigned-offDMC Plumbing & Heating06/03/2025
DOB NOWBoiler EquipmentSigned-offDMC Plumbing & Heating06/03/2025
DOB NOWGeneral ConstructionSigned-offP & K Contracting04/02/2025
DOB NOWSuspended ScaffoldSigned-offD&N Construction & Consultng04/01/2025
DOB NOWGeneral ConstructionSigned-offP & K Contracting04/01/2025
DOB NOWStructuralSigned-offP & K Contracting04/03/2024
DOB NOWStructuralSigned-offP & K Contracting04/03/2024
DOB NOWSuspended ScaffoldSigned-offD&N Construction & Consultng03/26/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/29/2024
DOB NOWConstruction FenceSigned-offMNK Enterprises02/29/2024
DOB NOWSupported ScaffoldSigned-offVikrant Contracting & Builders04/16/2021
DOB NOWConstruction FenceSigned-offVikrant Contracting & Builders04/16/2021
DOB NOWSidewalk ShedSigned-offVikrant Contracting & Builders04/15/2021
DOB NOWSupported ScaffoldSigned-offVikrant Contracting & Builders08/12/2020
DOB NOWSidewalk ShedSigned-offRoma Scaffolding07/30/2020
DOB NOWSidewalk ShedSigned-offVikrant Contracting & Builders04/10/2020
DOB NOWConstruction FenceSigned-offVikrant Contracting & Builders04/03/2020
DOB NOWSidewalk ShedSigned-offRoma Scaffolding11/06/2019
DOB NOWSidewalk ShedSigned-offRoma Scaffolding11/14/2018
BISOTISSUEDVikrant Contracting & Builder07/01/2021
BISOTISSUEDVikrant Contracting & Builder04/14/2021
BISOTISSUEDVikrant Contracting & Builder10/13/2020
BISOTISSUEDVikrant Contracting & Builder08/13/2020
BISFPISSUEDAllied Fire Control Services05/02/2018
BISPLISSUEDBelco Associates10/17/2017
+ 14 more permits on file
1 project · most recent 08/14/2026
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026Permit IssuedChateau GCGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
__Junk__ ARNU483B8A4 54,200 BTU · Fan Coil Indoor ×4
Lg ARUM096BTE5 108,000 BTU · Vrf Outdoor ×2
Ventilation
Energywall U-ERV-1200 1,200 CFM · Erv ×1
Generators
Rehlko 250RE0ZJE 255 kW · Generator ×1
2 projects · most recent 08/14/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/14/2026——Water/Sanitary
05/01/2026Signed-offA & C Heating ServicesGas
13 projects · most recent 04/16/2026
General Wiring Boiler Controls
FiledStatusContractorScope
04/16/2026CompleteSTX ElectricalBoiler Controls
01/13/2026Permit IssuedB.P. Electric—
12/15/2025Permit IssuedShelby ElectricalGeneral Wiring
11/22/2025Permit IssuedBernardi ElectricGeneral Wiring
09/16/2025CompleteMac Fhionnghaile & SonsGeneral Wiring
05/15/2025CompleteTop Shelf Electric—
04/23/2024CompleteLit Mode Electrical Contg—
03/06/2024CompleteLit Mode Electrical Contg—
03/06/2024CompleteLit Mode Electrical Contg—
06/02/2020Permit IssuedRaiden Electric—
06/02/2020Permit IssuedRaiden Electric—
03/25/2020Permit IssuedRaiden Electric—
11/05/2018CompleteUSA Elect'l Services—
1 project · most recent 01/13/2026
FiledStatusContractorScope
01/13/2026Permit IssuedEmes Solar394 panels, 204.88 kw, 13,596 roof_area_sqft
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/03/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
08/18/2026Tenant Protection Plan Compliance—special
08/18/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
08/18/2026MeteringSAMI HAJJAR P.Eenergy_progress
08/18/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
08/18/2026FinalSAMI HAJJAR P.Eprogress
08/18/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/07/2026FinalSAMI HAJJAR P.Eprogress
08/07/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
08/07/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
08/07/2026Tenant Protection Plan Compliance—special
08/07/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/07/2026MeteringSAMI HAJJAR P.Eenergy_progress
06/03/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
06/03/2026Wall Panels, Curtain Walls, and VeneersSAMI HAJJAR P.Especial
06/03/2026Tenant Protection Plan Compliance—special
06/03/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
06/03/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
06/03/2026FinalSAMI HAJJAR P.Eprogress
06/03/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/12/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
05/12/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
05/12/2026FinalSAMI HAJJAR P.Eprogress
05/12/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/12/2026Wall Panels, Curtain Walls, and VeneersSAMI HAJJAR P.Especial
05/12/2026Tenant Protection Plan Compliance—special
Latest 25 of 75.
▾Documents — 275 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch34
08/26/2026X00098020-I1Request digital key ↗
08/21/2026X00780617-I1Request digital key ↗
08/21/2026X00780617-P1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026X00337955-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00337951-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00382949-I1Request digital key ↗
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION9
08/13/2020240262504Open ↗
05/03/2018220140826Open ↗
10/23/2017220140826Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/08/2019240262504Open ↗
09/14/2015220420408Open ↗
10/09/2014220408388Open ↗
Showing 3 of 8 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
08/13/2020240262504Open ↗
▸Seals & Professional Certifications94
▸DOB NOWDPL-1: Design Professional Seal & Signature35
08/26/2026X00098020-I1Open ↗
08/26/2026X00337955-I1Open ↗
08/26/2026X00382949-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
10/04/2026X01047044-P2Open ↗
10/04/2026X01047044-P2Open ↗
09/30/2026X00382949-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/30/2026X00382949-I1Open ↗
09/21/2026X01193273-S2Open ↗
09/21/2026X01193273-S2Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
10/09/2014220408388Open ↗
02/13/2013220044985Open ↗
01/16/2013220044985Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/16/2013220044985Open ↗
05/04/2010220060038Open ↗
05/03/2010220060029Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/04/2010220060038Open ↗
05/03/2010220060029Open ↗
01/12/2010220044985Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/08/2019240262504Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/08/2019240262504Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/08/2019240262504Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
04/28/2012220140826Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/10/2018220420408Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
08/13/2026X00382949-I1Open ↗
08/13/2026X00337951-I1Open ↗
08/13/2026X00337955-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/08/2019240262504Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/17/2026X01296404-I1Open ↗
08/16/2026X01193273-P3Open ↗
08/16/2026X01193273-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/14/2015220420408Open ↗
10/09/2014220408388Open ↗
04/28/2012220140826Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/04/2010220060038Open ↗
01/15/2010220044985Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/28/2012220140826Open ↗
05/03/2010220060029Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
08/13/2020240262504Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/08/2019240262504Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0578BX201
06/03/2022240262504Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026X00780617-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/01/2022240262504Open ↗
03/31/2022240262504Open ↗
08/12/2020240262504Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/01/2022240262504Open ↗
03/31/2022240262504Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/08/2019240262504Open ↗
▸BISNYCECC ANALYSIS1
10/08/2019240262504Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00780617-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/01/2022240262504Open ↗
03/31/2022240262504Open ↗
08/12/2020240262504Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs52
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter35
08/21/2026X01011799-P4Open ↗
08/21/2026X01011799-P3Open ↗
08/21/2026X01011799-P2Open ↗
Showing 3 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
02/13/2013220044985Open ↗
04/28/2012220140826Open ↗
03/23/2012220060029Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/03/2022240262504Open ↗
01/18/2018220420408Open ↗
02/13/2013220044985Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/28/2012220140826Open ↗
05/04/2010220060038Open ↗
05/03/2010220060029Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER1
02/22/2011220060038Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026X01296404-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X00780617-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
06/01/2022240262504Open ↗
03/31/2022240262504Open ↗
10/08/2019240262504Open ↗
Showing 3 of 8 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT2
05/14/2010220060038Open ↗
05/13/2010220060029Open ↗
▸BISLL58-88 CIVIL PENALTY AFFIDAVIT1
02/08/2010220044985Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
09/14/2015220420408Open ↗
10/09/2014220408388Open ↗
04/28/2012220140826Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
02/05/2013220044985Open ↗
01/16/2013220044985Open ↗
▸BISeFiling Job Application Cover Sheet2
05/03/2010220060029Open ↗
10/08/2019240262504Open ↗
▸BISBOROUGH INTAKE FORM1
01/18/2018220420408Open ↗
▸Other Documents7
▸DOB NOWCalculations3
08/13/2026X01019099-I1Open ↗
08/13/2026X01276249-I1Open ↗
08/13/2026X01267419-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026X01276249-I1Open ↗
08/13/2026X01267419-I1Open ↗
08/13/2026X01019099-I1Open ↗
▸BISSupporting Document: Fee Exempt1
08/09/2010220044985Open ↗