← Back
Predominantly retail with other uses
2070 JEROME AVENUE
BRONX · BIN 2013959
💬 Discuss this project
1920Year Built
1Stories
K4Building Class
R7AZoning
11,600 sfGross Floor Area
7Units
1 Open Violation ▸
Predominantly retail with other uses · Owner of record: 2070 JEROME AVE REALTY LLC · 11,625 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 5 filings · 20 docs
Floor 231p · 5 filings · 20 docs
Floor 131p · 4 filings · 20 docs
Cellar26p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1539-1547 PITKIN AVE REALTY8807/08/2026
UGB CONSTRUCTION2103/22/2026
2070 JEROME AVE REALTY LL203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2021$2.9M—C.E.A. COMPANY, LLC → 2070 JEROME AVE REALTY LLC$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DANIEL K. MULLIN, ARCHITECT208/05/2026
OMF ARCHITECT PC702/04/2026
NV5212/03/2025
MURDOCH ENGINEERING511/04/2025
UNISOLAR110/10/2025
APPLIED HVAC ENGINEERING, PLLC708/09/2025
ASHRAF CORP203/03/2023
MOSTAFA411/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TREASURE BOX SERVICES3603/21/2026
UNIVERSAL SIGNS SERVICE1003/21/2026
EC BUILDING CONSULTANTS403/21/2026
EC BUILDING CONSULTANTS, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGB CONSTRUCTION INCGeneral Contractor3407/08/2026
UNIVERSAL SIGNS SVCScaffold407/08/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
CASE PLUMBING LLCFire Protection107/04/2026
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
REAL POWER ELECTRIC INCElectrical103/22/2026
UNIVERSAL SIGNS SVCGeneral Contractor104/09/2026
EXPERT PLUMBING & HEATINGPlumbing107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
PLBG P & H INCPlumbing107/08/2026
GABE CONSTRUCTION AND DEVELOPGeneral Contractor104/09/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SJS INSPECTIONS AND CONSU82861502/04/2026
G ENGINEERING PC7778112/03/2025
CENTURION SOLAR ENERGY LL9475110/10/2025
SYED ENGINEERING, P.C.7054103/03/2023
OMF ARCHITECTS PC5900103/31/2021
Building Lifecycle
All (216)Filed (29)Permit Issued (26)Signed Off (12)Violation (19)Inspection (20)Objection (80)Special Inspection (30)
08/26/2026
Objection resolved — Addressed
08/25/2026
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM TO BE IN COMPLIANCE WITH NFPA 13 AND CITY RULES AND REGULATIONS. NO CHANGE TO OCCUPANCY USE OR EGRESS.
X01286444-S2
08/24/2026
Objection raised — Other
08/05/2026
Filed — No Work
X01277424-I1
07/28/2026
Violation issued (ECB, open)
Elevators
07/06/2026
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM TO BE IN COMPLIANCE WITH NFPA 13 AND CITY RULES AND REGULATIONS. NO CHANGE TO OCCUPANCY USE OR EGRESS.
X01286444-S1
07/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/02/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/11/2026
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR PLANET FITNESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01303236-I1
06/11/2026
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR PLANET FITNESS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01304514-I1
06/11/2026
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR PLANET FITNESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01288971-I1
06/11/2026
Signed off — Alteration
X01304509-I1
06/11/2026
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR PLANET FITNESS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01303285-I1
06/04/2026
Permit issued — Solar
X01270164-I1-SL
05/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Objection resolved — Resolved
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Fenestration air leakage
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Interior lighting power
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Masonry
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Lighting controls
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Metering
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Fenestration areas
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Electrical motors and elevators
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Permanent certificate
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Air barrier — testing
SERGEY BOLOTOV
03/11/2026
Special inspection requirement — Protection of exposed foundation insulation
SERGEY BOLOTOV
03/10/2026
Objection resolved — Addressed
03/05/2026
Objection raised — Other
03/04/2026
Objection resolved — Addressed
02/19/2026
Objection raised — Other
02/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/04/2026
Filed — Alteration CO
Proposed EXTENSION AT REAR AT 1ST FLOOR AND 2ND floor addition, new certificate of occupancy. Plumbing, mechanical and structural work to be filed separately.
X00632224-P4
12/22/2025
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Masonry
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Metering
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Lighting controls
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Interior lighting power
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Air barrier — testing
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Fenestration air leakage
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Electrical motors and elevators
SERGEY BOLOTOV
12/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY BOLOTOV
12/17/2025
Permit issued — Sprinklers
X01286444-S2-EW-SP
12/10/2025
Objection resolved — Addressed
12/03/2025
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM TO BE IN COMPLIANCE WITH NFPA 13 AND CITY RULES AND REGULATIONS. NO CHANGE TO OCCUPANCY USE OR EGRESS.
X01286444-S2
11/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/11/2025
Objection resolved — Addressed
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedCENTURION SOLAR ENERGY06/04/2026
DOB NOWSprinklersSigned-offS & L PLUMBING INC12/17/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG11/10/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC11/06/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC11/06/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC11/06/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC11/06/2025
DOB NOWGeneral ConstructionSigned-offGABE CONSTRUCTION AND DEV09/26/2025
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC05/30/2025
DOB NOWPlumbingSigned-offEXPERT PLUMBING & HEATING04/15/2025
DOB NOWGeneral ConstructionPermit IssuedUGB CONSTRUCTION INC09/26/2024
DOB NOWSupported ScaffoldSigned-offUGB CONSTRUCTION INC04/30/2024
DOB NOWGeneral ConstructionPermit IssuedUGB CONSTRUCTION INC04/02/2024
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC03/29/2024
DOB NOWMechanical SystemsSigned-offUGB CONSTRUCTION INC03/29/2024
DOB NOWPlumbingSigned-offPLBG P & H INC08/07/2023
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC08/07/2023
DOB NOWSidewalk ShedSigned-offUGB CONSTRUCTION INC07/31/2023
DOB NOWSupported ScaffoldSigned-offUGB CONSTRUCTION INC03/29/2023
DOB NOWMechanical SystemsSigned-offUGB CONSTRUCTION INC03/01/2023
DOB NOWStructuralSigned-offUGB CONSTRUCTION INC02/28/2023
DOB NOWFoundationPermit IssuedUGB CONSTRUCTION INC02/28/2023
DOB NOWGeneral ConstructionPermit IssuedUGB CONSTRUCTION INC02/09/2023
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC02/06/2023
DOB NOWGeneral ConstructionSigned-offUGB CONSTRUCTION INC12/08/2022
DOB NOWGeneral ConstructionSigned-offUGB CONSTRUCTION INC05/21/2021
1 project · most recent 01/08/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2025Signed-offUGB CONSTRUCTION INCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Daikin RKI2NMVJU 13,000 BTU · Split System ×2
RZQ24TAVJUA 24,000 BTU · Split System ×2
RZQI8TAVJUA 18,000 BTU · Vrf Outdoor ×2
Heat / Cool
York AV20N1DP2L1AAA11A3 20 tons · Rooftop Unit ×4
AV25N1DP2L1AAAIIA3 25 tons · Rooftop Unit ×2
ZJ09ON18R2A1AAA1A3 8 tons · Rooftop Unit ×2
ZJ120N18R2A1AAA 1A3 10 tons · Rooftop Unit ×2
1 project · most recent 12/03/2025
FiledStatusContractorScope
12/03/2025Signed-offCASE PLUMBING LLC72 heads
2 projects · most recent 12/03/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
12/03/2025Signed-offJOHN FITZGERALD PLBG &HTGWater/Sanitary
08/09/2025Signed-offEXPERT PLUMBING & HEATINGGas, Storm, Water/Sanitary
7 projects · most recent 08/14/2026
General Wiring
FiledStatusContractorScope
08/14/2026CompleteEXPERT ELECTRIC.CONT NY IGeneral Wiring
09/08/2025Permit IssuedBERGER QUALITY ELEC'L CON—
08/31/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
03/27/2024Permit IssuedKWONG MING ELECTRIC INC—
03/02/2024Permit IssuedREAL POWER ELECTRIC INC1 meters
02/04/2024Permit IssuedREAL POWER ELECTRIC INCGeneral Wiring
01/31/2024Permit IssuedRICHARD NEU—
2 projects · most recent 11/14/2022
Steel Concrete Masonry
FiledStatusContractorScope
11/14/2022Signed-offUGB CONSTRUCTION INCSteel, Concrete, Masonry
11/14/2022Permit IssuedUGB CONSTRUCTION INC1 scope_items
1 project · most recent 10/10/2025
FiledStatusContractorScope
10/10/2025Permit IssuedCENTURION SOLAR ENERGY64 panels, 29.44 kw, 716.15 roof_area_sqft
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
07/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/02/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/19/2025Pass-Final House ConnectionPassView ↗
04/25/2025Fail-Final House ConnectionFailView ↗
10/04/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
03/11/2026Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
03/11/2026MasonrySERGEY BOLOTOVspecial
03/11/2026Energy Code Compliance InspectionsSERGEY BOLOTOVprogress
03/11/2026Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
03/11/2026Insulation placement and R valuesSERGEY BOLOTOVenergy_progress
03/11/2026Maintenance informationSERGEY BOLOTOVenergy_progress
03/11/2026Lighting controlsSERGEY BOLOTOVenergy_progress
03/11/2026Interior lighting powerSERGEY BOLOTOVenergy_progress
03/11/2026Fenestration areasSERGEY BOLOTOVenergy_progress
03/11/2026Fenestration air leakageSERGEY BOLOTOVenergy_progress
03/11/2026Protection of exposed foundation insulationSERGEY BOLOTOVenergy_progress
03/11/2026MeteringSERGEY BOLOTOVenergy_progress
03/11/2026Air barrier — testing SERGEY BOLOTOVenergy_progress
03/11/2026Permanent certificateSERGEY BOLOTOVenergy_progress
03/11/2026Electrical motors and elevatorsSERGEY BOLOTOVenergy_progress
03/11/2026Fenestration and door U-factor and product ratingsSERGEY BOLOTOVenergy_progress
03/11/2026Fire-Resistance Rated ConstructionSERGEY BOLOTOVprogress
12/22/2025Fenestration areasSERGEY BOLOTOVenergy_progress
12/22/2025Permanent certificateSERGEY BOLOTOVenergy_progress
12/22/2025Electrical motors and elevatorsSERGEY BOLOTOVenergy_progress
12/22/2025Maintenance informationSERGEY BOLOTOVenergy_progress
12/22/2025Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
12/22/2025Fenestration air leakageSERGEY BOLOTOVenergy_progress
12/22/2025MasonrySERGEY BOLOTOVspecial
12/22/2025Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
Latest 25 of 121.
▾Documents — 191 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/25/2026X00494901-I1Request digital key ↗
08/24/2026X00701346-P2Request digital key ↗
08/23/2026X00766361-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/13/2026X00494901-I1Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram5
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-P2Open ↗
08/18/2026X00632224-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/18/2026X00632224-I1Open ↗
08/13/2026X00632224-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026X00632224-I1Open ↗
▸Seals & Professional Certifications69
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/25/2026X00494901-I1Open ↗
08/24/2026X00701992-I1Open ↗
08/23/2026X00766361-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/23/2026X00703983-P1Open ↗
09/02/2026X01288971-I1Open ↗
09/01/2026X00701853-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026X00703983-P1Open ↗
09/23/2026X01286444-S2Open ↗
09/23/2026X01286444-S2Open ↗
Showing 3 of 17 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-I1Open ↗
08/18/2026X00632224-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-I1Open ↗
08/18/2026X00632224-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/18/2026X00632224-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/18/2026X00632224-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/18/2026X00632224-I1Open ↗
▸Environmental & Asbestos43
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
08/25/2026X00494901-I1Open ↗
08/23/2026X00766361-P1Open ↗
08/23/2026X00766361-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWOER: Notice to Proceed13
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-P2Open ↗
08/18/2026X00632224-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/18/2026X00632224-I1Open ↗
08/13/2026X00703983-I1Open ↗
08/13/2026X00766361-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00494901-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00703983-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026X00701853-I1Open ↗
08/13/2026X00701853-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00701853-I1Open ↗
▸Other Documents23
▸DOB NOWPlot Diagram7
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-P2Open ↗
08/18/2026X00632224-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial5
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-P2Open ↗
08/18/2026X00632224-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-I1Open ↗
08/18/2026X00632224-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/18/2026X00632224-P3Open ↗
08/18/2026X00632224-P2Open ↗
08/18/2026X00632224-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/18/2026X00632224-I1Open ↗