Public elementary, junior or senior high
J.h.s. 118 William W. Niles
2070 LAFONTAINE AVENUE · Tremont · BIN 2011995
💬 Discuss this project
1938Year Built
4Stories
W1Building Class
R7-1Zoning
100,600 sfGross Floor Area
1Units
LL97 Covered23 Open Violations 2 unresolved · 21 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 69,524 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Floor 3Under Construction1p · 1 filing · 13 docs
Floor 2
Floor 11p · 1 filing · 18 docs
Cellar1p · 1 filing · 18 docs
Site & exteriorUnder Construction39p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY SCHOOL CONSTRUCTION AUTHORITY3303/21/2026
SCHOOL CONSTRUCTION AUTHORITY1203/21/2026
NYC SCHOOL CONSTRUCTION AUTHORIT603/21/2026
NYC SCHOOL CONSTRUCTION AUTH203/21/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
NYC SCHOOL CONST AUTH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK CONSULTING SERVICES, INC311/25/2025
STV INCORPORATED202/02/2024
GREENMAN-PEDERSEN, INC.210/23/2023
SOLID ENGINEERING PC110/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREENMAN-PEDERSEN403/21/2026
STV403/21/2026
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOCTOR POWER COOLING & HEGeneral Contractor804/09/2026
N.B.A CONSTRUCTION INCGeneral Contractor409/10/2026
CHANDRAPAUL BHARRATTElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
DONALD WHITEElectrical103/21/2026
RISHI BUNSEEElectrical103/21/2026
SHERWIN GREENEElectrical103/21/2026
WHITESTONE CONSTRUCTION CORPGeneral Contractor107/08/2026
ADRIAN HYLTONElectrical103/21/2026
PANILI PLUMBING & HTG LLCPlumbing109/12/2026
CEDOMIR MARAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106211/25/2025
SOCOTEC ENGINEERING4983102/02/2024
FUTURE TECH CONSULTANTS O589210/23/2023
Building Lifecycle
All (118)Filed (8)Permit Issued (10)Signed Off (2)Violation (60)Inspection (1)Objection (12)Special Inspection (25)
09/10/2026
Permit issued — Plumbing
X00999716-S1-PL
09/09/2026
Permit issued — General Construction
X00999716-I1-ST
09/09/2026
Permit issued — General Construction
X00999716-I1-GC
05/12/2026
Violation issued (ECB, open)
Construction
05/12/2026
Violation issued (ECB, open)
Construction
05/12/2026
Violation issued (ECB, open)
Construction
03/17/2026
Permit issued — Support of Excavation
X01297184-I1-SE
02/23/2026
Permit issued — Mechanical Systems
X00698985-I1-MS
02/13/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
01/21/2026
Permit issued — Construction Fence
X01297175-I1-FN
01/21/2026
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW JOB # X00698985
X00946136-I1
12/03/2025
Objection raised — Other
12/03/2025
Objection raised — Other
11/25/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUPPORTING EXCAVATION FOR GC WORK AND UTILITIES INSTALLATION AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01297184-I1
11/25/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR GC WORK AND UTILITIES INSTALLATION AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01297175-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/02/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
08/26/2025
Violation issued (ECB, open)
Construction
08/26/2025
Violation issued (ECB, open)
Construction
08/26/2025
Violation issued (ECB, open)
Construction
08/26/2025
Violation issued (ECB, open)
Construction
09/27/2024
Violation issued (ECB, open)
Construction
09/27/2024
Violation issued (ECB, open)
Construction
03/06/2024
Objection resolved — Addressed
03/06/2024
Objection resolved — Addressed
03/06/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Noel Tolentino
02/20/2024
Objection raised — Other
02/20/2024
Objection raised — Other
02/08/2024
Permit issued — Mechanical Systems
X00698985-I1-MS
02/02/2024
Filed — Alteration
X118: Remove existing yard drains and sediment pits. Provide new yard drains, catch basins, outlet control structure, and trench drains.
X00999716-S1
02/02/2024
Filed — Alteration
X118: Remove existing yard drains and sediment pits. Provide new yard drains, catch basins, outlet control structure, and trench drains.
X00999716-I1
02/01/2024
Special inspection requirement — Final
Noel Tolentino
02/01/2024
Special inspection requirement — Concrete - Cast-In-Place
Noel Tolentino
02/01/2024
Special inspection requirement — Subgrade Inspections
Noel Tolentino
11/13/2023
Permit issued — Mechanical Systems
X00698985-I1-MS
11/08/2023
Permit issued — Construction Fence
X00946136-I1-FN
10/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
10/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
10/31/2023
Special inspection requirement — Maintenance information
Michael Marchese
10/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
10/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
10/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
10/31/2023
Special inspection requirement — Mechanical Systems
Noel Tolentino
10/31/2023
Special inspection requirement — Post-installed Anchors
Noel Tolentino
10/31/2023
Special inspection requirement — Final
Michael Marchese
10/29/2023
Objection resolved — Addressed
10/23/2023
Filed — Alteration
Install supplemental cooling for 1st floor Auditorium and stage using ductless split AC units and HEPA fan filter units. Install supplemental cooling for cellar Cafeteria using fan coil units and split DX units and add MERV-13 filter in existing supply.
X00698985-P1
10/20/2023
Special inspection requirement — Final
Michael Marchese
10/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
10/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
10/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
10/20/2023
Special inspection requirement — Maintenance information
Michael Marchese
10/20/2023
Special inspection requirement — Post-installed Anchors
Noel Tolentino
10/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
10/20/2023
Special inspection requirement — Mechanical Systems
Noel Tolentino
10/17/2023
Objection raised — Other
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPANILI PLUMBING & HTG LLC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedN.B.A CONSTRUCTION INC09/09/2026
DOB NOWGeneral ConstructionPermit IssuedN.B.A CONSTRUCTION INC09/09/2026
DOB NOWSupport of ExcavationPermit IssuedN.B.A CONSTRUCTION INC03/17/2026
DOB NOWMechanical SystemsPermit IssuedDOCTOR POWER COOLING & HE02/23/2026
DOB NOWConstruction FencePermit IssuedN.B.A CONSTRUCTION INC01/21/2026
DOB NOWMechanical SystemsPermit IssuedDOCTOR POWER COOLING & HE02/08/2024
DOB NOWMechanical SystemsPermit IssuedDOCTOR POWER COOLING & HE11/13/2023
DOB NOWConstruction FenceSigned-offDOCTOR POWER COOLING & HE11/08/2023
DOB NOWSupport of ExcavationSigned-offWHITESTONE CONSTRUCTION CORP03/17/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/13/2025
BISOTISSUEDENSOME BUILDERS INC04/11/2024
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/08/2024
BISOTISSUEDENSOME BUILDERS INC02/14/2024
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/07/2023
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/07/2023
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/07/2023
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/14/2023
BISPLISSUEDFORSYTHE P&H CORP12/28/2022
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/09/2022
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/09/2022
BISEQISSUEDWHITESTONE CONSTRUCTION CORP11/18/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/18/2022
BISPLISSUEDFORSYTHE P&H CORP01/06/2022
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/13/2021
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/13/2021
BISEQISSUEDWHITESTONE CONSTRUCTION CORP11/24/2021
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/28/2021
BISOTISSUEDENSOME BUILDERS INC02/24/2021
BISPLISSUEDFORSYTHE P&H CORP01/19/2021
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/30/2020
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/21/2020
BISOTISSUEDWHITESTONE CONSTRUCTION CORP12/15/2020
BISEQISSUEDWHITESTONE CONSTRUCTION CORP11/23/2020
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/14/2020
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/14/2020
BISPLISSUEDFORSYTHE P&H CORP01/27/2020
BISOTISSUEDWHITESTONE CONSTRUCTION CORP01/27/2020
BISEQISSUEDWHITESTONE CONSTRUCTION CORP01/07/2020
BISEQISSUEDWHITESTONE CONSTRUCTION CORP11/26/2019
+ 20 more permits on file
1 project · most recent 10/23/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/23/2023Permit IssuedDOCTOR POWER COOLING & HEAir Conditioning Systems
Cooling
Trane 4TTR6036A1 36,000 BTU · Condensing Unit ×16
FCB100 36,000 BTU · Fan Coil Indoor ×16
Mitsubishi Electric Indoor: PKA-A36KA7, Outdoor: PUY-A36NKA7 36,000 BTU · Ductwork ×16
Indoor: PKA-A18LA, Outdoor: PUY-A18NKA7 18,000 BTU · Ductwork ×4
1 project · most recent 02/02/2024
Storm
FiledStatusContractorScope
02/02/2024Permit IssuedPANILI PLUMBING & HTG LLCStorm
18 projects · most recent 09/11/2025
General Wiring Lighting
FiledStatusContractorScope
09/11/2025CompleteVIAL ELECTRIC & COMPANYLighting
08/07/2025CompleteKLK ELECTRIC, INC—
03/06/2025CompleteDNR ELECTRIC INCORPORATEGeneral Wiring
11/29/2023CompleteMNBC ELECTRICAL CORPGeneral Wiring
09/29/2023CompleteANCO ELECTL CONTCTNG INC—
05/17/2023CompleteANCO ELECTL CONTCTNG INC—
04/21/2023CompleteANCO ELECTL CONTCTNG INC—
04/03/2023CompleteALL VOLTS ELECTRICAL INCGeneral Wiring
11/03/2022Permit IssuedHEXAGON CONST & ELECL GRP—
11/03/2022CompleteHEXAGON CONST & ELECL GRP—
10/17/2022CompleteGEMINI ELECTRIC CO., INC.—
07/08/2022CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
05/31/2022CompleteI.S.M. ELECTRIC, INC.General Wiring
04/09/2021CompleteURBAN ELECTRICAL CORPGeneral Wiring
01/27/2020Permit IssuedSAMCO ELECTRIC CORP.—
2 projects · most recent 11/25/2025
Concrete
FiledStatusContractorScope
11/25/2025Permit IssuedN.B.A CONSTRUCTION INC2 scope_items
02/02/2024Permit IssuedPANILI PLUMBING & HTG LLCConcrete
1 project · most recent 11/25/2025
Fence
FiledStatusContractorScope
11/25/2025Permit IssuedN.B.A CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/13/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
10/02/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
03/06/2024Subsurface Conditions – Fill Placement & In-Place DensityNoel Tolentinospecial
02/01/2024FinalNoel Tolentinoprogress
02/01/2024Concrete - Cast-In-PlaceNoel Tolentinospecial
02/01/2024Subgrade InspectionsNoel Tolentinospecial
10/31/2023Energy Code Compliance InspectionsMichael Marcheseprogress
10/31/2023HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
10/31/2023Maintenance informationMichael Marcheseenergy_progress
10/31/2023HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
10/31/2023HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
10/31/2023Fire-Resistant Penetrations and JointsNoel Tolentinospecial
10/31/2023Mechanical SystemsNoel Tolentinospecial
10/31/2023Post-installed AnchorsNoel Tolentinospecial
10/31/2023FinalMichael Marcheseprogress
10/20/2023FinalMichael Marcheseprogress
10/20/2023HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
10/20/2023HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
10/20/2023HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
10/20/2023Maintenance informationMichael Marcheseenergy_progress
10/20/2023Post-installed AnchorsNoel Tolentinospecial
10/20/2023Energy Code Compliance InspectionsMichael Marcheseprogress
10/20/2023Fire-Resistant Penetrations and JointsNoel Tolentinospecial
10/20/2023Mechanical SystemsNoel Tolentinospecial
03/07/2022Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
03/07/2022Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00692947-I1Request digital key ↗
08/22/2026X00946136-I1Request digital key ↗
08/22/2026X00698985-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026X00946136-I1Open ↗
08/21/2026X00999716-I1Open ↗
08/21/2026X00999716-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026X00698985-P1Open ↗
08/26/2026X00692947-I1Open ↗
08/26/2026X00692947-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026X00698985-P1Open ↗
09/01/2026X00698985-P1Open ↗
08/25/2026X00999716-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
09/28/2020201029555Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026X01297175-I1Open ↗
08/13/2026X00946136-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00698985-I1Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026X00698985-I1Open ↗
08/13/2026X00946136-I1Open ↗
08/13/2026X00999716-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/15/2026X00999716-S1Open ↗
08/14/2026X00999716-I1Open ↗
08/13/2026X00946136-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026X00946136-I1Open ↗
08/13/2026X00692947-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/15/2026X00999716-S1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWNYCSCA Wrap-up Insurance2
08/13/2026X00698985-I1Open ↗
08/13/2026X00946136-I1Open ↗
▸Other Documents13
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
08/13/2026X00698985-P1Open ↗
08/13/2026X00999716-S1Open ↗
08/13/2026X00999716-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/17/2026X01297184-I1Open ↗
08/13/2026X00692947-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/13/2026X00692947-I1Open ↗
08/13/2026X00946136-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026X01297175-I1Open ↗