💬 Discuss this project
1911Year Built
5Stories
C6Building Class
R6AZoning
36,564 sfGross Floor Area
43Units
Rent Stabilized15 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: Park Gates · 8,914 sf lot · 4.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPark Gates project5p · 1 filing · 20 docs
Floor 5Park Gates project4p · 1 filing · 20 docs
Floor 4Park Gates project4p · 1 filing · 20 docs
Floor 3Park Gates project4p · 1 filing · 20 docs
Floor 2Park Gates project4p · 1 filing · 20 docs
Floor 1Park Gates project4p · 1 filing · 20 docs
CellarPark Gates project9p · 3 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed11p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Gates3807/08/2026
2068-72-78 Bathgate HDFC303/21/2026
Neighborhood Restore Housing103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ocv Architects903/22/2024
Joel Phagoo P.E401/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Betro Design Group403/21/2026
A1 Expediting Service803/21/2026
Ocv Architects503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
United One MechanicalPlumbing607/08/2026
Advanced Construction EquipmentScaffold507/08/2026
J-J PlumbingPlumbing207/08/2026
Akm Construction NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co5344503/22/2024
Joel Phagoo, PE2416101/05/2023
Building Lifecycle
All (106)Filed (13)Permit Issued (12)Signed Off (5)Violation (60)Inspection (9)Objection (1)Special Inspection (6)
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2024
Signed off — Alteration
Replacement of boiler equipment. no change is use, egress or occupancy.
X00354061-I1
04/16/2024
Violation issued (HPD, closed)
A
04/11/2024
Signed off — Alteration
X00980819-I1
04/01/2024
Signed off — Alteration
INSTALLATION OF NEW PLUMBING AND FIXTURES ON EXISTING ROUGHING. INSTALLATION OF NEW SPRINKLER SYSTEM.
X00344691-I1
03/25/2024
Special inspection requirement — Sprinkler Systems
MINA HANNA
03/22/2024
Filed — Alteration
INSTALLATION OF NEW PLUMBING AND FIXTURES ON EXISTING ROUGHING. INSTALLATION OF NEW SPRINKLER SYSTEM.
X00344691-P7
02/05/2024
Permit issued — Sprinklers
X00344691-I1-PL
01/10/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/09/2024
Permit issued — Boiler Equipment
X00980819-I1-BE
12/21/2023
Filed — Alteration
X00980819-I1
12/20/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING AND FIXTURES ON EXISTING ROUGHING. INSTALLATION OF NEW SPRINKLER SYSTEM.
X00344691-P6
12/20/2023
Special inspection requirement — Sprinkler Systems
MINA HANNA
12/13/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING AND FIXTURES ON EXISTING ROUGHING. INSTALLATION OF NEW SPRINKLER SYSTEM.
X00344691-P5
12/13/2023
Objection raised — Scope
12/12/2023
Filed — Alteration
Replacement of boiler equipment. no change is use, egress or occupancy.
X00354061-P1
12/12/2023
Filed — Alteration
Replacement of boiler equipment. no change is use, egress or occupancy.
X00354061-S1
12/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/11/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/11/2023
Special inspection requirement — Sprinkler Systems
MINA HANNA
11/16/2023
Violation issued (HPD, closed)
I
11/06/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING AND FIXTURES ON EXISTING ROUGHING. INSTALLATION OF NEW SPRINKLER SYSTEM.
X00344691-P4
11/01/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/30/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08047181-I1
07/10/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/31/2023
Permit issued — Sprinklers
X00344691-I1-EW-SP
05/31/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/11/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2023
Violation issued (HPD, closed)
B
04/02/2023
Violation issued (HPD, closed)
C
04/02/2023
Violation issued (HPD, closed)
B
03/31/2023
Violation issued (HPD, closed)
B
03/30/2023
Violation issued (HPD, closed)
B
03/30/2023
Violation issued (HPD, closed)
B
03/30/2023
Violation issued (HPD, closed)
B
03/30/2023
Violation issued (HPD, closed)
B
03/30/2023
Violation issued (HPD, closed)
C
03/30/2023
Violation issued (HPD, closed)
A
03/30/2023
Violation issued (HPD, closed)
C
03/30/2023
Violation issued (HPD, closed)
C
03/30/2023
Violation issued (HPD, closed)
C
03/30/2023
Violation issued (HPD, closed)
A
03/30/2023
Violation issued (HPD, closed)
A
03/03/2023
Permit issued — Sprinklers
X00344691-I1-PL
03/01/2023
Violation issued (HPD, closed)
C
03/01/2023
Violation issued (HPD, closed)
A
03/01/2023
Violation issued (HPD, closed)
C
03/01/2023
Violation issued (HPD, closed)
B
03/01/2023
Violation issued (HPD, closed)
B
03/01/2023
Violation issued (HPD, closed)
C
03/01/2023
Violation issued (HPD, closed)
C
03/01/2023
Violation issued (HPD, closed)
C
03/01/2023
Violation issued (HPD, closed)
A
03/01/2023
Violation issued (HPD, closed)
A
03/01/2023
Violation issued (HPD, closed)
A
03/01/2023
Violation issued (HPD, closed)
C
03/01/2023
Violation issued (HPD, closed)
C
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLogo Plumbing and Mechanical02/05/2024
DOB NOWBoiler EquipmentSigned-offLogo Plumbing and Mechanical01/09/2024
DOB NOWSprinklersSigned-offJ-J Plumbing05/31/2023
DOB NOWPlumbingSigned-offLogo Plumbing and Mechanical03/03/2023
DOB NOWSupported ScaffoldSigned-offAkm Construction NY01/10/2023
DOB NOWBoiler EquipmentSigned-offLogo Plumbing and Mechanical11/22/2022
DOB NOWSprinklersSigned-offJ-J Plumbing06/28/2022
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment04/08/2022
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment02/25/2022
DOB NOWPlumbingSigned-offLogo Plumbing and Mechanical12/17/2021
DOB NOWBoiler EquipmentSigned-offLogo Plumbing and Mechanical12/16/2021
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment01/13/2021
BIS—ISSUEDNotias Construction09/30/2022
BIS—ISSUEDNotias Construction11/09/2021
BIS—ISSUEDNotias Construction12/16/2020
BIS—ISSUEDFG-PH10/02/2020
BISPLISSUEDExpress Plumbing Sewr and WTR02/01/2008
BISOTISSUEDVrex Construction01/08/2008
5 projects · most recent 03/27/2024
Boiler Controls General Wiring
FiledStatusContractorScope
03/27/2024CompleteQueue Electrical ContractorsGeneral Wiring
02/14/2023CompleteG. Poulakis Electrical ContractingBoiler Controls
10/26/2022CompleteMonte Electric CoBoiler Controls
11/22/2021CompleteMonte Electric Co—
01/12/2021CompleteNash Electric Services—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/10/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/11/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/11/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/02/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/25/2024Sprinkler SystemsMINA HANNAspecial
12/20/2023Sprinkler SystemsMINA HANNAspecial
12/12/2023Tenant Protection Plan Compliance—special
12/11/2023Sprinkler SystemsMINA HANNAspecial
11/30/2022Post-installed AnchorsJOEL PHAGOOspecial
01/20/2022FinalJOEL PHAGOOprogress
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch - Plumbing5
08/22/2026X00344691-P7Request digital key ↗
08/22/2026X00344691-P6Request digital key ↗
08/22/2026X00344691-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/22/2026X00344691-P7Request digital key ↗
08/22/2026X00344691-P6Request digital key ↗
08/22/2026X00344691-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch3
08/23/2026X08047181-I1Request digital key ↗
08/21/2026X00980819-I1Request digital key ↗
08/15/2026X00354061-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/24/2026X00449252-P2Request digital key ↗
08/24/2026X00449252-I1Request digital key ↗
08/15/2026X00449252-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/26/2026X00354061-I1Request digital key ↗
08/15/2026X00354061-P1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
06/10/2024210180757Open ↗
04/15/2024210180757Open ↗
09/25/2023210180757Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
08/14/2023210180757Open ↗
10/03/2022210180757Open ↗
11/10/2021210180757Open ↗
Showing 3 of 6 on file for this type
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
04/23/2024210180757Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/23/2023210180757Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/24/2023210180757Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/09/2024210180757Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026X00354061-P1Open ↗
08/26/2026X00354061-S1Open ↗
08/26/2026X00354061-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00344691-P5Open ↗
08/25/2026X00344691-I1Open ↗
08/23/2026X08047181-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/20/2008210025792Open ↗
12/26/2007210025792Open ↗
12/26/2007210025792Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/26/2007210025792Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/26/2007210025792Open ↗
▸BISPC FULL REPORT1
12/26/2007210025792Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026X00449252-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
02/25/2008210025792Open ↗
02/15/2008210025792Open ↗
▸BISWATER CUT-OFF1
10/05/2020210180757Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan7
08/13/2026X00354061-P1Open ↗
08/13/2026X00344691-P4Open ↗
08/13/2026X00344691-P6Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
06/05/2020210180757Open ↗
▸BISTenant Protection Plan and Notes1
06/05/2020210180757Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026X00354061-P1Open ↗
08/26/2026X00354061-I1Open ↗
08/22/2026X00344691-P7Open ↗
Showing 3 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/07/2021210180757Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/26/2007210025792Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/10/2020210180757Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/18/2020210180757Open ↗
03/09/2020210180757Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
01/24/2024210180757Open ↗
01/24/2024210180757Open ↗
▸BISEXTERIOR LIGHTING POWER2
01/24/2024210180757Open ↗
01/24/2024210180757Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/24/2024210180757Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/24/2024210180757Open ↗
▸BISLIGHTING CONTROLS1
01/24/2024210180757Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/24/2024210180757Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/24/2024210180757Open ↗
▸BISINTERIOR LIGHTING POWER1
01/24/2024210180757Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/24/2024210180757Open ↗
▸BISFENESTRATION AREAS1
01/24/2024210180757Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00354061-I1Open ↗
▸Inspections & Test Reports9
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
01/24/2024210180757Open ↗
01/24/2024210180757Open ↗
▸BISMECHANICAL SYSTEMS2
01/24/2024210180757Open ↗
01/24/2024210180757Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
01/24/2024210180757Open ↗
01/24/2024210180757Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/24/2024210180757Open ↗
01/24/2024210180757Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/20/2020210180757Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/22/2026X00344691-I1Open ↗
08/22/2026X00344691-P7Open ↗
08/22/2026X00344691-P6Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
04/15/2024210180757Open ↗
09/06/2023210180757Open ↗
09/01/2023210180757Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/17/2020210180757Open ↗
03/09/2020210180757Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/26/2007210025792Open ↗
▸BISFINAL - PROVIDE SMOKE/CARBON MONOXIDE LETTER1
07/29/2024210180757Open ↗
▸BISSUPERSEDING LETTER1
12/17/2020210180757Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/20/2008210025792Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
06/05/2020210180757Open ↗
02/01/2008210025792Open ↗
01/08/2008210025792Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/24/2024210180757Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION6
05/08/2024210180757Open ↗
09/13/2023210180757Open ↗
07/01/2021210180757Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00449252-P2Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/05/2020210180757Open ↗
06/01/2020210180757Open ↗
▸BISSMOKE/CARBON MONOXIDE DETECTOR1
07/29/2024210180757Open ↗