1920Year Built
2Stories
B2Building Class
R7-1Zoning
1,600 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 24p · 1 filing · 15 docs
Floor 14p · 1 filing · 15 docs
Sub-Basement4p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BL CONSULTANT205/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H DESIGN STUDIO INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CJ HEATING & MECHANICAL CPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252205/02/2023
Building Lifecycle
All (27)Filed (2)Permit Issued (2)Inspection (7)Objection (12)Special Inspection (4)
01/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
05/25/2023
Special inspection requirement — Energy Code Compliance Inspections
BALDEMIRO LEON
05/24/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Scope
05/02/2023
Filed — Alteration
REMOVE OLD BOILER & OLD HWH IN THE BSMT & INSTALL TWO(2) NEW COMBINATION BOILER; INSTALL ONE ELECTRIC HWH. INSTALL NEW GAS PIPING; RELOCATE GAS METER TO THE OSP. ALL WORK AS PER PROPOSED PLAN SUBMITTED
X00659460-P1
03/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
02/05/2023
Special inspection requirement — Energy Code Compliance Inspections
BALDEMIRO LEON
02/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/29/2022
Permit issued — Plumbing
X00659460-I1-PL
11/01/2022
Permit issued — Plumbing
X00659460-I1-PL
06/30/2022
Objection raised — Admin
06/30/2022
Objection resolved — Addressed
06/30/2022
Objection raised — Other
06/30/2022
Objection resolved — Addressed
06/30/2022
Objection raised — Admin
06/30/2022
Objection resolved — Addressed
06/30/2022
Objection raised — Mechanical
06/30/2022
Objection resolved — Addressed
06/30/2022
Objection raised — Inspections
06/30/2022
Objection resolved — Addressed
06/28/2022
Filed — Alteration
REMOVE OLD BOILER & OLD HWH IN THE BSMT & INSTALL TWO(2) NEW COMBINATION BOILER; INSTALL ONE ELECTRIC HWH. INSTALL NEW GAS PIPING; RELOCATE GAS METER TO THE OSP. ALL WORK AS PER PROPOSED PLAN SUBMITTED
X00659460-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C12/29/2022
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C11/01/2022
1 project · most recent 05/02/2023
Gas Water/Sanitary
FiledStatusContractorScope
05/02/2023Permit IssuedCJ HEATING & MECHANICAL CGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/25/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
05/25/2023Energy Code Compliance InspectionsBALDEMIRO LEONprogress
02/05/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
02/05/2023Energy Code Compliance InspectionsBALDEMIRO LEONprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026X00659460-P1Request digital key ↗
08/15/2026X00659460-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X00659460-P1Open ↗
08/13/2026X00659460-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00659460-P1Open ↗
09/01/2026X00659460-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X00659460-P1Open ↗
09/01/2026X00659460-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X00659460-P1Open ↗
08/13/2026X00659460-I1Open ↗
▸Other Documents4
▸DOB NOWDHCR Document4
08/13/2026X00659460-I1Open ↗
08/13/2026X00659460-I1Open ↗
08/13/2026X00659460-P1Open ↗
Showing 3 of 4 on file for this type