ECB10/23/2026The respondent has failed to comply with the commissioner's order and to file a certification of correction with the department of buildings for a class i violation issued on 02/20/2026. Ref ECB: 39550649Y.file$1K due
ECB06/23/2026During inspection of a closed 4-story NB, and upon reviewing the DOB system, it was revealed that the permit holder had failed to comply with the commissioner's order and timely provide a certificate of correct$1K due
ECB04/16/2026At the time of my inspection of a closed proposed 4-story NB. Upon reviewing the DOB system, it was revealed. That the permit holder failed to timely provide a certification of correction for class one violatio$1K due
ECB02/20/2026Gc-626425 observed floor framing consisting of cold form steel and dragon board. Upon review of provided approved drawings it shows floors is to metal deck with poured concrete topping & rebar. NoΓ’ specialΓ’ in$2K due
ECB02/20/20263301.13.8- observed jobsite with multiple unsafe/violating conditions. Jobsite with soe work done w/out issued permit, work contrary to approved plans, no design drawings for temp stairs and inadequate fire ext$2K due
ECB08/19/2026General contractor failed to file certificate of correction with the DOB. No corrective measures on record for violation# 039550649Y-issued 2-20-2026...Hearing held β result not yet published$1K proposed
ECB02/24/2026Gc-626425 (1704.1.2)- observed active jobsite in currently @ 4TH floor. Work consist of cold form steel and dragon board. Upon review of DOB records there are no special inspection reports (TR1) for cold form sHearing held β result not yet published$2K proposed
ECB02/24/2026Gc 626425-on active jobsite observed inadequate housekeeping in multiple locations. Rear yard of jobsite with large amount of cmu and other construction debris/materials. On floors of jobsite construction debriHearing held β result not yet published$1K proposed
ECB01/02/2026On active jobsite observed stay-form installed into foundation walls @ expos 2&4. Upon review of DOB approved soe plans provided, there are no indications for the use of stay form. Stop all soe and foundation wNothing owed β awaiting certificate of correction
Zoned residential, not Manhattan Β· Owner of record: Honeywell BX Mazal Β· 2,474 sf lot Β· 0 FAR built Β· Flood zone X