FILING FOR INSTALLATION OF NEW HOT WATER FLOW METER AS PER PLANS. WORK INCLUDES PROVIDING A BTU METER TO MEASURE SUPPLY AND RETURN TEMPERATURE & TO RE-INSTALLED ALL DISTURBED PIPING, ASSOCIATED SUPPORT AND RE-INSULATE DISTURBED PIPING AS PER SPECIFICATION
HEREWITH FILING FOR LIKE-TO-LIKE REPLACEMENT OF EXISTING DAMPER AND/OR ACTUATOR ASSEMBLY ON THE 3RD FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents · 12 drawing sheets
▾Design Consultants (Architect / Engineer of Record)