← Back
Public elementary, junior or senior high
2075 WEBSTER AVENUE
BRONX · BIN 2013297
💬 Discuss this project
1977Year Built
3Stories
W1Building Class
R7-1Zoning
118,524 sfGross Floor Area
2Units
LL97 Covered5 Open Violations 4 unresolved · 1 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 23,000 sf lot · 5.15 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 3 filings · 20 docs
Floor 4Under Construction10p · 2 filings · 20 docs
Floor 3Under Construction10p · 3 filings · 20 docs
Floor 2Under Construction10p · 2 filings · 20 docs
Floor 1Under Construction12p · 6 filings · 20 docs
CellarUnder Construction9p · 2 filings · 20 docs
2 jobs · most recent 07/26/2024
Generators
FiledStatusContractorScopeMake / Model / Capacity
07/26/2024Signed-offLEON D. DEMATTEIS CONSTGenerators
Generators
Mtu Onsite Energy DS230 658 kW · Generator ×1
10/07/2021——Generators
Generators
Kohler 230REOZJE 230 kW · Generator ×1
2 jobs · most recent 03/10/2025
FiledStatusContractorScope
03/10/2025——1 outlets
03/24/2023Permit IssuedCURRENT FIRE PROTECTION I764 heads, 3 outlets
7 jobs · most recent 03/19/2024
General Wiring
FiledStatusContractorScope
03/19/2024CompleteMULTI-PHASE ELEC'L SVCS1 meters, 1 new_meters
10/28/2022Permit IssuedMULTI-PHASE ELEC'L SVCS—
10/17/2022CompleteMULTI-PHASE ELEC'L SVCSGeneral Wiring
09/29/2022CompleteSTANCO SYSTEM ELEC'L CONT—
04/27/2022Permit IssuedMULTI-PHASE ELEC'L SVCS1 meters, 1 new_meters
04/14/2021CompleteJAMCOB ELECTRIC LLCGeneral Wiring
12/17/2018CompleteCHARAN ELEC'L ENTERP'S IN—
2 jobs · most recent 09/19/2025
FiledStatusContractorScope
09/19/2025Permit IssuedISLAND FOUNDATIONS CORP2 scope_items
03/27/2023Permit IssuedISLAND FOUNDATIONS CORP1 scope_items
2 jobs · most recent 09/29/2025
Fence Sidewalk Shed
FiledStatusContractorScope
09/29/2025Permit IssuedLEON D. DEMATTEIS CONSTFence
11/27/2024Permit IssuedPJP INSTALLERS INCSidewalk Shed
Building Lifecycle
All (250)Filed (48)Permit Issued (52)Signed Off (7)Violation (60)Inspection (15)Objection (42)Special Inspection (26)
09/18/2026
Permit issued — Construction Fence
X00776249-I1-FN
05/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Permit issued — Sprinklers
X00602152-I1-EW-SD
04/22/2026
Permit issued — Sprinklers
X00602152-I1-EW-SP
02/11/2026
Permit issued — Support of Excavation
X01289518-I1-SE
01/30/2026
Violation issued (ECB, closed)
Unknown
01/14/2026
Violation issued (ECB, closed)
Construction
12/09/2025
Permit issued — Support of Excavation
X01289518-I1-SE
11/21/2025
Signed off — Alteration
Installation of temporary standpipe
X00886470-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2025
Objection resolved — Addressed
11/06/2025
Signed off — Alteration
Convert existing wet standpipe to dry standpipe to serve as temporary protection during demolition.
X01228569-I1
10/24/2025
Signed off — Full Demolition
mechanical means will be used to assist with demolition, and temporary/provisional ramp will be used to move equipment between floors.
X01049100-I1
10/21/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
10/16/2025
Objection resolved — Addressed
10/09/2025
Permit issued — Standpipe
X01049100-S2-EW-SD
10/08/2025
Permit issued — Sprinklers
X01049100-S1-EW-SP
09/30/2025
Objection raised — Other
09/30/2025
Objection raised — Admin
09/29/2025
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE WORK FOR DEMOLITION AND ROCK REMOVAL PHASE IN CONJUNCTION WITH JOB# 201204446, RELATED APPLICATION FOR FN IS SOE: SOE-X00764837
X00776249-P4
09/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/19/2025
Filed — Alteration
SOE FOR NEW PLAYGROUND AT PS 163X.
X01289518-I1
09/18/2025
Permit issued — Construction Fence
X00776249-I1-FN
09/18/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
09/03/2025
Signed off — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD FOR ACCESS TO WORK LOCATIONS.
X01144415-I1
08/29/2025
Permit issued — Sidewalk Shed
X00776254-I1-SH
08/01/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/11/2025
Permit issued — Standpipe
X01228569-I1-EW-SD
07/11/2025
Permit issued — Full Demolition
X01049100-I1-FD
07/02/2025
Permit issued — Earth Work
X00669358-I1-EA
07/02/2025
Permit issued — Support of Excavation
X00818298-I1-SE
07/01/2025
Objection resolved — Addressed
06/24/2025
Permit issued — Protection and Mechanical Methods
X01049100-S6-PMM
06/10/2025
Permit issued — Support of Excavation
X00818298-I1-SE
06/09/2025
Permit issued — Support of Excavation
X00764837-I1-SE
06/02/2025
Objection raised — Other
05/21/2025
Filed — Alteration
Convert existing wet standpipe to dry standpipe to serve as temporary protection during demolition.
X01228569-I1
05/20/2025
Objection resolved — Addressed
05/20/2025
Special inspection requirement — Standpipe Systems
Noel Tolentino
05/15/2025
Permit issued — Protection and Mechanical Methods
X01049100-S4-PMM
05/15/2025
Permit issued — Protection and Mechanical Methods
X01049100-S5-PMM
05/14/2025
Objection raised — Other
05/08/2025
Violation issued (ECB, closed)
Unknown
05/08/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Violation issued (ECB, closed)
Site Safety
05/01/2025
Filed — Full Demolition
mechanical means will be used to assist with demolition, and temporary/provisional ramp will be used to move equipment between floors.
X01049100-S6
04/25/2025
Objection resolved — Addressed
04/15/2025
Objection resolved — Addressed
04/04/2025
Objection raised — Admin
04/01/2025
Objection resolved — Addressed
03/31/2025
Permit issued — Standpipe
X00602152-I1-EW-SD
03/31/2025
Permit issued — Sprinklers
X00602152-I1-EW-SP
03/20/2025
Violation issued (ECB, closed)
Construction
03/20/2025
Violation issued (ECB, closed)
Unknown
03/20/2025
Violation issued (ECB, closed)
Construction
03/18/2025
Signed off — Alteration
Facade Repair | Exterior Facade Caulking | Exterior Waterproofing
X00967435-I1
03/12/2025
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD FOR ACCESS TO WORK LOCATIONS.
X01144415-P1
03/12/2025
Objection raised — Other
Latest 60 of 250 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY SCHOOL CONSTRUCTION AUTHORITY507/08/2026
DEPARTMENT OF EDUCATION703/22/2026
DOE PS 163 040503/22/2026
DOE PS 163203/22/2026
DOE203/22/2026
P.S.163 D.O.E.703/22/2026
D.O.E. P.S.163 0403/22/2026
DEPT OF EDUCATION P.S.16103/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
P.S.163 DEPARTMENT OF ED303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
360 ENGINEERING P.C.1109/29/2025
VACHRIS ENGINEERING, PC409/19/2025
WAVIC ENGINEERING PLLC105/21/2025
SOUTH BAY ENGINEERING PLLC1005/01/2025
SEAN P. CUNNINGHAM PE, PC503/10/2025
DATTNER ARCHITECTS508/20/2024
SETTY707/26/2024
HOWARD I SHAPIRO & ASSOCIATES110/10/2022
AME SERVICES INC105/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH POINT PIPING PROTECTION1003/21/2026
JM ZONING, LLC.603/21/2026
A1 EXPEDITING SERVICE CORP.1103/21/2026
AME SERVICES203/21/2026
JMV ASSOCIATES1003/21/2026
EXPEDITE DEM1003/21/2026
HOWARD I SHAPIRO ASSOCIATES203/21/2026
RIGGING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEON D. DEMATTEIS CONSTGeneral Contractor1909/19/2026
ISLAND FOUNDATIONS CORPGeneral Contractor1607/08/2026
CURRENT FIRE PROTECTION INCFire Protection1108/26/2026
STATEWIDE DEMOLITION CORP.General Contractor807/08/2026
PJP INSTALLERS INCGeneral Contractor807/08/2026
OLYMPIC PLBG & HTG SVCSFire Protection307/08/2026
MULTI-PHASE ELEC'L SVCSElectrical103/22/2026
SPENCER CONTRACTING, LLCGeneral Contractor107/08/2026
GIAQUINTO MASONRY INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106109/19/2025
SOCOTEC ENGINEERING4983605/21/2025
FUTURE TECH CONSULTANTS O589203/12/2025
TWIN PEAKS INC.3171407/26/2024
PCS ENGINEERING3745202/06/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST09/18/2026
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION INC04/22/2026
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION INC04/22/2026
DOB NOWSupport of ExcavationPermit IssuedISLAND FOUNDATIONS CORP02/11/2026
DOB NOWSupport of ExcavationPermit IssuedLEON D. DEMATTEIS CONST12/09/2025
DOB NOWStandpipeSigned-offOLYMPIC PLBG & HTG SVCS10/09/2025
DOB NOWSprinklersSigned-offOLYMPIC PLBG & HTG SVCS10/08/2025
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST09/18/2025
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC08/29/2025
DOB NOWStandpipeSigned-offOLYMPIC PLBG & HTG SVCS07/11/2025
DOB NOWFull DemolitionSigned-offSTATEWIDE DEMOLITION CORP.07/11/2025
DOB NOWEarth WorkPermit IssuedLEON D. DEMATTEIS CONST07/02/2025
DOB NOWSupport of ExcavationPermit IssuedISLAND FOUNDATIONS CORP07/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offSTATEWIDE DEMOLITION CORP.06/24/2025
DOB NOWSupport of ExcavationPermit IssuedISLAND FOUNDATIONS CORP06/10/2025
DOB NOWSupport of ExcavationPermit IssuedLEON D. DEMATTEIS CONST06/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offSTATEWIDE DEMOLITION CORP.05/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offSTATEWIDE DEMOLITION CORP.05/15/2025
DOB NOWStandpipePermit IssuedCURRENT FIRE PROTECTION I03/31/2025
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION I03/31/2025
DOB NOWGeneral ConstructionSigned-offSTATEWIDE DEMOLITION CORP.03/03/2025
DOB NOWGeneral ConstructionSigned-offSTATEWIDE DEMOLITION CORP.03/03/2025
DOB NOWGeneral ConstructionSigned-offSTATEWIDE DEMOLITION CORP.03/03/2025
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC01/17/2025
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST09/30/2024
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC09/06/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP07/30/2024
DOB NOWSupport of ExcavationPermit IssuedISLAND FOUNDATIONS CORP07/05/2024
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I06/17/2024
DOB NOWEarth WorkPermit IssuedLEON D. DEMATTEIS CONST05/21/2024
DOB NOWSuspended ScaffoldSigned-offKINGS COUNTY WATERPROOFIN04/08/2024
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION I04/02/2024
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION I04/02/2024
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONST02/12/2024
DOB NOWSupport of ExcavationPermit IssuedISLAND FOUNDATIONS CORP01/25/2024
DOB NOWSuspended ScaffoldSigned-offKINGS COUNTY WATERPROOFIN01/02/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP12/21/2023
DOB NOWSupport of ExcavationPermit IssuedISLAND FOUNDATIONS CORP11/09/2023
DOB NOWSupport of ExcavationPermit IssuedLEON D. DEMATTEIS CONST11/09/2023
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST10/10/2023
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/21/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
09/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/01/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/06/2025Pass-Final PL - UndergroundPassView ↗
10/16/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/23/2024Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/23/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
08/02/2024Fail-Final PL - UndergroundFailView ↗
09/20/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/20/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/26/2022Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/18/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
05/20/2025Standpipe SystemsNoel Tolentinospecial
02/24/2025Standpipe Systems—special
10/23/2024DemolitionNoel Tolentinospecial
08/27/2024FinalNoel Tolentinoprogress
08/27/2024Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
08/27/2024FinalNoel Tolentinoprogress
08/27/2024Sprinkler SystemsNoel Tolentinospecial
08/27/2024Standpipe SystemsNoel Tolentinospecial
08/27/2024FinalNoel Tolentinoprogress
08/27/2024Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
08/21/2024Public Assembly Emergency LightingMIKHAIL ZEYGMANprogress
08/20/2024Public Assembly Emergency LightingMIKHAIL ZEYGMANprogress
07/24/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsMIKHAIL ZEYGMANspecial
06/17/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsMIKHAIL ZEYGMANspecial
06/04/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsMIKHAIL ZEYGMANspecial
03/25/2024Public Assembly Emergency LightingMIKHAIL ZEYGMANprogress
02/01/2024Post-installed AnchorsMichael Walshspecial
12/28/2023Post-installed AnchorsMichael Walshspecial
03/31/2023Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
03/24/2023Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
11/10/2022Standpipe SystemsMIKHAIL ZEYGMANspecial
11/10/2022Sprinkler SystemsMIKHAIL ZEYGMANspecial
11/10/2022Post-installed AnchorsMIKHAIL ZEYGMANspecial
11/10/2022Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
Latest 25 of 26.
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch44
08/25/2026X00526432-I1Request digital key ↗
08/25/2026X00589921-S1Request digital key ↗
08/25/2026X00589921-I1Request digital key ↗
Showing 3 of 44 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/25/2026X00590016-I1Request digital key ↗
08/21/2026X00590045-P3Request digital key ↗
08/21/2026X00590045-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/22/2024201204446Open ↗
▸Seals & Professional Certifications72
▸DOB NOWDPL-1: Design Professional Seal & Signature47
08/25/2026X00526432-I1Open ↗
08/25/2026X00590016-I1Open ↗
08/25/2026X00589921-S1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026X00589996-I1Open ↗
09/23/2026X00589996-S2Open ↗
09/01/2026X01289518-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026X00590045-P3Open ↗
08/29/2026X00590045-I1Open ↗
08/29/2026X00590045-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026X01049100-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01049100-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01049100-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01049100-I1Open ↗
▸Safety & Tenant Protection13
▸DOB NOWNYCSCA - Approved Site Safety Plans13
08/13/2026X08016023-I1Open ↗
08/13/2026X00776249-P4Open ↗
08/13/2026X00776249-P2Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/20/2026X01102848-S2Open ↗
08/20/2026X01102848-I1Open ↗
08/20/2026X01102848-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026X01049100-I1Open ↗
08/20/2026X01049100-S2Open ↗
▸DOB NOWRodent Control1
08/13/2026X01049100-I1Open ↗
▸Approvals, Objections & Sign-offs114
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter49
08/24/2026X00764837-I1Open ↗
Showing 1 of 49 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)43
08/13/2026X00602152-P4Open ↗
08/13/2026X01049100-I1Open ↗
08/13/2026X01102848-S1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)20
08/13/2026X01049100-S2Open ↗
08/13/2026X01049100-S1Open ↗
08/13/2026X01049100-S3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP Variance (V5) letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents65
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal44
08/13/2026X00590045-P3Open ↗
08/13/2026X00590045-P2Open ↗
08/13/2026X00590045-P1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWAdjoining Owners Notification4
08/13/2026X00818298-I1Open ↗
08/13/2026X00764837-I1Open ↗
08/13/2026X01289518-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWNYCSCA Exhibit 24
08/13/2026X01049100-S5Open ↗
08/13/2026X00526432-I1Open ↗
08/13/2026X01228569-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAlternate Plan 14
08/21/2026X00590045-P3Open ↗
08/21/2026X00590045-P2Open ↗
08/15/2026X00590045-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026X00967435-P1Open ↗
08/13/2026X00967435-I1Open ↗
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCommunity Board Notification1
08/13/2026X01049100-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01049100-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026X01102848-S1Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type