← Back
Two family frame
208-28 15 DRIVE
QUEENS · BIN 4130963
💬 Discuss this project
1975Year Built
2Stories
B2Building Class
R4Zoning
3,267 sfGross Floor Area
2Units
Two family frame · 3,200 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR104/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281104/15/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/24/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 15 modules, 6.6 KW
Q01387558-I1
04/27/2026
Permit issued — Solar
Q01387558-I1-SL
04/15/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 15 modules, 6.6 KW
Q01387558-I1
04/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
04/15/2026
Special inspection requirement — Final
Mina Makar
04/15/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR04/27/2026
1 project · most recent 04/15/2026
FiledStatusContractorScope
04/15/2026CompleteISLAND ELECTRIC CORP—
1 project · most recent 04/15/2026
FiledStatusContractorScope
04/15/2026Signed-offMOMENTUM SOLAR15 panels, 6.6 kw, 264 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/15/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
04/15/2026Fire-Resistant Penetrations and JointsMina Makarspecial
04/15/2026Energy Code Compliance InspectionsMina Makarprogress
04/15/2026FinalMina Makarprogress
04/15/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01387558-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01387558-I1Open ↗
08/27/2026Q01387558-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01387558-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01387558-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01387558-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01387558-I1Open ↗