← Back
Two family frame
208 MALLORY AVENUE
STATEN ISLAND · BIN 5047690
💬 Discuss this project
1920Year Built
1.67Stories
B2Building Class
R3-1Zoning
1,506 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 6,600 sf lot · 0.23 FAR built · Flood zone X500
Locations of Work
Plumbing
Cellar2p · 1 filing · 10 docs
1 job · most recent 02/25/2024
FiledStatusContractorScope
02/25/2024CompleteI.P. ELECTRIC INC—
Building Lifecycle
All (24)Filed (3)Permit Issued (2)Signed Off (2)Violation (4)Inspection (4)Special Inspection (9)
12/10/2024
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S00986759-I1
03/07/2024
Permit issued — Solar
S00986759-I1-SL
02/25/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S00986759-I1
02/22/2024
Signed off — Alteration
INSTALL NEW GAS BOILER AND H.W.H IN THE EXISTING 1 STORY BUILDING. REMOVE AND CAP EXISTING OIL TANK & OIL BOILER. DEMOLITION WORK AND PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00947531-I1
01/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
01/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
01/12/2024
Filed — Alteration
INSTALL NEW GAS BOILER AND H.W.H IN THE EXISTING 1 STORY BUILDING. REMOVE AND CAP EXISTING OIL TANK & OIL BOILER. DEMOLITION WORK AND PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00947531-P1
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
01/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
01/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
01/07/2024
Special inspection requirement — Final
Chun Feng
01/07/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
01/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
01/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
12/22/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/19/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/27/2023
Permit issued — Plumbing
S00947531-I1-PL
10/24/2023
Filed — Alteration
INSTALL NEW GAS BOILER AND H.W.H IN THE EXISTING 1 STORY BUILDING. REMOVE AND CAP EXISTING OIL TANK & OIL BOILER. DEMOLITION WORK AND PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00947531-I1
08/01/2007
Violation issued (ECB, closed)
Construction
11/27/2006
Violation issued (ECB, closed)
Construction
02/22/2006
Violation issued (ECB, closed)
Construction
11/18/2005
Violation issued (ECB, closed)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT102/25/2024
NIC 88 CORP201/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERGY SOLAR INCGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802102/25/2024
NIC 88 CORP8371201/12/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC03/07/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/27/2023
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/18/2024Energy Code Compliance InspectionsEric Sunprogress
01/18/2024Fire-Resistant Penetrations and JointsEric Sunspecial
01/12/2024Fire-Resistant Penetrations and JointsEric Sunspecial
01/12/2024Energy Code Compliance InspectionsEric Sunprogress
01/07/2024Energy Code Compliance InspectionsChun Fengprogress
01/07/2024FinalChun Fengprogress
01/07/2024Air barrier - visual inspectionChun Fengenergy_progress
01/07/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
01/07/2024Fire-Resistant Penetrations and JointsChun Fengspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S00947531-P1Request digital key ↗
08/21/2026S00947531-I1Request digital key ↗
08/21/2026S00986759-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026S00947531-P1Open ↗
08/23/2026S00986759-I1Open ↗
08/23/2026S00986759-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026S00947531-P1Open ↗
08/23/2026S00986759-I1Open ↗
08/23/2026S00986759-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026S00947531-P1Open ↗
08/21/2026S00947531-I1Open ↗
08/13/2026S00986759-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026S00947531-I1Open ↗
08/21/2026S00947531-P1Open ↗
08/13/2026S00986759-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00986759-I1Open ↗