← Back
One family attached or semi-detached
208 TYSENS LANE
STATEN ISLAND · Oakwood-Richmondtown · BIN 5059639
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R3-1Zoning
1,152 sfGross Floor Area
1Units
One family attached or semi-detached · 2,780 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/23/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
05/05/2026
Permit issued — Solar
S01389186-I1-SL
04/23/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01389186-I1
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/23/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/17/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC05/05/2026
1 project · most recent 04/23/2026
FiledStatusContractorScope
04/23/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/23/2026
FiledStatusContractorScope
04/23/2026Permit IssuedSUNRUN INSTALLATION SVC11 panels, 4.95 kw, 231 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/23/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/23/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/17/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/17/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/17/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026S01389186-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01389186-I1Open ↗
08/25/2026S01389186-I1Open ↗
08/25/2026S01389186-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01389186-I1Open ↗
08/25/2026S01389186-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/26/2026S01389186-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026S01389186-I1Open ↗