← Back
BRONX
2080 CAESAR PLACE
BRONX · BIN 2131325
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Roof4p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 35p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Basement5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P GEORGOPOULOS ARCHITECT PC808/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMILJANO CONSTRUCTION INCGeneral Contractor108/07/2026
Building Lifecycle
All (46)Filed (8)Permit Issued (3)Inspection (1)Objection (5)Special Inspection (29)
08/13/2026
Filed — New Building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
X01320059-S6
08/06/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE IN CONJUNCTION WITH DEMOLITION X01332515-I1 AND NEW BUILDING X01320059-I1.
X01441309-I1
08/06/2026
Permit issued — Construction Fence
X01441309-I1-FN
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Permit issued — Full Demolition
X01332515-I1-FD
04/23/2026
Permit issued — Construction Fence
X01390906-I1-FN
04/09/2026
Objection raised — Admin
04/02/2026
Objection raised — Admin
03/30/2026
Filed — New Building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
X01320059-S4
03/30/2026
Filed — New Building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
X01320059-S5
02/10/2026
Objection raised — Admin
02/10/2026
Objection raised — Structural
02/09/2026
Objection raised — Admin
01/26/2026
Filed — New Building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
X01320059-S3
01/26/2026
Filed — New Building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
X01320059-S2
01/26/2026
Filed — New Building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
X01320059-S1
01/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/26/2026
Special inspection requirement — Concrete - Cast-In-Place
01/26/2026
Special inspection requirement — Subgrade Inspections
01/26/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
01/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/26/2026
Special inspection requirement — Subgrade Inspections
12/10/2025
Filed — New Building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
X01320059-I1
12/08/2025
Special inspection requirement — Sprinkler Systems
12/08/2025
Special inspection requirement — Final
12/08/2025
Special inspection requirement — Footing and Foundation
12/08/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
12/08/2025
Special inspection requirement — Metering
12/08/2025
Special inspection requirement — Air barrier — testing
11/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
11/17/2025
Special inspection requirement — Interior lighting power
11/17/2025
Special inspection requirement — Air barrier - visual inspection
11/17/2025
Special inspection requirement — Lighting controls
11/17/2025
Special inspection requirement — Maintenance information
11/17/2025
Special inspection requirement — Fenestration areas
11/17/2025
Special inspection requirement — Lighting in dwelling units
11/17/2025
Special inspection requirement — Exterior lighting power
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/17/2025
Special inspection requirement — Protection of exposed foundation insulation
11/17/2025
Special inspection requirement — Insulation placement and R values
11/17/2025
Special inspection requirement — Fenestration air leakage
11/17/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
11/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/01/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedEMILJANO CONSTRUCTION INC08/06/2026
DOB NOWFull DemolitionSigned-offBORI CONSTRUCTION CORP06/16/2026
DOB NOWConstruction FencePermit IssuedEMILJANO CONSTRUCTION INC04/23/2026
1 project · most recent 08/13/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana PTC093G 9,200 BTU · Ptac ×42
PTC153G 15,000 BTU · Ptac ×19
Heating
Amana PTC093G 8,500 BTU · Ptac ×42
PTC153G 17,100 BTU · Ptac ×19
Ventilation
Greenheck SQ-97-VG 150 CFM · Exhaust Fan ×19
ERV-10-20L-VG 325 CFM · Erv ×1
SP-A125 100 CFM · Exhaust Fan ×1
1 project · most recent 08/13/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/13/2026——Storm, Water/Sanitary
1 project · most recent 08/13/2026
Concrete
FiledStatusContractorScope
08/13/2026——Concrete
1 project · most recent 08/06/2026
Fence
FiledStatusContractorScope
08/06/2026Permit IssuedEMILJANO CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/05/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Excavations - Sheeting, Shoring, and Bracing—special
01/26/2026Concrete - Cast-In-Place—special
01/26/2026Subgrade Inspections—special
01/26/2026Subsurface Conditions – Fill Placement & In-Place Density—special
01/26/2026Subsurface Investigations (Borings/Test Pits)—special
01/26/2026Subsurface Investigations (Borings/Test Pits)—special
01/26/2026Subgrade Inspections—special
12/08/2025Sprinkler Systems—special
12/08/2025Final—progress
12/08/2025Footing and Foundation—progress
12/08/2025Alternative Materials - OTCR Buildings Bulletin Number—special
12/08/2025Metering—energy_progress
12/08/2025Air barrier — testing —energy_progress
11/17/2025Fenestration and door U-factor and product ratings—energy_progress
11/17/2025Interior lighting power—energy_progress
11/17/2025Air barrier - visual inspection—energy_progress
11/17/2025Lighting controls—energy_progress
11/17/2025Maintenance information—energy_progress
11/17/2025Fenestration areas—energy_progress
11/17/2025Lighting in dwelling units—energy_progress
11/17/2025Exterior lighting power—energy_progress
11/17/2025Fire-Resistant Penetrations and Joints—special
11/17/2025Protection of exposed foundation insulation—energy_progress
11/17/2025Insulation placement and R values—energy_progress
Latest 25 of 29.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026X01320059-S4Request digital key ↗
08/17/2026X01320059-S6Request digital key ↗
08/17/2026X01320059-S5Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026X01320059-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X01320059-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026X01320059-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026X01320059-S4Open ↗
08/17/2026X01320059-S6Open ↗
08/17/2026X01320059-S5Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026X01320059-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026X01320059-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026X01320059-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026X01320059-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026X01320059-I1Open ↗